Listed by the USPTO as SAETHER, FLEMMING
Tech Center 3700 • Art Units: 3675 3677 3726
This examiner grants 65% of resolved cases
SAETHER, FLEMMING works in tech center 3700 and art unit 3675. The record covers 1671 resolved cases, with a 65.2% allowance rate and a 27.8% interview lift. The median time to allowance is 1089 days. The extensive record makes these figures useful for portfolio planning, while the timing supports early attention to prosecution milestones.
Illinois Tool Works Inc., SIMPSON STRONG-TIE Company Inc., and Dtech Precision Industries Co. Ltd. are the leading companies. AKERMAN LLP, BACHMAN & LAPOINTE, P.C., and CKC & Partners Co., LLC are the leading firms. The interview lift supports a deliberate meeting strategy, particularly when claim scope or technical distinctions remain contested.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19071217 | Fastening System | Non-Final OA | Illinois Tool Works Inc. |
| 18404689 | Ergonomic Fastener for Quick Attachment | Non-Final OA | Illinois Tool Works Inc. |
| 18498397 | ROOFING FASTENER | Final Rejection | Illinois Tool Works Inc. |
| 18212527 | Quarter Turn Fastener | Non-Final OA | Illinois Tool Works Inc. |
| 18208778 | Stud Fastener System | Non-Final OA | Illinois Tool Works Inc. |
| 18202740 | Emblem Retainer | Non-Final OA | Illinois Tool Works Inc. |
| 18389596 | DIRECTIONAL WASHER AND METHOD OF USE | Non-Final OA | The Boeing Company |
| 18292248 | Rod Connector with Hollow Pin | Non-Final OA | Hilti Aktiengesellschaft |
| 19037449 | FASTENER ASSEMBLY | Final Rejection | BOMBARDIER RECREATIONAL PRODUCTS INC. |
| 19124123 | SCREW | Non-Final OA | Spax International GmbH & Co. KG |
| 18688944 | WASHER AND FASTENING STRUCTURE, AND METHOD OF RELEASING THEREOF | Final Rejection | NIPPON PLARAD CO. |
| 19102330 | SCREW FOR DIRECT SCREWING INTO A COMPONENT | Non-Final OA | EJOT SE & Co. KG |
| 18986946 | COUPLING DEVICE WITH SLIDING MECHANISM AND METHOD OF USE THEREOF | Non-Final OA | Spiral Master Corp. |
| 18466302 | MODULAR ADHESIVE ANCHOR SCREEN | Final Rejection | Simpson Strong-Tie Company Inc. |
| 18453577 | CONCRETE FASTENER | Final Rejection | Simpson Strong-Tie Company Inc. |
| 18453840 | SYSTEM FOR CENTERING RODS IN GLUED-IN-ROD STRUCTURES | Final Rejection | Simpson Strong-Tie Company Inc. |
| 18500056 | FASTENER FOR SERVER CABINET AND SERVER CABINET | Non-Final OA | Hebei Qinhuai Data Co., Limited. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy65.2% of resolved applications examined by Flemming Saether were allowed (1,671 resolved cases), compared with 64.3% across Art Unit 3675 over the last five years.
This examiner's interview lift is +27.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Flemming Saether took 1,089 days on average from filing to allowance.
Flemming Saether examines applications in Art Unit 3675 in Tech Center 3700 (Medical Devices & Mechanical Engineering).