Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
37 pending office actions • 25 art units • 35 examiners • 0 of 37 (0%) have an AI response strategy ready • 140 patents granted in the last 365 days
Raytheon Technologies Corporation has 39 pending office actions in Medical Devices & Mechanical Engineering. The matters span 37 distinct examiners and 25 distinct art units, indicating a broad prosecution network with substantial examiner and art-unit dispersion.
MEILLER, SEAN V is the busiest examiner, with 2 pending office actions. The profile supports centralized tracking for the overall portfolio, combined with response strategies tailored to the many individual examination assignments.
Based on the USPTO statutory response window for each pending office action. 13 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 13 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (5%) |
| §103 only | 16 (43%) |
| Double-patenting only | 1 (3%) |
| Double-patenting + other | 1 (3%) |
| Multi-statute (no §101) | 17 (46%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MEILLER, SEAN V | 2 | 74.1% | +38.3% |
| HOPPE, EMMA RUTH | 2 | 40.0% | +58.3% |
| SCHLEIS, DANIEL J | 1 | 71.9% | +5.3% |
| ADJAGBE, MAXIME M | 1 | 84.1% | +9.7% |
| DUONG, THO V | 1 | 67.0% | +17.6% |
| TRAN, SCOTT THANH BINH | 1 | 100.0% | +0.0% |
| NGUYEN, HUY TRAM | 1 | 79.3% | +6.6% |
| YANG, ZHEREN J | 1 | 57.3% | +52.8% |
| BORISSOV, IGOR N | 1 | 28.5% | +41.7% |
| DION, MARCEL T | 1 | 40.7% | +36.8% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | MEILLER, SEAN V | 32d overdue |
| 18121424 | COUPLING OPTICAL FIBERS AND FLUID PASSAGES | HAYES, MARY A | 19d overdue |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | LIU, CHRIS Q | 1d overdue |
| 17985020 | Photonic Ising Compute Engine with An Optical Phased Array | DASGUPTA, SHOURJO | 13d |
| 18137871 | MAGNETIC-FOIL BEARING WITH ROTATING STRUCTURE HEALTH MONITORING | HTAY, AYE SU MON | 29d |
| 18345835 | RESILIENT BUILD PLATES FOR POWDER BED FUSION - LASER ADDITIVE MANUFACTURING | SCHLEIS, DANIEL J | 53d |
| 18209260 | THIN FILM TEMPERATURE SENSOR AND METHOD | ADJAGBE, MAXIME M | 57d |
| 18207527 | COMPOSITE HEAT EXCHANGE APPARATUS FOR A TURBINE ENGINE | DUONG, THO V | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | MEILLER, SEAN V | 32d overdue |
| 18207527 | COMPOSITE HEAT EXCHANGE APPARATUS FOR A TURBINE ENGINE | DUONG, THO V | — |
| 18202640 | PREFORM TAPERED HOLE PRESS FOR IMPROVED CVI-CMC MICROSTRUCTURE | YANG, ZHEREN J | — |
| 18202407 | SCOOP ASSEMBLY FOR ROTATIONAL EQUIPMENT | MEILLER, SEAN V | — |
| 18201786 | PREDICTIVE MODEL FOR MULTI-LASER POWDER BED FUSION ADDITIVE MANUFACTURING | BORISSOV, IGOR N | — |
| 18143150 | MACHINE CONTROL FOR GRINDING MACHINE | DION, MARCEL T | — |
| 17576975 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ON A SOLID-PHASE MEDIUM | HOPPE, EMMA RUTH | — |
| 17576973 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ON A SOLID-PHASE MEDIUM | HOPPE, EMMA RUTH | — |
| Art Unit | Apps |
|---|---|
| 3761 | 4 |
| 3745 | 3 |
| 3741 | 3 |
| 3763 | 3 |
| 3723 | 2 |
| 1735 | 2 |
| 1683 | 2 |
