Technology area: Medical Devices & Mechanical Engineering
28 pending office actions • 1 client • 25 examiners • 16 art units • 0 of 28 (0%) have an AI response strategy ready • 133 patents granted in the last 365 days
This profile has 30 pending office actions in Medical Devices & Mechanical Engineering. The broader record covers 74576 career applications, with a resolved allowance rate of 88.02% and an average of 3.15 office actions per allowance.
The pending matters indicate continuing prosecution activity in a mechanical technology classification. The allowance rate and office-action average provide useful context for assessing resolution prospects and response workload.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (4%) |
| §101 + other | 1 (4%) |
| §103 only | 15 (54%) |
| §102 only | 1 (4%) |
| §112 only | 1 (4%) |
| Multi-statute (no §101) | 9 (32%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| AMAR, MARC J | 3 | 75.2% | +37.9% |
| KANG, EDWIN G | 2 | 64.1% | +66.6% |
| DAVIS, JASON GREGORY | 1 | 74.2% | +18.2% |
| DAGENAIS, KRISTEN A | 1 | 64.0% | +19.8% |
| FIGUEROA, JOHN J | 1 | 83.3% | +8.7% |
| SUN, XIUQIN | 1 | 72.5% | +4.2% |
| NIMOX, RAYMOND LONDALE | 1 | 70.2% | +10.4% |
| MEILLER, SEAN V | 1 | 74.1% | +38.3% |
| KIM, SANG K | 1 | 81.5% | +10.3% |
| FOSTER, NICHOLAS L | 1 | 75.5% | +24.6% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | FIGUEROA, JOHN J | — |
| 18677543 | COOLING FEATURES FOR A COMPONENT OF A GAS TURBINE ENGINE | KIM, SANG K | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 8d overdue |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 12d |
| 18331699 | MULTI INSTRUMENT EGRESS FOR GAS TURBINE ENGINE | NAVARRO, HUGO IVAN | 35d |
| 19261583 | WEAR PAD FOR ROOT OF FAN BLADE | DAVIS, JASON GREGORY | — |
| 18765793 | MATERIAL FAILURE DETECTION FOR AIRCRAFT ENGINES USING NEUROMORPHIC SENSORS | SUN, XIUQIN | — |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | NIMOX, RAYMOND LONDALE | — |
| 18634181 | PISTON RING WITH INTEGRATED ANTI-ROTATION FEATURE | FOSTER, NICHOLAS L | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 12d |
| 19261583 | WEAR PAD FOR ROOT OF FAN BLADE | DAVIS, JASON GREGORY | — |
| 19036890 | COMPRESSOR BLEED SLOT DIFFUSER | AMAR, MARC J | — |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | DAGENAIS, KRISTEN A | — |
| 18927562 | MULTIPLE LOADS PATHS FOR VIBRATION MITIGATION AND IMPROVED TIP CLEARANCE IN TURBOFAN ENGINE | KANG, EDWIN G | — |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | NIMOX, RAYMOND LONDALE | — |
| 18761549 | PARTIAL EXIT CENTRIFUGAL COMPRESSOR | MEILLER, SEAN V | — |
| Client (Assignee) | Pending OAs |
|---|---|
| RTX | 28 |
| Art Unit | Apps |
|---|---|
| 3741 | 8 |
| 3745 | 5 |
| 2857 | 2 |
| 1717 | 1 |
| 1763 | 1 |
| 3675 | 1 |
| 3700 | 1 |
| 1784 | 1 |
| 2119 | 1 |
| 2884 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19261583 | WEAR PAD FOR ROOT OF FAN BLADE | Rtx Corporation | DAVIS, JASON GREGORY | 3745 | §102§103§112Other | Final Rejection | — | Pending | Jul 07, 2025 |
| 19036890 | COMPRESSOR BLEED SLOT DIFFUSER | Pratt & Whitney Canada Corp. | AMAR, MARC J | 3741 | §103 | Final Rejection | — | Pending | Jan 24, 2025 |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | Rtx Corporation | DAGENAIS, KRISTEN A | 1717 | §103 | Non-Final OA | — | Pending | Jan 23, 2025 |
| 18927562 | MULTIPLE LOADS PATHS FOR VIBRATION MITIGATION AND IMPROVED TIP CLEARANCE IN TURBOFAN ENGINE | Pratt & Whitney Canada Corp. | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | Rtx Corporation | FIGUEROA, JOHN J | 1763 | §102 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18765793 | MATERIAL FAILURE DETECTION FOR AIRCRAFT ENGINES USING NEUROMORPHIC SENSORS | Rtx Corporation | SUN, XIUQIN | 2857 | §101§103 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | Rtx Corporation | NIMOX, RAYMOND LONDALE | 2857 | §101 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18761549 | PARTIAL EXIT CENTRIFUGAL COMPRESSOR | Pratt & Whitney Canada Corp. | MEILLER, SEAN V | 3741 | §103 | Final Rejection | — | Pending | Jul 02, 2024 |
