Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
86 pending office actions • 42 art units • 72 examiners • 0 of 86 (0%) have an AI response strategy ready • 220 patents granted in the last 365 days
Rolls-Royce plc has 86 pending office actions in Medical Devices & Mechanical Engineering. The matters involve 72 examiners across 42 art units, creating a broad and technically varied examination landscape. Portfolio management should emphasize accurate matter ownership, coordinated engineering support, and systematic tracking of examiner-specific issues.
KIM, TAE JUN is the busiest examiner, with 4 pending matters. This is a meaningful concentration within the listed examiner activity, but most matters remain distributed across other examiners. Counsel can examine that examiner relationship for recurring issues while maintaining separate strategies for the broader portfolio.
Based on the USPTO statutory response window for each pending office action. 17 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 17 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (1%) |
| §101 + other | 5 (6%) |
| §103 only | 26 (30%) |
| §102 only | 1 (1%) |
| §112 only | 3 (3%) |
| Double-patenting only | 1 (1%) |
| Double-patenting + other | 2 (2%) |
| Multi-statute (no §101) | 47 (55%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KIM, TAE JUN | 4 | 63.9% | +26.0% |
| BURKE, THOMAS P | 3 | 44.0% | +21.1% |
| THOMAS, KYLE ROBERT | 2 | 72.4% | +28.6% |
| RIBADENEYRA, THEODORE C | 2 | 89.2% | +9.1% |
| WALTHOUR, SCOTT J | 2 | 78.7% | +70.0% |
| SEBASCO CHENG, STEPHANIE | 2 | 58.7% | +70.1% |
| IGUE, ROBERTO TOSHIHARU | 2 | 57.7% | +20.8% |
| HARRINGTON, ALYSON JOAN | 2 | 74.7% | +61.0% |
| KIM, SANG K | 2 | 81.5% | +10.3% |
| DUNN, DARRIN D | 2 | 75.5% | +24.1% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17556211 | HYDROGEN STORAGE TANK WITH LEAK MANAGEMENT FUNCTIONALITY | PATEL, SUHANI JITENDRA | 140d overdue |
| 18771137 | METHOD OF MANUFACTURING A COMPONENT OF A GAS TURBINE ENGINE | PENNY, TABATHA L | 128d overdue |
| 18467387 | AEROFOIL FOR A GAS TURBINE ENGINE | PRUITT, JUSTIN A | 46d overdue |
| 18732814 | HEAT EXCHANGER | JONES, GORDON A | 44d overdue |
| 18588431 | PODDED ENGINE ADAPTOR | MICHENER, JOSHUA J | 16d |
| 18781563 | GEARED GAS TURBINE ENGINE | SEBASCO CHENG, STEPHANIE | 29d |
| 18144425 | AIRCRAFT DC POWER BUS REGULATION AND WING DE-ICER | TRAN, THIEN S | 29d |
| 18340980 | APPARATUS AND METHOD | GROUX, JENNIFER LILA | 34d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19023732 | HEAT EXCHANGER | SEBASCO CHENG, STEPHANIE | 6d |
| 18781563 | GEARED GAS TURBINE ENGINE | SEBASCO CHENG, STEPHANIE | 29d |
| 18741985 | GAS TURBINE ENGINE FUEL SYSTEM | KIM, TAE JUN | 36d |
| 19440191 | GAS TURBINE ENGINE FUEL SYSTEM | THOMAS, KYLE ROBERT | — |
| 19395519 | FLAMEHOLDER FOR A REHEAT ASSEMBLY OF A GAS TURBINE ENGINE | KIM, TAE JUN | — |
| 19364678 | GAS TURBINE PERFORMANCE | WALTHOUR, SCOTT J | — |
| 19323341 | GAS TURBINE ENGINE | THOMAS, KYLE ROBERT | — |
| 19228822 | FUEL SPRAY NOZZLES | KIM, TAE JUN | — |
| Art Unit | Apps |
|---|---|
| 3741 | 21 |
| 3745 | 5 |
| 2838 | 5 |
| 1788 | 3 |
| 3761 | 3 |
| 3747 | 2 |
| 3763 | 2 |
| 3762 | 2 |
| 2834 | 2 |
| 1784 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19575281 | FUELDRAULIC HEAT MANAGEMENT SYSTEM | CHAU, ALAIN | 3741 | §103Other | Non-Final OA | — | Pending | Mar 23, 2026 |
