Listed by the USPTO as HOPKINS, DAVID ANDREW
Tech Center 2100 • Art Units: 2122 2128 2147 2186 2188
This examiner grants 32% of resolved cases
HOPKINS, DAVID ANDREW is assigned to Tech Center 2100 and Art Unit 2122. The record contains 234 resolved cases, with a 32.1% allowance rate and a median of 1382 days to allowance. The 37.7% interview lift indicates a higher allowance outcome for cases involving interviews in the recorded data.
Halliburton Energy Services Inc., The Regents of the University of Michigan, and GM Cruise Holdings LLC are the listed companies. The listed firms are GREENBERG TRAURIG, LLP (BOS), MARSHALL, GERSTEIN & BORUN LLP, and Artegis Law Group, LLP. The allowance rate indicates that prosecution may require careful claim positioning and sustained response work. The interview measure supports considering a prepared examiner discussion, while the median timing calls for early planning around prosecution duration and available claim strategies.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18125499 | BOREHOLE FLUID FLOW MODELLING USING DYNAMIC PRESSURE BOUNDARY | Non-Final OA | Halliburton Energy Services, Inc. |
| 17550064 | System to Correlate Suitable Slurry Designs with Petrophysical While-Drilling Measurements in Real Time | Non-Final OA | Halliburton Energy Services, Inc. |
| 17987411 | SYSTEMS AND METHODS FOR SEMI-DISCRETE MODELING OF PROGRESSIVE DAMAGE AND FAILURE IN COMPOSITE LAMINATE MATERIALS | Final Rejection | THE REGENTS OF THE UNIVERSITY OF MICHIGAN |
| 17987417 | SYSTEMS AND METHODS FOR SEMI-DISCRETE MODELING OF DELAMINATION MIGRATION IN COMPOSITE LAMINATE MATERIALS | Final Rejection | THE REGENTS OF THE UNIVERSITY OF MICHIGAN |
| 18103091 | STATE TRANSITION MATRIX-BASED POWER SYSTEM SIMULATION | Final Rejection | X Development LLC |
| 18187472 | Petrophysical Modeling of a Subterranean Formation | Non-Final OA | Saudi Arabian Oil Company |
| 18144277 | MATERIAL PROCESSING MODELING | Non-Final OA | Taiwan Semiconductor Manufacturing Company Limited |
| 17127500 | TECHNIQUES FOR AUTOMATICALLY GENERATING FRAME GRIDS FOR STRUCTURAL SYSTEMS OF BUILDINGS | Final Rejection | AUTODESK, INC. |
| 18319666 | EMULATED DEVICE MANAGEMENT SYSTEM | Non-Final OA | Dell Products L.P. |
| 18093666 | SIMULATION TEST VALIDATION | Final Rejection | GM Cruise Holdings LLC |
| 18074016 | ATTRIBUTION OF REPRODUCIBILITY RESULTS OF AUTONOMOUS VEHICLE SUBSYSTEM | Final Rejection | GM Cruise Holdings LLC |
| 18184796 | Bone Resection Scoring and Planning | Non-Final OA | Stryker Australia PTY LTD |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy32.1% of resolved applications examined by David Andrew Hopkins were allowed (234 resolved cases), compared with 31.6% across Art Unit 2122 over the last five years.
This examiner's interview lift is +37.7 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by David Andrew Hopkins took 1,382 days on average from filing to allowance.
David Andrew Hopkins examines applications in Art Unit 2122 in Tech Center 2100 (Computing & Software).