Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
185 pending office actions • 54 art units • 125 examiners • 0 of 185 (0%) have an AI response strategy ready • 523 patents granted in the last 365 days
Halliburton Energy Services Inc. has 182 pending office actions in the Transportation, E-Commerce & Mechanical Systems technology area. These actions are assigned to 126 distinct examiners, indicating that the company interacts with many individuals at the patent office. The portfolio is distributed across 47 distinct art units, which requires the legal team to manage various technical and procedural requirements.
The examiner HALL, KRISTYN A is responsible for 6 pending office actions. While this is a concentration of work, the majority of the 182 pending office actions are spread across other assigned professionals. Practitioners should monitor the outcomes of the 6 actions under HALL, KRISTYN A to identify potential trends that might affect other matters within the Transportation, E-Commerce & Mechanical Systems area.
With 47 distinct art units involved, the company must ensure that its prosecution strategy is consistent across different technical fields. The involvement of 126 distinct examiners means that the company faces a variety of examination styles. Managing the current workload effectively requires a coordinated approach that accounts for the specific standards of the assigned art units and the individual perspectives of the examiners, including the 6 actions assigned to HALL, KRISTYN A.
Based on the USPTO statutory response window for each pending office action. 53 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 53 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 13 (7%) |
| §101 + other | 37 (20%) |
| §103 only | 51 (28%) |
| §102 only | 9 (5%) |
| §112 only | 6 (3%) |
| Double-patenting only | 1 (1%) |
| Double-patenting + other | 4 (2%) |
| Multi-statute (no §101) | 64 (35%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HALL, KRISTYN A | 6 | 82.1% | -5.9% |
| CARROLL, DAVID P. | 5 | 80.1% | +14.3% |
| MACDONALD, STEVEN A | 5 | 80.2% | +13.1% |
| ANDREWS, DAVID L | 5 | 71.6% | +16.2% |
| PATEL, NEEL G | 5 | 61.9% | +35.2% |
| WALLACE, KIPP CHARLES | 4 | 78.3% | +25.5% |
| BOMAR, THOMAS S | 4 | 83.0% | +0.1% |
| NORRIS, URSULA LEE | 3 | 81.7% | +6.5% |
| CULLER, JILL E | 3 | 57.3% | +13.8% |
| YAO, THEODORE N | 3 | 66.7% | +39.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18233767 | Duty Cycle Estimation From Bending Moment Magnitude | NORRIS, URSULA LEE | 27d |
| 19423108 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | — |
| 19422983 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | — |
| 19423141 | DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) | CARROLL, DAVID P. | — |
| 19393440 | EXTENSIBLE TRANSITION JOINT FOR CONTROL LINE PROTECTION | BOMAR, THOMAS S | — |
| 19379604 | FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL | MACDONALD, STEVEN A | — |
| 19379591 | FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL | MACDONALD, STEVEN A | — |
| 19379641 | FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS | CARROLL, DAVID P. | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17471345 | Core Data Augmentation Methods For Developing Data Driven Based Petrophysical Interpretation Models | JONES, CHARLES JEFFREY | 150d overdue |
| 17958178 | Autonomous Uncertainty-Aware Engine For Pressure Gradient Identification Using A Discrete Optimization Framework | CHAVEZ, ANTHONY RAY | 77d overdue |