| 19440191 | GAS TURBINE ENGINE FUEL SYSTEM | THOMAS, KYLE ROBERT | 3741 | §102§103§112 | Non-Final OA | — | Pending | Jan 05, 2026 |
| 19398452 | AIRCRAFT EMISSIONS | SUTHERLAND, STEVEN M | 3741 | §103§112 | Non-Final OA | — | Pending | Nov 24, 2025 |
| 19395519 | FLAMEHOLDER FOR A REHEAT ASSEMBLY OF A GAS TURBINE ENGINE | KIM, TAE JUN | 3741 | §102§103 | Non-Final OA | — | Pending | Nov 20, 2025 |
| 19387739 | FLUID FLOW MACHINE COMPRISING A CASING STRUCTURE | RIBADENEYRA, THEODORE C | 3745 | §102§103 | Non-Final OA | — | Pending | Nov 13, 2025 |
| 19387731 | FLUID FLOW MACHINE COMPRISING A SEALING ARRANGEMENT | RIBADENEYRA, THEODORE C | 3745 | §102§103§112 | Non-Final OA | — | Pending | Nov 13, 2025 |
| 19364678 | GAS TURBINE PERFORMANCE | WALTHOUR, SCOTT J | 3741 | §103Other | Final Rejection | — | Pending | Oct 21, 2025 |
| 19349218 | DATA RECORDERS | HOLMAN, JOHN D | 3667 | §102§103Other | Non-Final OA | — | Pending | Oct 03, 2025 |
| 19347323 | GAS TURBINE ENGINE | FLORES, JUAN G | 3745 | §112 | Final Rejection | — | Pending | Oct 01, 2025 |
| 19323341 | GAS TURBINE ENGINE | THOMAS, KYLE ROBERT | 3741 | §103 | Final Rejection | — | Pending | Sep 09, 2025 |
| 19268478 | ROBOTIC SHAPE FORMING | DANG, TRANG THANH | 3656 | §103§112 | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19228822 | FUEL SPRAY NOZZLES | KIM, TAE JUN | 3741 | §102§103§112 | Final Rejection | — | Pending | Jun 05, 2025 |
| 19200887 | INSPECTION SYSTEM AND METHOD FOR INSPECTING A SURFACE | MAHONEY, CHRISTOPHER E | 2858 | §103 | Non-Final OA | — | Pending | May 07, 2025 |
| 19180577 | A SEAL, A SEAL ASSEMBLY AND A METHOD | PATEL, VISHAL A | 3675 | §102§103 | Non-Final OA | — | Pending | Apr 16, 2025 |
| 19084508 | ELECTRICAL POWER SYSTEM | THOMAS, LUCY M | 2838 | §102§103 | Non-Final OA | — | Pending | Mar 19, 2025 |
| 19077144 | POWER ELECTRONICS CONVERTER | INGE, JOSEPH N | 2836 | §103 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19077702 | ELECTRICAL POWER SYSTEM | LAXTON, GARY L | 2838 | §102§103 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19072091 | FIBRE PLACEMENT HEAD | WOLLSCHLAGER, JEFFREY MICHAEL | 1742 | §103 | Non-Final OA | — | Pending | Mar 06, 2025 |
| 19057762 | POWER ELECTRONICS CONVERTER | CHOI, SEUNG HO | 2838 | §103 | Non-Final OA | — | Pending | Feb 19, 2025 |
| 19049772 | THERMAL BARRIER STRUCTURE AND COATING | VO, HAI | 1788 | §102§103 | Final Rejection | — | Pending | Feb 10, 2025 |
| 19033667 | SYSTEM AND METHOD FOR ASSEMBLING A FAN CASE OF A GAS TURBINE ENGINE | RIVERA, JOSHEL | 1746 | §102 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 19023732 | HEAT EXCHANGER | SEBASCO CHENG, STEPHANIE | 3741 | §103 | Final Rejection | 6d | Pending | Jan 16, 2025 |
| 19014752 | ELECTRICAL MACHINE MONITORING | LAGUARDA, GONZALO | 3747 | §101DP | Non-Final OA | — | Pending | Jan 09, 2025 |
| 18992237 | HYDROGEN FUEL DELIVERY SYSTEM | KING, BRIAN M | 3763 | §103§112Other | Non-Final OA | — | Pending | Jan 08, 2025 |
| 19003432 | HIGH POWER EPICYCLIC GEARBOX AND OPERATION THEREOF | WALTHOUR, SCOTT J | 3741 | DP | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18966953 | INSPECTION SYSTEM | ZHAO, CHRISTINE NMN | 2677 | §101§103 | Non-Final OA | — | Pending | Dec 03, 2024 |
