Prosecution Insights
Last updated: October 04, 2026

Examiner: MACDONALD, STEVEN A

Tech Center 4100 • Art Units: 1713 3674 3676 4100

This examiner grants 80% of resolved cases

Analysis

Steven A. MacDonald is an examiner in Tech Center 4100 and Art Unit 1713. The data shows 693 resolved cases for this examiner. Among these 693 resolved cases, the allowance rate is 80.2 percent. This 80.2 percent rate indicates a favorable environment for applicants seeking a patent grant. The median days to allowance for this examiner is 865, which serves as a benchmark for the duration of prosecution in Art Unit 1713.

The interview lift is 13.1 percent. This 13.1 percent lift indicates that cases involving an interview have a higher likelihood of allowance than those that do not. For practitioners, this positive lift suggests that engaging with the examiner in Tech Center 4100 can be an effective strategy. The 865 median days to allowance is an important factor for applicants to consider when planning their strategy.

With 693 resolved cases, the examiner's metrics provide a stable outlook for future applications. The 80.2 percent allowance rate and the 13.1 percent interview lift are essential for assessing the risks and opportunities of prosecution. Practitioners can use the 865-day median to set realistic expectations for their clients. These figures offer a detailed perspective on the examiner's work in Art Unit 1713.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Performance Statistics

80.2%
Allow Rate
+20.2% vs TC avg
717
Total Applications
+13.1%
Interview Lift
865
Avg Prosecution Days
Based on 693 resolved cases, 2023–2026

Rejection Statute Breakdown

0.8%
§101 Eligibility
21.3%
§102 Novelty
50.3%
§103 Obviousness
23.9%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
19379604 FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL Non-Final OA Halliburton Energy Services, Inc.
19379591 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL Non-Final OA Halliburton Energy Services, Inc.
19210156 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF Final Rejection Halliburton Energy Services, Inc.
19210231 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND MECHANICAL STRENGTHENING FEATURE AT A JOINT THEREOF Final Rejection Halliburton Energy Services, Inc.
19187364 DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SPINNING FEATURE OF A DOWNHOLE DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE SPINNING FEATURE Final Rejection Halliburton Energy Services, Inc.
19445228 LEAK CONTAINMENT SYSTEM Non-Final OA Hydril USA Distribution LLC
19416974 SYSTEMS AND METHODS FOR CONNECTING SEPARATE COILED TUBING STRINGS AT A WELLSITE Non-Final OA Grant Prideco, Inc.
19202293 TOOLS, SYSTEMS, AND METHODS FOR DOWNHOLE MONITORING Non-Final OA Geo Pressure Systems Inc.
19076911 A SINGLE RUN SYSTEM FOR RUNNING LINER AND SUSPENSION PLUG DOWN HOLE AND METHOD OF USING SAME Non-Final OA Import Tool Corporation Ltd.
18038205 MULTI-TRIP ANNULAR SEAL REPAIR METHOD AND ASSOCIATED EQUIPMENT Final Rejection BISN Tec. Ltd.

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Who Appears Before This Examiner

Top companies before this examiner

Law firms appearing most often

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month