| 18492915 | LONG-TERM TREND ANALYSIS FOR EQUIPMENT FOR WELL SYSTEMS | WORKU, KIDEST | 53d overdue |
| 18232023 | ANISOTROPY MEASUREMENTS BY FORMATION TESTER TRACER MEASUREMENTS | ISLAM, MOHAMMAD K | 36d overdue |
| 17944818 | DESIGNING SMART ENVIRONMENTAL EFFICIENCY FLUIDS | COCCHI, MICHAEL EDWARD | 36d overdue |
| 19286667 | INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH | ANDREWS, DAVID L | 35d overdue |
| 18508813 | MULTI-SENSOR DOWNHOLE GAUGE | FULLER, ROBERT EDWARD | 22d overdue |
| 19187364 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SPINNING FEATURE OF A DOWNHOLE DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE SPINNING FEATURE | MACDONALD, STEVEN A | 19d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19286667 | INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH | ANDREWS, DAVID L | 35d overdue |
| 19187364 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SPINNING FEATURE OF A DOWNHOLE DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE SPINNING FEATURE | MACDONALD, STEVEN A | 19d overdue |
| 18494395 | SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER | ANDREWS, DAVID L | 8d overdue |
| 19232491 | VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL | YAO, THEODORE N | 26d |
| 18365000 | CUTTINGS MAGNETIC SUSCEPTIBILITY AND ASSOCIATED DEVICE | CULLER, JILL E | 28d |
| 18959063 | MAGNETICALLY COUPLED SUBSURFACE SAFETY VALVE | ANDREWS, DAVID L | 71d |
| 19050284 | BALL-TYPE FLOW STOPPER INCLUDING A PRESSURE ACTIVATED CANTILEVER FEATURE | PATEL, NEEL G | 79d |
| 19546048 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | — |
| Art Unit | Apps |
|---|---|
| 3676 | 29 |
| 2857 | 26 |
| 3674 | 25 |
| 3672 | 18 |
| 2186 | 6 |
| 2853 | 5 |
| 2188 | 5 |
| 2858 | 4 |
| 3645 | 4 |
| 2855 | 4 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19546048 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | 3674 | §102§103 | Non-Final OA | — | Pending | Feb 20, 2026 |
| 19546026 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | 3674 | §102§103Other | Non-Final OA | — | Pending | Feb 20, 2026 |
| 19536486 | DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS | CARROLL, DAVID P. | 3674 | §103§112 | Non-Final OA | — | Pending | Feb 11, 2026 |
| 19423108 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | 3674 | §102Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19422983 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | 3674 | §102Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19423141 | DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) | CARROLL, DAVID P. | 3674 | §112Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19407655 | EXPANDABLE METAL SLIP RING FOR USE WITH A SEALING ASSEMBLY | GAY, JENNIFER HAWKINS | 3619 | §101§103§112 | Non-Final OA | — | Pending | Dec 03, 2025 |
| 19402783 | MULTIPHYSICS FOR WHITE HYDROGEN PROSPECTING | GRAY, GEORGE STERLING | 3676 | §102§103§112 | Non-Final OA | — | Pending | Nov 26, 2025 |
| 19400023 | WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES | GAY, JENNIFER HAWKINS | 3619 | §102§103DP | Non-Final OA | — | Pending | Nov 25, 2025 |
| 19393440 | EXTENSIBLE TRANSITION JOINT FOR CONTROL LINE PROTECTION | BOMAR, THOMAS S | 3674 | §102Other | Non-Final OA | — | Pending | Nov 18, 2025 |
| 19388734 | MILLING ASSEMBLY FOR DRILLING A MULTILATERAL WELLBORE | WALLACE, KIPP CHARLES | 3674 | §103 | Non-Final OA | — | Pending | Nov 13, 2025 |
