Prosecution Insights
Last updated: May 29, 2026

Hoffman Warnick - GE Vernova

11 pending office actions • 2 clients • 11 examiners • 7 art units • 0 of 11 (0%) have an AI response strategy ready • 45 patents granted in the last 365 days

Portfolio Summary

11
Total Pending OAs
6
Non-Final OAs
3
Final Rejections
2
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 11 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

5
Overdue
0
Due this week
1
Due this month
2
Due in next 60 days
3
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 11 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (5)Due ≤ 30 days (1)Due ≤ 60 days (2)Due later (3)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

0
Hard (0%)
11
Medium (100%)
0
Easy (0%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only10 (91%)
§102 only1 (9%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

5
Life Sciences
45% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
6
Mechanical / Eng
55% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

110 h
Manual time on pending OAs
22 h
Time saved (low, 20%)
38 h
Time saved (mid, 35%)
1.0 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
REITZ, MICHAEL K. 1 70.0% +5.8%
WALTHOUR, SCOTT J 1 78.6% +69.1%
KRASNOW, NICHOLAS R 1 66.3% +12.2%
MEADE, LORNE EDWARD 1 50.4% +39.7%
KANG, EDWIN G 1 64.7% +69.0%
OMORI, MARY I 1 50.0% +58.6%
WU, JENNY R 1 63.2% +16.5%
SCHLEIS, DANIEL J 1 71.3% +5.1%
WANG, NICHOLAS A 1 53.9% +21.9%
BUI, ANDREW THANH 1 80.2% +11.1%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18052262 TURBINE NOZZLE OR BLADE WITH IMPINGEMENT COOLING STRUCTURE HAVING THERMAL FLEX ELEMENTS BUI, ANDREW THANH 2d overdue

Interview Candidates (8)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18399858 ADDITIVELY MANUFACTURED TAPERED TRANSITION PORTION AND AFT FRAME FOR REPLACEMENT OF EXISTING COMBUSTOR PARTS MEADE, LORNE EDWARD 66d overdue
19084526 ADDITIVELY MANUFACTURED COMBUSTOR BODY WITH RESONATING TUBE WALTHOUR, SCOTT J 30d overdue
18052262 TURBINE NOZZLE OR BLADE WITH IMPINGEMENT COOLING STRUCTURE HAVING THERMAL FLEX ELEMENTS BUI, ANDREW THANH 2d overdue
18399849 COMBUSTOR WITH ADJUSTABLE AIR FLOW FOR AXIAL FUEL STAGE INJECTOR AND HEAD END FUEL NOZZLE ASSEMBLY KANG, EDWIN G 14d
18118478 CORROSION PITTING RESISTANT MARTENSITIC STAINLESS STEEL AND METHOD FOR MAKING SAME WANG, NICHOLAS A 54d
18578197 ADDITIVE MANUFACTURING SYSTEM WITH PARTIALLY FLEXIBLE BUILD PLATFORM KRASNOW, NICHOLAS R 62d
18495814 METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT WU, JENNY R 68d
18495809 POROUS METAL COUPON WITH CONDUIT FOR REPAIRING COMPONENT, COMPONENT WITH SAME AND RELATED METHOD OMORI, MARY I 76d

Client Portfolio (2 clients)

Client (Assignee)Pending OAs
GE 8
GENERAL ELECTRIC COMPANY 3

Top Art Units

Art UnitApps
37413
37452
17842
17441
17331
17341
37001

Pending Office Actions

App #TitleClientExaminerArt UnitStatutesStatusDue inAIFiled
19227934 TURBINE BLADE UNDER-PLATFORM STRUCTURE AND POCKET GE Infrastructure Technology LLC REITZ, MICHAEL K. 3745 §102 Non-Final OA 4d overdue Pending Jun 04, 2025
19084526 ADDITIVELY MANUFACTURED COMBUSTOR BODY WITH RESONATING TUBE GE Infrastructure Technology LLC WALTHOUR, SCOTT J 3741 §103 Final Rejection 30d overdue Pending Mar 19, 2025
18578197 ADDITIVE MANUFACTURING SYSTEM WITH PARTIALLY FLEXIBLE BUILD PLATFORM GE Infrastructure Technology LLC KRASNOW, NICHOLAS R 1744 §103 Non-Final OA 62d Pending Jan 10, 2024
18399858 ADDITIVELY MANUFACTURED TAPERED TRANSITION PORTION AND AFT FRAME FOR REPLACEMENT OF EXISTING COMBUSTOR PARTS GE Infrastructure Technology LLC MEADE, LORNE EDWARD 3741 §103 Non-Final OA 66d overdue Pending Dec 29, 2023
18399849 COMBUSTOR WITH ADJUSTABLE AIR FLOW FOR AXIAL FUEL STAGE INJECTOR AND HEAD END FUEL NOZZLE ASSEMBLY GE Infrastructure Technology LLC KANG, EDWIN G 3741 §103 Final Rejection 14d Pending Dec 29, 2023
18495809 POROUS METAL COUPON WITH CONDUIT FOR REPAIRING COMPONENT, COMPONENT WITH SAME AND RELATED METHOD GE Infrastructure Technology LLC OMORI, MARY I 1784 §103 Non-Final OA 76d Pending Oct 27, 2023
18495814 METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT GE Infrastructure Technology LLC WU, JENNY R 1733 §103 Non-Final OA 68d Pending Oct 27, 2023
18495811 METAL POROUS COUPON WITH ANCHOR FOR COMPONENT AND COMPONENT WITH SAME GE Infrastructure Technology LLC SCHLEIS, DANIEL J 1784 §103 Non-Final OA 41d Pending Oct 27, 2023
18118478 CORROSION PITTING RESISTANT MARTENSITIC STAINLESS STEEL AND METHOD FOR MAKING SAME General Electric Company WANG, NICHOLAS A 1734 §103 Non-Final OA 54d Pending Mar 07, 2023
18052262 TURBINE NOZZLE OR BLADE WITH IMPINGEMENT COOLING STRUCTURE HAVING THERMAL FLEX ELEMENTS General Electric Company BUI, ANDREW THANH 3745 §103 Final Rejection 2d overdue Pending Nov 03, 2022
17490339 TOOL AND REPAIR METHOD FOR REMOVING A THERMAL BARRIER COATING General Electric Company TEIXEIRA MOFFAT, JONATHAN CHARLES 3700 §103 Non-Final OA 177d overdue Pending Sep 30, 2021

Managing Hoffman Warnick - GE Vernova's Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month