Prosecution Insights
Last updated: August 17, 2026

Examiner: JARIWALA, CHIRAG

Tech Center 3700 • Art Units: 3746

This examiner grants 62% of resolved cases

Performance Statistics

62.1%
Allow Rate
-7.9% vs TC avg
475
Total Applications
+27.0%
Interview Lift
1133
Avg Prosecution Days
Based on 420 resolved cases, 2023–2026

Rejection Statute Breakdown

0.6%
§101 Eligibility
19.6%
§102 Novelty
46.6%
§103 Obviousness
30.9%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18300227 FAN Final Rejection Nanjing Chervon Industry Co., Ltd.
19071883 SCROLL ELECTRIC COMPRESSOR Final Rejection KABUSHIKI KAISHA TOYOTA JIDOSHOKKI
18588695 ELECTRICAL SUBMERSIBLE PUMPING SYSTEMS AND METHODS Non-Final OA Saudi Arabian Oil Company
18482259 APPARATUS FOR PUMPING SUSPENDED POLYMER LIQUID Final Rejection ChampionX LLC
13987844 Air ducting shroud for cooling an air compressor pump and motor Final Rejection Black & Decker Inc.
18773007 FLUID ENDS FOR PUMPS AND RELATED METHODS Non-Final OA Vulcan Industrial Holdings, LLC
18274651 HARD SEAL COMPACT, POSITIVE DISPLACEMENT PUMP WITH RECIPROCATING MOTION Final Rejection Becton, Dickinson and Company
17813573 CONTROL OF A DUAL-PUMP SINGLE-POWER SOURCE SYSTEM Final Rejection Caterpillar Inc.
18139937 FAN WATERPROOF STRUCTURE Final Rejection ASIA VITAL COMPONENTS (CHINA) CO., LTD.

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month