| 1784 | 1 |
| 3700 | 1 |
| 2186 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18345835 | RESILIENT BUILD PLATES FOR POWDER BED FUSION - LASER ADDITIVE MANUFACTURING | SCHLEIS, DANIEL J | 1784 | §102§103 | Final Rejection | 53d | Pending | Jun 30, 2023 |
| 18209260 | THIN FILM TEMPERATURE SENSOR AND METHOD | ADJAGBE, MAXIME M | 3745 | §102§103 | Non-Final OA | 57d | Pending | Jun 13, 2023 |
| 18207527 | COMPOSITE HEAT EXCHANGE APPARATUS FOR A TURBINE ENGINE | DUONG, THO V | 3700 | §102§103§112 | Non-Final OA | — | Pending | Jun 08, 2023 |
| 18206882 | METHOD AND SYSTEM FOR OPTIMIZING THE ASSEMBLY OF ROTATING HARDWARE IN GAS TURBINE ENGINES USING ARTIFICIAL NEURAL NETWORKS | TRAN, SCOTT THANH BINH | 2186 | §101§103§112 | Non-Final OA | — | Pending | Jun 07, 2023 |
| 18331127 | APPARATUS AND METHOD FOR ISOLATING HYDROGEN FROM WATER | NGUYEN, HUY TRAM | 1774 | DP | Final Rejection | — | Pending | Jun 07, 2023 |
| 18202640 | PREFORM TAPERED HOLE PRESS FOR IMPROVED CVI-CMC MICROSTRUCTURE | YANG, ZHEREN J | 1781 | §103§112 | Final Rejection | — | Pending | May 26, 2023 |
| 18202407 | SCOOP ASSEMBLY FOR ROTATIONAL EQUIPMENT | MEILLER, SEAN V | 3741 | §103§112 | Non-Final OA | — | Pending | May 26, 2023 |
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | MEILLER, SEAN V | 3741 | §103§112 | Final Rejection | 32d overdue | Pending | May 26, 2023 |
| 18201786 | PREDICTIVE MODEL FOR MULTI-LASER POWDER BED FUSION ADDITIVE MANUFACTURING | BORISSOV, IGOR N | 3685 | §101§102§103 | Non-Final OA | — | Pending | May 25, 2023 |
| 18143150 | MACHINE CONTROL FOR GRINDING MACHINE | DION, MARCEL T | 3723 | §103§112 | Non-Final OA | — | Pending | May 04, 2023 |
| 18143143 | MACHINE CONTROL FOR DYNABRAID MACHINE | MARKMAN, MAKENA | 3723 | §103 | Non-Final OA | 44d overdue | Pending | May 04, 2023 |
| 18137871 | MAGNETIC-FOIL BEARING WITH ROTATING STRUCTURE HEALTH MONITORING | HTAY, AYE SU MON | 3745 | §102§103 | Final Rejection | 29d | Pending | Apr 21, 2023 |
| 18304771 | HEAT EXCHANGER SYSTEMS AND DEVICES FOR INCREASED DURABILITY | HEINLE, COURTNEY D | 3762 | §103§112 | Non-Final OA | — | Pending | Apr 21, 2023 |
| 18300594 | COOLING OF AIRCRAFT CRYOGENIC FUEL TANK ASSEMBLY | BANKS, KEONA LAUREN | 3763 | §102§103§112 | Non-Final OA | — | Pending | Apr 14, 2023 |
| 18121781 | MITIGATING DOWN SKIN EFFECTS IN ADDITIVE MANUFACTURING | HEVEY, JOHN A | 1735 | §103 | Non-Final OA | — | Pending | Mar 15, 2023 |
| 18121424 | COUPLING OPTICAL FIBERS AND FLUID PASSAGES | HAYES, MARY A | 2874 | §102§103§112 | Non-Final OA | 19d overdue | Pending | Mar 14, 2023 |
| 18119130 | HEAT EXCHANGER WITH CROSSING HEAT EXCHANGE TUBES | RUPPERT, ERIC S | 3763 | §103 | Final Rejection | 22d | Pending | Mar 08, 2023 |
| 18117450 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | OLIVA, STEPHANIE RENEE | 3761 | §103 | Final Rejection | — | Pending | Mar 05, 2023 |
| 18106064 | CONFORMAL HEAT EXCHANGER WITH TRIANGULAR OFFSET STRIP FINS | ALVARE, PAUL | 3763 | §103 | Non-Final OA | 46d overdue | Pending | Feb 06, 2023 |
| 18101149 | TWO PIECE HOLLOW-VANE ASSEMBLY JOINED VIA BRAZING | SAAD, ERIN BARRY | 1735 | §103 | Final Rejection | — | Pending | Jan 25, 2023 |
