Technology area: Medical Devices & Mechanical Engineering
30 pending office actions • 13 art units • 23 examiners • 0 of 30 (0%) have an AI response strategy ready • 61 patents granted in the last 365 days
Vestas Wind Systems A/S has 34 pending office actions in Medical Devices & Mechanical Engineering. The matters span 26 distinct examiners and 16 distinct art units, showing broad examiner coverage across a smaller set of examination groups.
GOLIK, ARTHUR PAUL is the busiest identified examiner, with 5 pending matters. This examiner provides a practical focal point for review, but the broader distribution requires portfolio-level coordination. Counsel may organize recurring claim and technical issues by art unit while adapting prosecution arguments to the separate examiner assignments.
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (3%) |
| §101 + other | 3 (10%) |
| §103 only | 6 (20%) |
| §102 only | 1 (3%) |
| §112 only | 1 (3%) |
| Multi-statute (no §101) | 18 (60%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| GOLIK, ARTHUR PAUL | 4 | 70.2% | +45.5% |
| DAVIS, JASON GREGORY | 2 | 74.2% | +18.2% |
| DELRUE, BRIAN CHRISTOPHER | 2 | 84.3% | +21.8% |
| REITZ, MICHAEL K. | 2 | 69.1% | +5.1% |
| KENNY, DANIEL J | 2 | 61.8% | +21.6% |
| HAGHIGHIAN, BEHNOUSH | 1 | 78.8% | +12.7% |
| SEABE, JUSTIN D | 1 | 71.4% | +24.3% |
| FISHER, WESLEY LE | 1 | 82.4% | +14.1% |
| NGUYEN, THUKHANH T | 1 | 74.7% | +10.7% |
| GUGGER, SEAN A | 1 | 64.9% | +23.2% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18875579 | A WIND TURBINE WITH BLADE CONNECTING TENSION MEMBERS | GOLIK, ARTHUR PAUL | 8d overdue |
| 18879679 | WIND TURBINE WAKE LOSS CONTROL USING DETECTED DOWNSTREAM WAKE LOSS AS A FUNCTION OF WIND DIRECTION | GOLIK, ARTHUR PAUL | 22d |
| 18881968 | DAMPING ARRANGEMENT FOR A WIND TURBINE | REITZ, MICHAEL K. | 70d |
| 19486417 | A WIND TURBINE BLADE | HAGHIGHIAN, BEHNOUSH | — |
| 19479685 | VERIFYING WIND TURBINE PERFORMANCE | SEABE, JUSTIN D | — |
| 19475234 | LIGHTNING STRIKE PROTECTION SYSTEM | FISHER, WESLEY LE | — |
| 19165280 | A PITCH CONTROLLED WIND TURBINE | DAVIS, JASON GREGORY | — |
| 19150066 | A METHOD FOR MANUFACTURING A COMPOSITE STRUCTURE USING RECYCLED FIBRE MATS | NGUYEN, THUKHANH T | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18875579 | A WIND TURBINE WITH BLADE CONNECTING TENSION MEMBERS | GOLIK, ARTHUR PAUL | 8d overdue |
| 18879679 | WIND TURBINE WAKE LOSS CONTROL USING DETECTED DOWNSTREAM WAKE LOSS AS A FUNCTION OF WIND DIRECTION | GOLIK, ARTHUR PAUL | 22d |
| 18557544 | CONTROL SCHEME FOR CLUSTER OF WIND TURBINES | DAVIS, JASON GREGORY | 23d |
| 19486417 | A WIND TURBINE BLADE | HAGHIGHIAN, BEHNOUSH | — |
| 19479685 | VERIFYING WIND TURBINE PERFORMANCE | SEABE, JUSTIN D | — |
| 19475234 | LIGHTNING STRIKE PROTECTION SYSTEM | FISHER, WESLEY LE | — |
| 19165280 | A PITCH CONTROLLED WIND TURBINE | DAVIS, JASON GREGORY | — |
| 19150066 | A METHOD FOR MANUFACTURING A COMPOSITE STRUCTURE USING RECYCLED FIBRE MATS | NGUYEN, THUKHANH T | — |
| Art Unit | Apps |
|---|---|
| 3745 | 15 |
| 3726 | 2 |
| 3633 | 2 |
| 1743 | 1 |
| 2834 | 1 |
| 1742 | 1 |
| 2493 | 1 |
| 3664 | 1 |
| 2494 | 1 |
| 2116 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19486417 | A WIND TURBINE BLADE | HAGHIGHIAN, BEHNOUSH | 3745 | §103§112 | Non-Final OA | — | Pending | Nov 21, 2025 |
| 19479685 | VERIFYING WIND TURBINE PERFORMANCE | SEABE, JUSTIN D | 3745 | §102§103 | Non-Final OA | — | Pending | Oct 28, 2025 |
| 19475234 | LIGHTNING STRIKE PROTECTION SYSTEM | FISHER, WESLEY LE | 3745 | §103§112 | Non-Final OA | — | Pending | Oct 14, 2025 |
| 19165280 | A PITCH CONTROLLED WIND TURBINE | DAVIS, JASON GREGORY | 3745 | §102§103 | Non-Final OA | — | Pending | Sep 15, 2025 |
| 19150066 | A METHOD FOR MANUFACTURING A COMPOSITE STRUCTURE USING RECYCLED FIBRE MATS | NGUYEN, THUKHANH T | 1743 | §102§103 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19268663 | METHOD FOR PLANNING REPOWERING OF A WIND ENERGY PLANT | GUGGER, SEAN A | 2834 | §103 | Final Rejection | — | Pending | Jul 14, 2025 |