| 19379604 | FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL | MACDONALD, STEVEN A | 3674 | §103 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19379632 | FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND A RESISTIVITY BASED POSITION SENSOR | CARROLL, DAVID P. | 3674 | §103§112Other | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19379591 | FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL | MACDONALD, STEVEN A | 3674 | §103 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19379641 | FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS | CARROLL, DAVID P. | 3674 | §103DP | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19371271 | FLUID FLOW CONTROL SYSTEM EMPLOYING A FLUIDIC DIODE FOR CONTROL PRESSURE | CARROLL, DAVID P. | 3674 | §101§102§112Other | Non-Final OA | — | Pending | Oct 28, 2025 |
| 19358048 | OFFSET WELL ANALYSIS FOR DERIVING NEXT WELL DRILLING PARAMETERS | NORRIS, URSULA LEE | 3676 | §103§112 | Non-Final OA | — | Pending | Oct 14, 2025 |
| 19347217 | MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE | BOMAR, THOMAS S | 3674 | §103 | Non-Final OA | — | Pending | Oct 01, 2025 |
| 19317582 | A DOWNHOLE TOOL EMPLOYING A PRESSURE INTENSIFIER | ANDREWS, DAVID L | 3672 | §102§112DPOther | Non-Final OA | — | Pending | Sep 03, 2025 |
| 19306927 | OPEN HOLE GRAVEL PACK SYSTEM FOR MANAGED PRESSURE DRILLING (MPD) APPLICATIONS | STEPHENSON, DANIEL P | 3676 | §103 | Final Rejection | — | Pending | Aug 21, 2025 |
| 19286667 | INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH | ANDREWS, DAVID L | 3672 | §102§103§112 | Final Rejection | 35d overdue | Pending | Jul 31, 2025 |
| 19286911 | WELLBORE EXCLUSION FLUID METHOD AND APPARATUS FOR DOWNHOLE LOGGING | CULLER, JILL E | 2853 | §102 | Non-Final OA | — | Pending | Jul 31, 2025 |
| 19240304 | ACTUATOR WITH MOVABLE CYLINDER FOR ROTARY STEERABLE SYSTEM | WALLACE, KIPP CHARLES | 3674 | §102§103 | Final Rejection | — | Pending | Jun 17, 2025 |
| 19233124 | HEATERS TO ACCELERATE SETTING OF EXPANDABLE METAL | YAO, THEODORE N | 3676 | §103§112 | Final Rejection | — | Pending | Jun 10, 2025 |
| 19232491 | VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL | YAO, THEODORE N | 3676 | §102§103§112 | Final Rejection | 26d | Pending | Jun 09, 2025 |
| 19215695 | DOWNHOLE TOOL INCLUDING RELATED LUG SLOTS AND LUGS FOR COUPLING A MILLING TOOL AND WHIPSTOCK ASSEMBLY | THOMPSON, KENNETH L | 3676 | §102 | Final Rejection | 25d overdue | Pending | May 22, 2025 |
| 19210820 | TWO-PART DRILLING AND RUNNING TOOL INCLUDING A ONE WAY MECHANISM | THOMPSON, KENNETH L | 3676 | §102 | Final Rejection | 25d overdue | Pending | May 16, 2025 |
| 19210231 | DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND MECHANICAL STRENGTHENING FEATURE AT A JOINT THEREOF | MACDONALD, STEVEN A | 3674 | §103 | Final Rejection | — | Pending | May 16, 2025 |
| 19210156 | DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF | MACDONALD, STEVEN A | 3674 | §103 | Final Rejection | — | Pending | May 16, 2025 |
| 19210415 | NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS | SUE-AKO, ANDREW B. | 3674 | §112 | Final Rejection | 26d | Pending | May 16, 2025 |
| 19210530 | METHOD FOR PLACING NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS | SUE-AKO, ANDREW B. | 3674 | §112 | Final Rejection | — | Pending | May 16, 2025 |
| 19205002 | TWO-PART DRILLING AND RUNNING TOOL | HALL, KRISTYN A | 3672 | §103 | Final Rejection | — | Pending | May 12, 2025 |
| 19202467 | INTERNAL SLIP DESIGN WITH MINIMUM BACKLASH FOR PACKERS SEAL ENHANCEMENT | LOIKITH, CATHERINE A | 3674 | §101§102§103Other | Non-Final OA | — | Pending | May 08, 2025 |
