13 pending office actions • 11 art units • 13 examiners • 0 of 13 (0%) have an AI response strategy ready • 113 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 13 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 13 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (8%) |
| §103 only | 10 (77%) |
| §102 only | 1 (8%) |
| §112 only | 1 (8%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KIM, SANG K | 1 | 81.2% | +10.3% |
| AMAR, MARC J | 1 | 74.9% | +38.3% |
| MORRIS, TAYLOR L | 1 | 59.4% | +35.7% |
| BAUER, SCOTT ALLEN | 1 | 82.5% | +13.0% |
| PHILLIPS, FORREST M | 1 | 83.3% | +14.3% |
| MCANDREW, CHRISTOPHER P | 1 | 85.8% | +14.0% |
| CASTELLANO, STEPHEN J | 1 | 64.9% | +36.1% |
| KAZIMI, MAHMOUD M | 1 | 64.7% | +15.8% |
| INSERRA, MADISON RENEE | 1 | 68.4% | +36.6% |
| RAEVIS, ROBERT R | 1 | 83.2% | +15.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18676035 | ENHANCED INTERFACE FOR CHECKING AND NEUTRALIZING AN ELECTRICAL POWER SUPPLY LINE OF AN AIRCRAFT AND AIRCRAFT COMPRISING SUCH AN INTERFACE | MCANDREW, CHRISTOPHER P | 19d overdue |
| 18533452 | METHOD FOR ANALYZING A PART USING NON-DESTRUCTIVE TESTING WITH ULTRASONIC WAVES | RAEVIS, ROBERT R | 16d overdue |
| 18755821 | AIRCRAFT HAVING A SYSTEM FOR ATTACHING AN ELEMENT TO A FUSELAGE AND HAVING A LIGHTNING PROTECTION SCREEN | BAUER, SCOTT ALLEN | 7d |
| 18742140 | ACOUSTIC ATTENUATION PANEL COMPRISING AN INDUCTION-BASED FROST TREATMENT SYSTEM, AIR INTAKE OF AN AIRCRAFT NACELLE AND AIRCRAFT COMPRISING SUCH A PANEL | PHILLIPS, FORREST M | 22d |
| 18971796 | PROPULSION ASSEMBLY FOR AN AIRCRAFT COMPRISING A FLUID-COOLING CIRCUIT WITH QUICK-FIT NACELLE/ENGINE COUPLINGS AND AIRCRAFT PROVIDED WITH SUCH AN ASSEMBLY | KIM, SANG K | 34d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18535224 | Method And System For Assisting In The Avoidance Of An Incursion Onto A Runway By An Aircraft Taxiing On An Airfield | KAZIMI, MAHMOUD M | 20d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18769028 | SYSTEM FOR FIXING AN ELEMENT AND AIRCRAFT COMPRISING AT LEAST ONE SUCH SYSTEM | MORRIS, TAYLOR L | 92d overdue |
| 18644966 | TANK COMPRISING INNER AND OUTER ENCLOSURES AND AT LEAST ONE DUCT PASSING THROUGH SAID ENCLOSURES AND FOLLOWING A CURVED TRAJECTORY BETWEEN SAID ENCLOSURES | CASTELLANO, STEPHEN J | 70d overdue |
| 18676035 | ENHANCED INTERFACE FOR CHECKING AND NEUTRALIZING AN ELECTRICAL POWER SUPPLY LINE OF AN AIRCRAFT AND AIRCRAFT COMPRISING SUCH AN INTERFACE | MCANDREW, CHRISTOPHER P | 19d overdue |
| 18533452 | METHOD FOR ANALYZING A PART USING NON-DESTRUCTIVE TESTING WITH ULTRASONIC WAVES | RAEVIS, ROBERT R | 16d overdue |
| 18755821 | AIRCRAFT HAVING A SYSTEM FOR ATTACHING AN ELEMENT TO A FUSELAGE AND HAVING A LIGHTNING PROTECTION SCREEN | BAUER, SCOTT ALLEN | 7d |
| 18534966 | Method And System For Assisting A Pilot Of An Aircraft When The Aircraft Is Taxiing On A Traffic Lane Of An Airport | INSERRA, MADISON RENEE | 16d |
| 18535224 | Method And System For Assisting In The Avoidance Of An Incursion Onto A Runway By An Aircraft Taxiing On An Airfield | KAZIMI, MAHMOUD M | 20d |