| 19119239 | METHOD OF MAKING A RECONFIGURABLE WIND TURBINE BLADE MOULD | SCHIFFMAN, BENJAMIN A | 1742 | §103§112 | Non-Final OA | — | Pending | Apr 08, 2025 |
| 19118805 | METHOD FOR HANDLING A WIND TURBINE BLADE USING A CRANE SYSTEM | HOLLY, LEE A | 3726 | §103§112 | Non-Final OA | — | Pending | Apr 07, 2025 |
| 19116747 | IMPROVEMENTS RELATING TO WIND TURBINE BLADE ANTI-ICING SYSTEMS | DELRUE, BRIAN CHRISTOPHER | 3745 | §102§103 | Non-Final OA | — | Pending | Mar 28, 2025 |
| 19102465 | PRE-BENT WIND TURBINE BLADE WITH MULTIPLE INFLECTION POINTS AND METHOD OF MAKING SAME | MARIEN, ANDREW JAMES | 3745 | §102§103§112 | Non-Final OA | — | Pending | Feb 10, 2025 |
| 18997361 | Improvements Relating to Modular Wind Turbine Blades | WILENSKY, MOSHE K | 3726 | §103 | Non-Final OA | — | Pending | Jan 21, 2025 |
| 18881968 | DAMPING ARRANGEMENT FOR A WIND TURBINE | REITZ, MICHAEL K. | 3745 | §102§103§112 | Final Rejection | 70d | Pending | Jan 07, 2025 |
| 18879679 | WIND TURBINE WAKE LOSS CONTROL USING DETECTED DOWNSTREAM WAKE LOSS AS A FUNCTION OF WIND DIRECTION | GOLIK, ARTHUR PAUL | 3745 | §102§103 | Non-Final OA | 22d | Pending | Dec 27, 2024 |
| 18878780 | METHOD FOR CONTROLLING PULSE WITH MODULATION INVERTERS | DE LEON DOMENECH, RAFAEL O | — | §101§102 | Non-Final OA | — | Pending | Dec 24, 2024 |
| 18877612 | A RADIATOR MODULE FOR A CONDITIONING SYSTEM OF A WIND TURBINE | DELRUE, BRIAN CHRISTOPHER | 3745 | §102§103§112 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18875579 | A WIND TURBINE WITH BLADE CONNECTING TENSION MEMBERS | GOLIK, ARTHUR PAUL | 3745 | §103§112 | Non-Final OA | 8d overdue | Pending | Dec 16, 2024 |
| 18957158 | METHOD FOR MANAGING EMERGENCY ACCESS TO A COMPUTER SYSTEM OF A RENEWABLE POWER PLANT | AMEVIGBE, KOMI NOUNYANOU | 2493 | §103 | Final Rejection | 46d | Pending | Nov 22, 2024 |
| 18867097 | WIND TURBINE BLADE | LAMBERT, WAYNE A | 3745 | §102§103§112 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18942308 | METHOD AND A SYSTEM FOR OPTIMIZING USE OF A PROCESSING RESOURCE IN A WIND ENERGY INSTALLATION | REFAI, RAMSEY | 3664 | §101 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18933123 | METHOD FOR ADMINISTERING ACCESS RIGHTS TO A UNIT IN A RENEWABLE POWER GENERATING SYSTEM | ABEDIN, SHANTO | 2494 | §103 | Non-Final OA | 29d | Pending | Oct 31, 2024 |
| 18852160 | WIND TURBINE WITH CONTROL NETWORK AND MONITORING NETWORK | GOLIK, ARTHUR PAUL | 3745 | §103§112 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18843048 | A METHOD FOR CONTROLLING A POWER PLANT | KHUU, HIEN DIEU THI | 2116 | §101§102§103§112 | Non-Final OA | — | Pending | Aug 30, 2024 |
| 18710890 | A NACELLE INSTALLATION METHOD AT A WIND TURBINE | WALTERS, RYAN J | 3635 | §102§103§112 | Non-Final OA | — | Pending | May 16, 2024 |
| 18572843 | A SEGMENTED WIND TURBINE TOWER SECTION AND METHOD OF ASSEMBLING SAME | KENNY, DANIEL J | 3633 | §102 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18572234 | A BLADE FOR A WIND TURBINE | GOLIK, ARTHUR PAUL | 3745 | §103 | Non-Final OA | — | Pending | Dec 20, 2023 |
| 18567902 | STABILIZED WIND TURBINES, SYSTEMS FOR STABILIZING WIND TURBINES, AND METHODS FOR INSTALLING SAME | KENNY, DANIEL J | 3633 | §103§112 | Non-Final OA | — | Pending | Dec 07, 2023 |
| 18557544 | CONTROL SCHEME FOR CLUSTER OF WIND TURBINES | DAVIS, JASON GREGORY | 3745 | §103 | Final Rejection | 23d | Pending | Oct 26, 2023 |
| 18554689 | A METHOD OF DETERMINING A LAYOUT OF A WIND ENERGY PLANT | WECHSELBERGER, ALFRED H. | 2187 | §101§103 | Non-Final OA | — | Pending | Oct 10, 2023 |
| 18553450 | OPERATING A WIND TURBINE IN A WIND POWER PLANT DURING LOSS OF COMMUNICATION | REITZ, MICHAEL K. | 3745 | §112 | Final Rejection | — | Pending | Sep 29, 2023 |
| 18014309 | ENERGY STORAGE ADAPTIVE AUGMENTATION FOR LOAD RESPONSE | HERNANDEZ, MANUEL J | 2859 | §103§112 | Non-Final OA | — | Pending | Jan 03, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialVestas Wind Systems A/S has 30 pending office actions as of October 2026, spread across 13 art units and 23 examiners.
Arthur Paul Golik has the most, with 4 of Vestas Wind Systems A/S's pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.