| 18152482 | EDM ELECTRODE WITH ENRICHED SURFACE REGION | TRAN, THIEN S | 3761 | §103 | Non-Final OA | — | Pending | Jan 10, 2023 |
| 18151709 | COATING FABRICATION METHOD FOR PRODUCING ENGINEERED MICROSTRUCTURE OF SILICATE-RESISTANT BARRIER COATING | UTT, ETHAN A | 1783 | §102§103 | Non-Final OA | — | Pending | Jan 09, 2023 |
| 18088162 | ENVIRONMENTAL BARRIER COATING | BRAUCH, CHARLES JOSEPH | 3747 | §103 | Final Rejection | — | Pending | Dec 23, 2022 |
| 18086755 | ELECTRICALLY BOOSTED TURBINE COOLING AIR | NG, HENRY | 3741 | §103 | Non-Final OA | 17d overdue | Pending | Dec 22, 2022 |
| 17957558 | SPIKED PREFORM TOOLING FOR IMPROVED CHEMICAL VAPOR INFILTRATION IN CERAMIC MATRIX COMPOSITES | NGUYEN, PHONG H | 3724 | §103 | Non-Final OA | — | Pending | Sep 30, 2022 |
| 17843128 | CONTINUOUS ATMOSPHERIC PRESSURE CVD TOW COATER PROCESS WITH IN-SITU AIR LEAK MONITORING | MOORE, KARLA A | 1716 | §103 | Final Rejection | 28d | Pending | Jun 17, 2022 |
| 17702553 | DUAL SCANNER INSPECTION SYSTEMS AND METHODS | BUI, ANDREW THANH | 3745 | §103 | Non-Final OA | 9d overdue | Pending | Mar 23, 2022 |
| 17570484 | WATERJET-GUIDED LASER MACHINE WITH INLINE OPTICAL FEEDBACK CONTROL | AMIN, HAMZEH HICHAM | 3761 | §103 | Non-Final OA | — | Pending | Jan 07, 2022 |
| 17554657 | INTRODUCTION OF METALLIC PARTICLES TO ENABLE FORMATION OF METALLIC CARBIDES IN A MATRIX | EMPIE, NATHAN H | 1712 | §103 | Non-Final OA | — | Pending | Dec 17, 2021 |
| 17402844 | IN-SITU DESIZING FOR LIQUID INFUSION PROCESSES | KRASNOW, NICHOLAS R | 1744 | §103§112 | Non-Final OA | — | Pending | Aug 16, 2021 |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | LIU, CHRIS Q | 3761 | §103§112 | Non-Final OA | 1d overdue | Pending | Aug 13, 2021 |
| 17240347 | NANOFIBER INTERLAMINAR LAYER FOR CERAMIC MATRIX COMPOSITES | PIZIALI, ANDREW T | 1789 | §103 | Non-Final OA | — | Pending | Apr 26, 2021 |
| 17985020 | Photonic Ising Compute Engine with An Optical Phased Array | DASGUPTA, SHOURJO | 2144 | §103§112 | Non-Final OA | 13d | Pending | Nov 10, 2022 |
| 17576975 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ON A SOLID-PHASE MEDIUM | HOPPE, EMMA RUTH | 1683 | §103§112 | Final Rejection | — | Pending | Jan 16, 2022 |
| 17576972 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ANALYSIS FOR PATHOGENIC TARGETS | JONES, CHRISTINE MICHELLE | 1682 | §103§112DP | Non-Final OA | — | Pending | Jan 16, 2022 |
| 17576973 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ON A SOLID-PHASE MEDIUM | HOPPE, EMMA RUTH | 1683 | §103§112Other | Final Rejection | — | Pending | Jan 16, 2022 |
| 16723360 | REINFORCED CERAMIC MATRIX COMPOSITE AND METHOD OF MANUFACTURE | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Dec 20, 2019 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialRaytheon Technologies Corporation has 37 pending office actions as of October 2026, spread across 25 art units and 35 examiners.
Sean V Meiller has the most, with 2 of Raytheon Technologies Corporation's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.