| 18952302 | FUEL SPRAY NOZZLE FOR A GAS TURBINE ENGINE | KIM, CRAIG SANG | 3741 | §103 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18948702 | GAS TURBINE ENGINE COMPONENT PARTICULATE SAMPLING APPARATUS, SYSTEM AND METHOD | ROYSTON, JOHN M | 2855 | §102§103 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18944524 | ANALYSING IMAGES OF COMPONENTS | TRAN, PHUOC | 2668 | §101§102 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18916958 | PROPULSION SYSTEM COMPRISING A HYDROGEN-BURNING GAS TURBINE ENGINE | IGUE, ROBERTO TOSHIHARU | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 16, 2024 |
| 18917042 | GAS TURBINE ENGINE | WEINERT, WILLIAM C | 3762 | §102§103 | Non-Final OA | — | Pending | Oct 16, 2024 |
| 18907918 | AN IMPROVED GAS TURBINE ENGINE | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18907952 | AN IMPROVED GAS TURBINE ENGINE | BURKE, THOMAS P | 3741 | §103§112 | Final Rejection | — | Pending | Oct 07, 2024 |
| 18906737 | ELECTRICAL MACHINE CONDITION MONITORING | GONZALEZ QUINONES, JOSE A | 2834 | §102§103 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18895786 | DC:DC CONVERTER CONTROL | GBLENDE, JEFFREY A | 2838 | §103§112 | Final Rejection | — | Pending | Sep 25, 2024 |
| 18825101 | METHOD FOR ENGINE CONTROL AND MONITORING SYSTEM | KIM, JAMES JAY | 3747 | §102§103 | Final Rejection | — | Pending | Sep 05, 2024 |
| 18819288 | RECESSION RESISTANT INTERMEDIATE LAYER FOR CMC VANE | OMORI, MARY I | 1784 | §103 | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18782306 | STAGED COMBUSTOR | HARRINGTON, ALYSON JOAN | 3741 | §103§112 | Final Rejection | — | Pending | Jul 24, 2024 |
| 18781563 | GEARED GAS TURBINE ENGINE | SEBASCO CHENG, STEPHANIE | 3741 | §102§103§112 | Final Rejection | 29d | Pending | Jul 23, 2024 |
| 18771137 | METHOD OF MANUFACTURING A COMPONENT OF A GAS TURBINE ENGINE | PENNY, TABATHA L | 1712 | §102§103§112 | Non-Final OA | 128d overdue | Pending | Jul 12, 2024 |
| 18764516 | GAS TURBINE ENGINE STARTING METHOD | KIM, TAE JUN | 3799 | §103 | Non-Final OA | — | Pending | Jul 05, 2024 |
| 18753161 | GAS TURBINE HEAT EXCHANGER | HARRINGTON, ALYSON JOAN | 3741 | §112 | Final Rejection | — | Pending | Jun 25, 2024 |
| 18752042 | INSERTION TOOL | KIM, SANG K | 3654 | §102§103§112 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18747619 | PROBE AND METHOD FOR NON-DESTRUCTIVE TESTING OF A COMPONENT | BUTLER, KEVIN C | 2852 | §102§103 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18741985 | GAS TURBINE ENGINE FUEL SYSTEM | KIM, TAE JUN | 3799 | §103§112 | Non-Final OA | 36d | Pending | Jun 13, 2024 |
| 18737303 | MODULAR MECHANICAL TEST APPARATUS FOR CMC COMPONENT | VILLALUNA, ERIKA J | 2852 | §102§103 | Non-Final OA | — | Pending | Jun 07, 2024 |
| 18736038 | PHENOLIC TRIAZINE SILICON POLYMER RESIN BLENDS | SLOAN, LILY KAYOKO | 1762 | §103 | Non-Final OA | — | Pending | Jun 06, 2024 |
| 18732814 | HEAT EXCHANGER | JONES, GORDON A | 3763 | §102§103 | Non-Final OA | 44d overdue | Pending | Jun 04, 2024 |
| 18677149 | CONVERTER FAULT PROTECTION | RIVERA-PEREZ, CARLOS O | 2838 | §103 | Non-Final OA | 8d | Pending | May 29, 2024 |
| 18672407 | ELECTRICAL SYSTEM | TORRES RUIZ, JOHALI ALEJANDRA | 2859 | §102§103§112Other | Non-Final OA | — | Pending | May 23, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialRolls-Royce plc has 86 pending office actions as of November 2026, spread across 42 art units and 72 examiners.
Tae Jun Kim has the most, with 4 of Rolls-Royce plc's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.