Listed by the USPTO as KIM, EUNHEE
Tech Center 4100 • Art Units: 2123 2127 2146 2147 2187 2188 4100
This examiner grants 77% of resolved cases
Eunhee Kim serves in Art Unit 2123 within Tech Center 4100, managing 750 resolved cases. The allowance rate is 77.3 percent, and the median time to allowance is 1234 days. These figures provide the prosecution history for applications in this specific docket. The 1234 days to allowance is the median duration for cases that reach a grant. Practitioners can use the 77.3 percent allowance rate to understand the frequency of successful outcomes.
The interview lift is 12.2 percent, which represents the change in allowance probability after an interview. This 12.2 percent lift is a factor for practitioners to consider when deciding whether to engage in verbal advocacy. The Boeing Company, International Business Machines Corporation, and Toyota Motor Corporation are the leading applicants. 2SPL Patent Attorneys and Cascadia Intellectual Property are the top firms in this docket. The 750 resolved cases and 4100 Tech Center designation identify the scope of the examiner's work. The 77.3 percent allowance rate and 1234 days to allowance are the recorded metrics for Art Unit 2123.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18352352 | MANAGEMENT METHOD, SYSTEM, AND PROGRAM FOR OBJECT HANDLING WORK IN DISTRIBUTION CENTER | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18417786 | VIRTUAL TESTING OF AUTONOMOUS ENVIRONMENT CONTROL SYSTEM | Final Rejection | State Farm Mutual Automobile Insurance Company |
| 18224773 | INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING METHOD, AND RECORDING MEDIUM | Non-Final OA | Panasonic Intellectual Property Management Co., Ltd. |
| 17184169 | SIMULATED AGENTS BASED ON DRIVING LOG DATA | Final Rejection | Zoox, Inc. |
| 17991859 | HORIZONTAL WELL PRODUCTION METHOD WITH UNIFORM FLOW | Final Rejection | Petróleo Brasileiro S.A. - Petrobras |
| 18466602 | SYSTEM AND METHOD FOR GENERATING A TOPOLOGY OPTIMIZED CONFORMAL PANEL INFILL GEOMETRY OF A SANDWICH PANEL | Non-Final OA | The Boeing Company |
| 18317477 | SYSTEMS AND METHODS FOR AIRCRAFT THRUST RATING MODEL PROCESSING | Non-Final OA | THE BOEING COMPANY |
| 18033393 | DEVELOPING ADAPTABLE PREDICTIVE ANALYTICS FOR SUBJECTS IN MEDICAL FACILITIES | Final Rejection | KONINKLIJKE PHILIPS N.V. |
| 18340925 | STORAGE MEDIUM, OPTIMIZATION METHOD, AND INFORMATION PROCESSING APPARATUS | Non-Final OA | Fujitsu Limited |
| 18317910 | METHOD, APPARATUS, AND SYSTEM FOR SIMULATING A PARTICLE TRANSPORT AND DETERMINING HUMAN DOSE IN A RADIOTHERAPY | Non-Final OA | SHANGHAI UNITED IMAGING HEALTHCARE CO., LTD. |
| 17901681 | PREDICTING HYDROCARBON SHOW INDICATORS AHEAD OF DRILLING BIT | Non-Final OA | Saudi Arabian Oil Company |
| 17997386 | METHOD AND APPARATUS FOR COMPARING A SIMULATION OF A PHYSICAL OBJECT WITH MEASUREMENT DATA OF THE PHYSICAL OBJECT, AND METHOD AND AN APPARATUS FOR GENERATING A FINITE ELEMENT REPRESENTATION OF MEASUREMENT DATA OF A PHYSICAL OBJECT | Non-Final OA | FRAUNHOFER-GESELLSCHAFT zur Forderung der angewandten Forschung e V |
| 18463576 | COMPUTING DEVICE AND COMPUTING METHOD FOR A VIRTUAL ENVIRONMENT MEASUREMENT | Non-Final OA | DELTA ELECTRONICS, INC. |
| 18263087 | METHOD FOR MODELLING TRANSPORT AND DEPOSITION OF SEDIMENTS AND THE EVOLUTION OF A SEDIMENTARY BASIN | Non-Final OA | TotalEnergies OneTech |
| 18201732 | OPTIMIZING A MANUFACTURING PROCESS OF A PHYSICAL PRODUCT USING A VIRTUAL ENVIRONMENT | Non-Final OA | International Business Machines Corporation |
| 18185534 | USING COMPUTER MODELS TO DESIGN OBJECTS WITH SELF-HEALING MATERIAL ZONES | Non-Final OA | INTERNATIONAL BUSINESS MACHINES CORPORATION |
| 18032996 | METHOD AND APPARATUS FOR DETERMINING LOW-CYCLE FATIGUE OF MECHANICAL COMPONENT, AND STORAGE MEDIUM | Non-Final OA | Siemens Energy Global GmbH & Co. KG |
| 17534838 | APPARATUS AND METHOD FOR TWO-STAGE DETECTION OF FURNACE FLOODING OR OTHER CONDITIONS | Final Rejection | Honeywell International, Inc. |
| 17990301 | DUAL MODEL SHAPE SYNTHESIS | Final Rejection | Autodesk, Inc. |
| 17896735 | BUILDING ELEMENT PLACEMENT USING SPACE BODIES AND GAPS | Non-Final OA | Trimble Inc. |
| 17506888 | MODULARIZED DIGITAL TWIN CREATION FOR PHYSICAL INFRASTRUCTURE OF COMPUTING ENVIRONMENT | Non-Final OA | Dell Products L.P. |
| 17419689 | METHOD FOR METROLOGY OPTIMIZATION FOR LITHOGRAPHIC SYSTEMS | Final Rejection | ASML Netherlands B.V. |
| 17982472 | PLASMA HYPERMODEL INTEGRATED WITH FEATURE-SCALE PROFILE MODEL FOR ACCELERATED ETCH PROCESS DEVELOPMENT | Final Rejection | KLA CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy77.3% of resolved applications examined by Eunhee Kim were allowed (750 resolved cases), compared with 38.8% across Art Unit 2123 over the last five years.
This examiner's interview lift is +12.2 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Eunhee Kim took 1,234 days on average from filing to allowance.
Eunhee Kim examines applications in Art Unit 2123 in Tech Center 4100.