| 18742140 | ACOUSTIC ATTENUATION PANEL COMPRISING AN INDUCTION-BASED FROST TREATMENT SYSTEM, AIR INTAKE OF AN AIRCRAFT NACELLE AND AIRCRAFT COMPRISING SUCH A PANEL | PHILLIPS, FORREST M | 22d |
| Art Unit | Apps |
|---|---|
| 3745 | 2 |
| 2855 | 2 |
| 3741 | 1 |
| 3631 | 1 |
| 2838 | 1 |
| 2837 | 1 |
| 2858 | 1 |
| 3733 | 1 |
| 3665 | 1 |
| 3662 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18971796 | PROPULSION ASSEMBLY FOR AN AIRCRAFT COMPRISING A FLUID-COOLING CIRCUIT WITH QUICK-FIT NACELLE/ENGINE COUPLINGS AND AIRCRAFT PROVIDED WITH SUCH AN ASSEMBLY | KIM, SANG K | 3745 | §102 | Non-Final OA | 34d | Pending | Dec 06, 2024 |
| 18911368 | PROPULSION ASSEMBLY INTENDED FOR AN AIRCRAFT AND HAVING A HEAT EXCHANGE SYSTEM IN THE EXHAUST NOZZLE | AMAR, MARC J | 3741 | §103 | Non-Final OA | 30d | Pending | Oct 10, 2024 |
| 18769028 | SYSTEM FOR FIXING AN ELEMENT AND AIRCRAFT COMPRISING AT LEAST ONE SUCH SYSTEM | MORRIS, TAYLOR L | 3631 | §103 | Final Rejection | 92d overdue | Pending | Jul 10, 2024 |
| 18755821 | AIRCRAFT HAVING A SYSTEM FOR ATTACHING AN ELEMENT TO A FUSELAGE AND HAVING A LIGHTNING PROTECTION SCREEN | BAUER, SCOTT ALLEN | 2838 | §103 | Non-Final OA | 7d | Pending | Jun 27, 2024 |
| 18742140 | ACOUSTIC ATTENUATION PANEL COMPRISING AN INDUCTION-BASED FROST TREATMENT SYSTEM, AIR INTAKE OF AN AIRCRAFT NACELLE AND AIRCRAFT COMPRISING SUCH A PANEL | PHILLIPS, FORREST M | 2837 | §103 | Non-Final OA | 22d | Pending | Jun 13, 2024 |
| 18676035 | ENHANCED INTERFACE FOR CHECKING AND NEUTRALIZING AN ELECTRICAL POWER SUPPLY LINE OF AN AIRCRAFT AND AIRCRAFT COMPRISING SUCH AN INTERFACE | MCANDREW, CHRISTOPHER P | 2858 | §103 | Non-Final OA | 19d overdue | Pending | May 28, 2024 |
| 18644966 | TANK COMPRISING INNER AND OUTER ENCLOSURES AND AT LEAST ONE DUCT PASSING THROUGH SAID ENCLOSURES AND FOLLOWING A CURVED TRAJECTORY BETWEEN SAID ENCLOSURES | CASTELLANO, STEPHEN J | 3733 | §103 | Final Rejection | 70d overdue | Pending | Apr 24, 2024 |
| 18535224 | Method And System For Assisting In The Avoidance Of An Incursion Onto A Runway By An Aircraft Taxiing On An Airfield | KAZIMI, MAHMOUD M | 3665 | §101 | Non-Final OA | 20d | Pending | Dec 11, 2023 |
| 18534966 | Method And System For Assisting A Pilot Of An Aircraft When The Aircraft Is Taxiing On A Traffic Lane Of An Airport | INSERRA, MADISON RENEE | 3662 | §103 | Non-Final OA | 16d | Pending | Dec 11, 2023 |
| 18533452 | METHOD FOR ANALYZING A PART USING NON-DESTRUCTIVE TESTING WITH ULTRASONIC WAVES | RAEVIS, ROBERT R | 2855 | §103 | Non-Final OA | 16d overdue | Pending | Dec 08, 2023 |
| 18376116 | Aircraft Sound Diagnostic Method and Device | GRAVES, TIMOTHY P | 2855 | §103 | Final Rejection | 20d | Pending | Oct 03, 2023 |
| 18314365 | ADDITIVE MANUFACTURING METHOD BY DEPOSITION OF MATERIAL UNDER FOCUSED ENERGY ENABLING PRODUCTION OF INTERSECTING RIBS AND RIBBED PART OBTAINED USING SAID METHOD | WIBLIN, MATTHEW | 3745 | §112 | Non-Final OA | 35d overdue | Pending | May 09, 2023 |
| 17841125 | METHOD FOR ASSISTING WITH THE POSITIONING OF A DRILL BIT FOR BORING A COMPONENT | SHOEMAKER, ERIC JAMES | 2664 | §103 | Final Rejection | 31d overdue | Pending | Jun 15, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial