Listed by the USPTO as GIRI, PURSOTTAM
Tech Center 3700 • Art Units: 2116 2128 2147 2186 2188 3772
This examiner grants 20% of resolved cases
GIRI, PURSOTTAM works in Technology Center 3700 and Art Unit 2116. The record covers 142 resolved cases, with an allowance rate of 19.7% and a median of 1521 days to allowance. The interview lift is 11.6%, indicating a positive but limited association between interviews and allowance outcomes.
The principal companies are Siemens Aktiengesellschaft, International Business Machines Corporation, and Halliburton Energy Services Inc. The leading firms are Blueshift IP LLC, FisherBroyles, LLP - Align Technology, Inc., and Fortem IP LLP. The outcome pattern supports early development of claim strategy, detailed treatment of cited art, and realistic timing expectations. Interviews may help clarify technical issues, but the allowance rate indicates that practitioners should not rely on interview use alone. The affiliations span industrial, computing, and energy technologies.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 17245985 | SYSTEM AND METHOD FOR OPTIMIZING A PERORATION SCHEMA WITH A STAGE OPTIMIZATION TOOL | Non-Final OA | HALLIBURTON ENERGY SERVICES, INC. |
| 17897493 | INFORMATION PROCESSING APPARATUS AND MONITORING METHOD FOR DETECTING ABNORMALITY OF MONITORING TARGET | Non-Final OA | CANON KABUSHIKI KAISHA |
| 17874936 | SYSTEMS AND METHODS FOR OPTIMIZING AN ANTENNA ARRAY TO SUPPRESS SIDE-LOBE POWER | Final Rejection | Toyota Motor Engineering & Manufacturing North America, Inc. |
| 17795486 | SPATIAL DESIGN SYSTEM, SPATIAL DESIGN METHOD, AND PROGRAM | Final Rejection | Panasonic Intellectual Property Management Co., Ltd. |
| 18320634 | PREDICTION OF VEHICLE COMBINATION DRAG AREA INCLUDING CROSSWIND SENSITIVITY | Non-Final OA | VOLVO TRUCK CORPORATION |
| 18077181 | SYSTEMS AND METHODS FOR AN ADAPTIVE POWER SYSTEM STABILIZER (PSS) | Final Rejection | General Electric Company |
| 18311553 | METHOD TO IMAGE SMALL-SCALE VARIABILITY OF SUBSURFACE RESERVOIRS | Non-Final OA | KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS |
| 17783342 | TRANSMISSION DEVICE FOR TRANSMITTING DATA | Non-Final OA | SIEMENS MOBILITY GMBH |
| 18253701 | SYSTEMS AND METHODS FOR GENERATION OF EXPLODED VIEWS OF COMPUTER-AIDED DESIGN MODELS | Non-Final OA | Siemens Industry Software Inc. |
| 17890805 | GENERATION OF CFD-BASED STRUCTURALLY INDEPENDENT AERODYNAMIC INFLUENCE COEFFICIENT MATRIX | Non-Final OA | Siemens Industry Software Inc. |
| 18320246 | DIGITAL TWIN ANALYSIS FOR FIXTURE DESIGN BY ADDITIVE MANUFACTURING | Non-Final OA | INTERNATIONAL BUSINESS MACHINES CORPORATION |
| 17651088 | ANALYZING SOUND WAVE PROPAGATION IN AN AQUATIC MEDIUM | Final Rejection | International Business Machines Corporation |
| 17582299 | DYNAMIC HOSTING CAPACITY ANALYSIS FRAMEWORK FOR DISTRIBUTION SYSTEM PLANNING | Final Rejection | Hitachi, Ltd. |
| 18274181 | GENERATING SIMULATION ENVIRONMENTS FOR TESTING AV BEHAVIOUR | Non-Final OA | FIVE AI LIMITED |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy19.7% of resolved applications examined by Pursottam Giri were allowed (142 resolved cases), compared with 70.1% across Art Unit 2116 over the last five years.
This examiner's interview lift is +11.6 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Pursottam Giri took 1,521 days on average from filing to allowance.
Pursottam Giri examines applications in Art Unit 2116 in Tech Center 3700 (Medical Devices & Mechanical Engineering).