Listed by the USPTO as WECHSELBERGER, ALFRED H.
Tech Center 2100 • Art Units: 2121 2123 2129 2146 2148 2187
This examiner grants 59% of resolved cases
WECHSELBERGER, ALFRED H. is assigned to art unit 2121 in tech center 2100. The record covers 229 resolved cases, with an allowance rate of 59.0% and a median of 1339 days to allowance. The interview lift is 31.5%, indicating that interviews may provide useful support in a prosecution process with a lengthy median duration.
The leading companies are The Boeing Company, Saudi Arabian Oil Company, and TotalEnergies SE. The leading firms are SUGHRUE MION, PLLC, OBLON, MCCLELLAND, MAIER & NEUSTADT, L.L.P., and SEED INTELLECTUAL PROPERTY LAW GROUP LLP. These organizations provide relevant context for evaluating arguments and interview timing.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18515379 | DATA GENERATION APPARATUS, DATA GENERATION METHOD, NON-TRANSITORY COMPUTER READABLE MEDIUM AND MAGNETIC RESONANCE IMAGING APPARATUS | Non-Final OA | Canon Kabushiki Kaisha |
| 17557005 | METHOD FOR AUTOMATIC DESIGN CONCEPT DEFINITION AND ARCHETYPE SELECTION FOR LARGE SETS OF DESIGNS RESPECTING MULTIPLE DESCRIPTION SPACES | Final Rejection | Honda Motor Co., Ltd. |
| 18485927 | Object Design Evaluation Based on Rework and Weight Costs | Non-Final OA | The Boeing Company |
| 17689563 | Advances to Through-Thickness Reinforced Composite Analysis Capabilities | Non-Final OA | The Boeing Company |
| 17654565 | METHOD FOR PREDICTING A SEISMIC MODEL | Non-Final OA | SAUDI ARABIAN OIL COMPANY |
| 17643993 | RESERVOIR SIMULATION BASED ON CAPACITANCE-RESISTANCE MODELING FOR HYDROCARBON EXPLORATION | Final Rejection | Saudi Arabian Oil Company |
| 18554689 | A METHOD OF DETERMINING A LAYOUT OF A WIND ENERGY PLANT | Non-Final OA | VESTAS WIND SYSTEMS A/S |
| 17625711 | A METHOD FOR ADAPTING AN UNSTRUCTURED MESH MODEL OF A GEOLOGICAL SUBSURFACE | Final Rejection | TotalEnergies OneTech |
| 17609682 | METHOD FOR MODELLING A FACIES LOG OF A SEDIMENTARY BASIN USING A STRATIGRAPHIC FORWARD MODELLING PROGRAM | Non-Final OA | TotalEnergies OneTech |
| 18872594 | MACHINING SIMULATION DEVICE AND MACHINING SIMULATION METHOD | Non-Final OA | FANUC CORPORATION |
| 17964773 | MOMENTUM CONSERVATION IN PHYSICS ENGINES | Final Rejection | Nvidia Corporation |
| 18038797 | SIMULATION DEVICE, STORAGE MEDIUM HAVING SIMULATION PROGRAM AND METHOD | Non-Final OA | OMRON Corporation |
| 18282145 | SINGULAR MATERIAL DETECTION APPARATUS, CONTROL METHOD, AND NON-TRANSITORY COMPUTER READABLE MEDIUM | Non-Final OA | TOHOKU UNIVERSITY |
| 18169355 | UNDERGROUND STRUCTURE DETECTION APPARATUS AND UNDERGROUND STRUCTURE DETECTION METHOD | Final Rejection | HITACHI, LTD. |
| 18431794 | EXTRACTING AND PUBLISHING POINT DATA FROM A BUILDING SITE MODEL | Non-Final OA | Honeywell International Inc. |
| 18045255 | UBIQUITOUS REAL-TIME FRACTURE MONITORING | Non-Final OA | CONOCOPHILLIPS COMPANY |
| 18282086 | DATA PROCESSING METHOD | Non-Final OA | MEDIT CORP. |
| 18473047 | STATISTICALLY MODELING EFFECT OF FOG ON LIDAR DATA | Non-Final OA | GM Cruise Holdings LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy59.0% of resolved applications examined by Alfred H. Wechselberger were allowed (229 resolved cases), compared with 32.0% across Art Unit 2121 over the last five years.
This examiner's interview lift is +31.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Alfred H. Wechselberger took 1,339 days on average from filing to allowance.
Alfred H. Wechselberger examines applications in Art Unit 2121 in Tech Center 2100 (Computing & Software).