| 18677543 | COOLING FEATURES FOR A COMPONENT OF A GAS TURBINE ENGINE | Rtx Corporation | KIM, SANG K | 3745 | §103 | Non-Final OA | — | Pending | May 29, 2024 |
| 18634181 | PISTON RING WITH INTEGRATED ANTI-ROTATION FEATURE | Pratt & Whitney Canada Corp. | FOSTER, NICHOLAS L | 3675 | §102§103 | Non-Final OA | — | Pending | Apr 12, 2024 |
| 18441453 | GAS TURBINE ENGINE CONFIGURATION FOR CONTAINMENT TESTING | Pratt & Whitney Canada Corp. | WONG, ELTON K | 3745 | §103 | Final Rejection | — | Pending | Feb 14, 2024 |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | Rtx Corporation | WIEHE, NATHANIEL EDWARD | 3700 | §103§112 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18528989 | COMPRESSOR INNER AIR SEAL AND METHOD OF MAKING | Rtx Corporation | COLLISTER, ELIZABETH A | 1784 | §103§112 | Non-Final OA | — | Pending | Dec 05, 2023 |
| 18517615 | PISTON RING SEAL | Rtx Corporation | MCCAFFREY, KAYLA M | 3745 | §103 | Non-Final OA | — | Pending | Nov 22, 2023 |
| 18387534 | ADDITIVE MANUFACTURED COMPONENT INCLUDING WITNESS LINES | Rtx Corporation | KABIR, SAAD M | 2119 | §103 | Final Rejection | — | Pending | Nov 07, 2023 |
| 18492191 | COMPONENT CORROSION PROGNOSTICS USING COMPUTED TOMOGRAPHY (CT)-SCAN AND METHODS | Rtx Corporation | FAYE, MAMADOU | 2884 | §103 | Final Rejection | 25d overdue | Pending | Oct 23, 2023 |
| 18464792 | PROXIMITY MEASUREMENT BETWEEN SEAL ELEMENTS OF A GAS TURBINE ENGINE | Rtx Corporation | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | — | Pending | Sep 11, 2023 |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | Rtx Corporation | WEI, ZENGPU | 2197 | §103§112 | Non-Final OA | 8d overdue | Pending | Aug 07, 2023 |
| 18340740 | FAULT DETECTION AND LOAD MANAGEMENT IN A SERIES HYBRID PROPULSION SYSTEM | Rtx Corporation | LISOWSKI, JACEK | 3741 | §103 | Final Rejection | — | Pending | Jun 23, 2023 |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | Rtx Corporation | AMAR, MARC J | 3741 | §103§112 | Final Rejection | 12d | Pending | Jun 23, 2023 |
| 18331699 | MULTI INSTRUMENT EGRESS FOR GAS TURBINE ENGINE | Rtx Corporation | NAVARRO, HUGO IVAN | 2858 | §103§112 | Non-Final OA | 35d | Pending | Jun 08, 2023 |
| 18151939 | ENHANCED ENGINE MODEL FOR CONTROL AND HEALTH MONITORING | Rtx Corporation | DUGER, JASON H | 3741 | §112 | Non-Final OA | — | Pending | Jan 09, 2023 |
| 18083861 | GAS TURBINE ROTOR COMPONENT AND METHOD OF MANUFACTURE | Rtx Corporation | WALTERS, RYAN J | 3799 | §103 | Non-Final OA | — | Pending | Dec 19, 2022 |
| 18071138 | FINAL TAKEOFF SPEED DETERMINATION FOR AN AIRCRAFT | Rtx Corporation | ALKIRSH, AHMED | 3668 | §103 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 17881968 | COMPOSITE FAN BLADE AIRFOIL, METHODS OF MANUFACTURE THEREOF AND ARTICLES COMPRISING THE SAME | Rtx Corporation | HANDVILLE, BRIAN | 1783 | §103§112 | Non-Final OA | — | Pending | Aug 05, 2022 |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | Rtx Corporation | AMAR, MARC J | 3741 | §102§103§112 | Final Rejection | 8d overdue | Pending | Jan 27, 2022 |
| 16844683 | COOLING SYSTEM FOR A GAS TURBINE ENGINE | Rtx Corporation | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Apr 09, 2020 |
| 16723360 | REINFORCED CERAMIC MATRIX COMPOSITE AND METHOD OF MANUFACTURE | UNITED TECHNOLOGIES CORPORATION | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Dec 20, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial88.0% of resolved applications prosecuted by Cantor Colburn LLP - Pratt & Whitney were allowed, across 74,576 applications in USPTO records.
3.15 office actions per allowed application on average.
28 pending office actions as of October 2026, for 1 client, before 25 examiners in 16 art units.