Listed by the USPTO as ELPENORD, CANDAL
Tech Center 2600 • Art Units: 2416 2473 2616
This examiner grants 90% of resolved cases
ELPENORD, CANDAL is assigned to tech center 2600 and art unit 2416. The profile records 1113 resolved cases and an allowance rate of 89.8%. The median time to allowance is 925 days. This combination shows a high observed allowance rate alongside a prosecution timeline that remains material for filing and portfolio planning.
The interview lift is 12.5%, indicating a positive association between interviews and allowances. Samsung Electronics Co., Ltd., Beijing Xiaomi Mobile Software Co., Ltd., and LG Electronics Inc. are the listed top companies. The listed firms are FINNEGAN, HENDERSON, FARABOW, GARRETT & DUNNER, VOLPE KOENIG, and Harrity & Harrity, LLP \ Qualcomm. Practitioners can use the profile to evaluate how interview-based engagement may fit within amendment and response planning.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18851235 | Artificial Intelligence/Machine Learning Model Management Between Wireless Radio Nodes | Non-Final OA | Telefonaktiebolaget LM Ericsson (publ) |
| 18844231 | NETWORK NODE AND METHOD IN A WIRELESS COMMUNICATIONS NETWORK | Non-Final OA | Telefonaktiebolaget LM Ericsson (publ) |
| 18860507 | METHOD AND DEVICE FOR PERFORMING SIDELINK COMMUNICATION IN WIRELESS COMMUNICATION SYSTEM | Non-Final OA | LG Electronics Inc. |
| 18902835 | DYNAMIC SUB-CHANNEL PRE-ALLOCATION | Non-Final OA | Samsung Electronics Co., Ltd. |
| 18902838 | BUFFER STATUS REPORT FOR PEER-TO-PEER COMMUNICATIONS | Non-Final OA | Samsung Electronics Co., Ltd. |
| 18701418 | METHOD AND DEVICE FOR TRANSMITTING/RECEIVING SIDELINK INFORMATION IN UNLICENSED BAND | Final Rejection | Samsung Electronics Co., Ltd. |
| 18484377 | CROSS-LINK POWER MANAGEMENT IN MULTI-LINK OPERATION | Final Rejection | Samsung Electronics Co., Ltd. |
| 18935401 | RATE MATCHING FOR INTER-CELL MULTIPLE TRANSMIT-RECEIVE POINT OPERATION | Non-Final OA | Apple Inc. |
| 18419705 | METHOD FOR TRANSMITTING INFORMATION, METHOD FOR PROCESSING INFORMATION AND APPARATUSES THEREOF | Final Rejection | FUJITSU LIMITED |
| 18848732 | SCHEDULING RESTRICTIONS FOR LAYER 1 MEASUREMENTS IN LAYER 1/LAYER 2 INTER-CELL MOBILITY OPERATIONS | Non-Final OA | QUALCOMM Incorporated |
| 18834405 | DOWNLINK-GRANT DOWNLINK CONTROL INFORMATION ACTIVATED CHANNEL STATE INFORMATION REPORTS | Non-Final OA | QUALCOMM Incorporated |
| 18864414 | INFORMATION REPORTING METHOD AND APPARATUS, INFORMATION RECEIVING METHOD AND APPARATUS, DEVICE, AND STORAGE MEDIUM | Non-Final OA | Beijing Xiaomi Mobile Software Co., Ltd. |
| 18853924 | METHOD AND APPARATUS FOR TRANSMITTING POWER INFORMATION OF SYNCHRONIZATION SIGNAL, AND READABLE STORAGE MEDIUM | Non-Final OA | Beijing Xiaomi Mobile Software Co., Ltd. |
| 18727778 | INFORMATION REPORTING METHOD AND APPARATUS, INFORMATION RECEIVING METHOD AND APPARATUS, DEVICE, AND STORAGE MEDIUM | Final Rejection | Beijing Xiaomi Mobile Software Co., Ltd. |
| 17828225 | FREQUENCY CHANGE DURING CONNECTION EVENT | Final Rejection | TEXAS INSTRUMENTS INCORPORATED |
| 18835707 | ACCESS RESOURCE SELECTION FOR SMALL DATA TRANSMISSION | Non-Final OA | Nokia Technologies Oy |
| 18895427 | RESOURCE CONTROL METHOD AND APPARATUS, TERMINAL, AND NETWORK SIDE DEVICE | Non-Final OA | VIVO MOBILE COMMUNICATION CO., LTD. |
| 18419709 | METHOD AND APPARATUS FOR MEASURING SENSING SIGNAL, NETWORK DEVICE, AND TERMINAL | Final Rejection | VIVO MOBILE COMMUNICATION CO., LTD. |
| 18920688 | SIMULTANEOUS UPLINK TRANSMISSION SCHEMES IN WIRELESS COMMUNICATIONS | Non-Final OA | ZTE Corporation |
| 18758965 | SIDELINK POSITIONING | Final Rejection | ZTE Corporation |
| 18796820 | MEASURING PERFORMANCE OF REDUNDANT NETWORKS IN REAL-TIME | Non-Final OA | Cisco Technology, Inc. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy89.8% of resolved applications examined by Candal Elpenord were allowed (1,113 resolved cases), compared with 72.0% across Art Unit 2416 over the last five years.
This examiner's interview lift is +12.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Candal Elpenord took 925 days on average from filing to allowance.
Candal Elpenord examines applications in Art Unit 2416 in Tech Center 2600 (Communications).