| 19198323 | ESTIMATION OF ROCK ABRASIVENESS AND ROCK STRENGTH USING BIT RESPONSE DATA | HALL, KRISTYN A | 3672 | §101 | Non-Final OA | — | Pending | May 05, 2025 |
| 19198377 | CUTTER FORCES AND WEAR SEVERITY DETERMINATION FOR A DRILL BIT FOR DRILLING A WELLBORE | HALL, KRISTYN A | 3672 | §101§103§112 | Non-Final OA | 33d | Pending | May 05, 2025 |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | WLODARSKI, NICHOLAS NMN | 3672 | §103§112Other | Final Rejection | — | Pending | Apr 28, 2025 |
| 19191425 | WELLBORE SERVICES SYSTEM WITH ANYTIME ACCESS FOR PUMP MAINTENANCE | FULLER, ROBERT EDWARD | 3676 | §103 | Non-Final OA | 9d | Pending | Apr 28, 2025 |
| 19191202 | TUBING RETRIEVABLE SAFETY VALVE ASSEMBLY WITH SECONDARY FLAPPER AND SEAT | HUTCHINS, CATHLEEN R | 3672 | §101§103Other | Non-Final OA | — | Pending | Apr 28, 2025 |
| 19187364 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SPINNING FEATURE OF A DOWNHOLE DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE SPINNING FEATURE | MACDONALD, STEVEN A | 3674 | §102§103 | Final Rejection | 19d overdue | Pending | Apr 23, 2025 |
| 19187505 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SIGNAL NOISE SOURCE POWERED BY A DOWNHOLE POWER SOURCE, THE SENSOR CONFIGURED TO SENSE FOR NOISE AND SEND UPHOLE OPERATIONAL DATA EMBEDDED WITHIN THE NOISE | AKARAGWE, YANICK A | 3672 | §103 | Final Rejection | 28d overdue | Pending | Apr 23, 2025 |
| 19187195 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A FLOW CONTROL DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE FLOW CONTROL DEVICE | JELLETT, MATTHEW WILLIAM | 3753 | §103§112 | Non-Final OA | — | Pending | Apr 23, 2025 |
| 19071168 | COILED TUBING DEPLOYMENT/RETRIEVAL APPARATUS EMPLOYING MULTIPLE TUBING GUIDES AND A METHOD OF USE THEREOF | BUCK, MATTHEW R | 3672 | §102§103 | Non-Final OA | — | Pending | Mar 05, 2025 |
| 19063643 | MOTION HYPERPARAMETER CORRELATION AND SELECTION FOR NUCLEAR MAGNETIC RESONANCE (NMR) MOTION CORRECTION IN WELL SYSTEMS | PATEL, RISHI R | 2858 | §112 | Non-Final OA | — | Pending | Feb 26, 2025 |
| 19062310 | SAFETY VALVE EMPLOYING A MECHANICAL CONNECTING APPARATUS HAVING ONE OR MORE MAGNETIC TARGETS | ANDREWS, DAVID L | 3672 | §103 | Final Rejection | — | Pending | Feb 25, 2025 |
| 19050284 | BALL-TYPE FLOW STOPPER INCLUDING A PRESSURE ACTIVATED CANTILEVER FEATURE | PATEL, NEEL G | 3676 | §102§112 | Non-Final OA | 79d | Pending | Feb 11, 2025 |
| 19047821 | DIGITALLY RECONFIGURABLE ANALOG COMPUTATIONS FOR SOLVING OPTIMIZATION PROBLEMS | NGUYEN, KHAI M | 2845 | DP | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19042531 | LAYERED TARGET FOR NEUTRON GENERATOR | GARNER, LILY CRABTREE | 3646 | §101§102§112Other | Non-Final OA | — | Pending | Jan 31, 2025 |
| 19040059 | DOWNHOLE TOOL EMPLOYING A WHIPSTOCK ASSEMBLY, PACKER ASSEMBLY AND DOWNHOLE POWER UNIT | WLODARSKI, NICHOLAS NMN | 3672 | §102§103 | Non-Final OA | — | Pending | Jan 29, 2025 |
| 19039680 | EVALUATING SUBSURFACE CONDITIONS | BREIER, KRYSTINE E | 3645 | §102§103 | Non-Final OA | — | Pending | Jan 28, 2025 |
| 19038472 | DOWNHOLE NANO PARTICLE HEAT BLANKET FOR NEUTRON GENERATOR TUBES AND OTHER APPLICATIONS | GUTIERREZ, GISSELLE M | 2884 | §102§103 | Non-Final OA | — | Pending | Jan 27, 2025 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialHalliburton Energy Services Inc. has 185 pending office actions as of October 2026, spread across 54 art units and 125 examiners.
Kristyn A Hall has the most, with 6 of Halliburton Energy Services Inc.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.