Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
8 pending office actions • 3 art units • 8 examiners • 0 of 8 (0%) have an AI response strategy ready
Onx Inc. operates within the Transportation, E-Commerce & Mechanical Systems technology area and currently has 8 pending office actions. These actions are distributed among 8 distinct examiners, meaning every pending matter is being handled by a different individual. This high degree of examiner diversity suggests a broad range of patentable subject matter and requires managing multiple distinct prosecution styles simultaneously.
Despite the high number of examiners, the portfolio is concentrated within 3 distinct art units. This concentration suggests that while many examiners are involved, the technical focus of the applications is relatively narrow, falling into just a few specific categories within the transportation and e-commerce sectors. This allows for some level of strategic consistency across the different applications.
The busiest examiner, KENNY, DANIEL J, is responsible for 1 pending office action. Because the busiest examiner only manages a single pending action, the workload is perfectly distributed across the examiner pool. No single examiner has a disproportionate impact on the portfolio, which may reduce the risk associated with any individual examiner's specific tendencies.
Based on the USPTO statutory response window for each pending office action. 3 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 3 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (12%) |
| §102 only | 1 (12%) |
| §112 only | 1 (12%) |
| Multi-statute (no §101) | 5 (62%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KENNY, DANIEL J | 1 | 61.8% | +21.9% |
| LAZO, THOMAS E | 1 | 86.8% | +8.9% |
| GREEN, ANTHONY J | 1 | 85.0% | +13.5% |
| WOODWARD, ANA LUCRECIA | 1 | 73.4% | +16.4% |
| WALRAED-SULLIVAN, KYLE | 1 | 73.3% | +30.4% |
| FERENCE, JAMES M | 1 | 71.2% | +17.2% |
| KWIECINSKI, RYAN D | 1 | 68.2% | +19.7% |
| KONERU, SUJAY | 1 | 58.2% | +37.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18663012 | METHOD AND ARRANGEMENT FOR COUPLING VERTICAL PRECAST STRUCTURES | WALRAED-SULLIVAN, KYLE | 79d overdue |
| 18658620 | METHOD AND ARRANGEMENT FOR FORMING PRECAST CONCRETE PANELS | FERENCE, JAMES M | 45d overdue |
| 18771015 | A PRECAST STRUCTURE HANDLING SYSTEM | LAZO, THOMAS E | — |
| 18674567 | GROUT COMPOSITION FOR USE IN CONSTRUCTION AND METHODS OF PREPARING THE SAME | GREEN, ANTHONY J | — |
| 18674502 | TOP-COAT MATERIAL COMPOSITION FOR USE IN CONSTRUCTION | WOODWARD, ANA LUCRECIA | — |
| 18205231 | METHOD AND SYSTEM FOR DESIGNING AND CONSTRUCTING NET-ZERO ENERGY BUILDINGS | KONERU, SUJAY | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18663012 | METHOD AND ARRANGEMENT FOR COUPLING VERTICAL PRECAST STRUCTURES | WALRAED-SULLIVAN, KYLE | 79d overdue |
| 18648348 | METHOD AND ARRANGEMENT FOR COUPLING HORIZONTAL VERTICAL PRECAST STRUCTURES | KWIECINSKI, RYAN D | 72d overdue |
| 18658620 | METHOD AND ARRANGEMENT FOR FORMING PRECAST CONCRETE PANELS | FERENCE, JAMES M | 45d overdue |
| 18921324 | METHOD AND ARRANGEMENT FOR LEVELING OF PREFABRICATED WALL PANELS | KENNY, DANIEL J | — |
| 18674567 | GROUT COMPOSITION FOR USE IN CONSTRUCTION AND METHODS OF PREPARING THE SAME | GREEN, ANTHONY J | — |
| 18674502 | TOP-COAT MATERIAL COMPOSITION FOR USE IN CONSTRUCTION | WOODWARD, ANA LUCRECIA | — |
| 18205231 | METHOD AND SYSTEM FOR DESIGNING AND CONSTRUCTING NET-ZERO ENERGY BUILDINGS | KONERU, SUJAY | — |
| Art Unit | Apps |
|---|---|
| 3635 | 3 |
| 3633 | 1 |
| 3745 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18921324 | METHOD AND ARRANGEMENT FOR LEVELING OF PREFABRICATED WALL PANELS | KENNY, DANIEL J | 3633 | §112 | Non-Final OA | — | Pending | Oct 21, 2024 |
| 18771015 | A PRECAST STRUCTURE HANDLING SYSTEM | LAZO, THOMAS E | 3745 | §102§103 | Non-Final OA | — | Pending | Jul 12, 2024 |
| 18674567 | GROUT COMPOSITION FOR USE IN CONSTRUCTION AND METHODS OF PREPARING THE SAME | GREEN, ANTHONY J | — | §102§103§112 | Non-Final OA | — | Pending | May 24, 2024 |
| 18674502 | TOP-COAT MATERIAL COMPOSITION FOR USE IN CONSTRUCTION | WOODWARD, ANA LUCRECIA | — | §102§112 | Non-Final OA | — | Pending | May 24, 2024 |
| 18663012 | METHOD AND ARRANGEMENT FOR COUPLING VERTICAL PRECAST STRUCTURES | WALRAED-SULLIVAN, KYLE | 3635 | §103§112 | Final Rejection | 79d overdue | Pending | May 13, 2024 |
| 18658620 | METHOD AND ARRANGEMENT FOR FORMING PRECAST CONCRETE PANELS | FERENCE, JAMES M | 3635 | §103§112 | Final Rejection | 45d overdue | Pending | May 08, 2024 |
| 18648348 | METHOD AND ARRANGEMENT FOR COUPLING HORIZONTAL VERTICAL PRECAST STRUCTURES | KWIECINSKI, RYAN D | 3635 | §102 | Final Rejection | 72d overdue | Pending | Apr 27, 2024 |
| 18205231 | METHOD AND SYSTEM FOR DESIGNING AND CONSTRUCTING NET-ZERO ENERGY BUILDINGS | KONERU, SUJAY | — | §101 | Non-Final OA | — | Pending | Jun 02, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial