← Back to Arentfox Schiff, LLP And QUALCOMM, Incorporated
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18761123 | Untitled | Qualcomm Incorporated | ZHAO, WEI | 2479 | §102§103§112 | Final Rejection | — | Pending | |
| 19251742 | METHODS AND APPARATUS TO FACILITATE USING A STREAMING MANIFEST INCLUDING A PROFILE INDICATION | Qualcomm Incorporated | CHRISTENSEN, SCOTT B | 2447 | §101§112DP | Non-Final OA | — | Pending | Jun 26, 2025 |
| 19038624 | ENHANCED LINK ADAPTATION | Qualcomm Incorporated | JACKSON, JAYLUN ARMAN | 2112 | §103 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 18881228 | L1-RSRP CALCULATION SCHEME REPORT FOR BASE STATION-BASED BEAM PREDICTION | Qualcomm Incorporated | SHARMA, POONAM | §102§103§112 | Non-Final OA | — | Pending | Jan 03, 2025 | |
| 18881238 | METHODS FOR DISCOVERY AND SIGNALING PROCEDURE FOR CLUSTERED AND PEER-TO-PEER FEDERATED LEARNING | Qualcomm Incorporated | SHIN, KYUNG H | 2447 | §102§103 | Non-Final OA | — | Pending | Jan 03, 2025 |
| 18880171 | METHODS FOR DISCOVERY AND SIGNALING PROCEDURE FOR NETWORK-ASSISTED CLUSTERED FEDERATED LEARNING | Qualcomm Incorporated | CHAKRAVARTHY, LATHA | 2461 | §103 | Non-Final OA | — | Pending | Dec 30, 2024 |
| 18875693 | USER EQUIPMENT CONFIGURATION FOR DYNAMIC BASE STATION ANTENNA PORT ADAPTATION | Qualcomm Incorporated | LUGO, DAVID B | 2631 | §103 | Final Rejection | — | Pending | Dec 16, 2024 |
| 18874578 | QOS SPECIFIC BEAM PREDICTION | Qualcomm Incorporated | HAILE, AWET A | 2474 | §102§103§112 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18874561 | RADIO FREQUENCY IDENTIFICATION (RFID) DEVICE COMMUNICATIONS | Qualcomm Incorporated | MUNION, JAMES E | 2688 | §103 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18864345 | TECHNIQUES FOR CONFIGURING TRANSMISSION CONFIGURATION INDICATOR (TCI) STATES FOR MULTIPLE TRANSMISSION/RECEPTION POINTS | Qualcomm Incorporated | SAIFUDDIN, AHMED | 2475 | §103 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18842023 | DATA COLLECTION PROCEDURE AND MODEL TRAINING | Qualcomm Incorporated | CATTUNGAL, AJAY P | 2467 | §102§103 | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18842012 | DATA COLLECTION PROCEDURE AND MODEL TRAINING | Qualcomm Incorporated | SUN, DAVID ZHIJUN | 2418 | §102§103 | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18840473 | PDCCH MONITORING SKIPPING AT CORESET LEVEL | Qualcomm Incorporated | TRUONG, LAN-HUONG | 2464 | §102§103 | Non-Final OA | — | Pending | Aug 21, 2024 |
| 18837806 | TECHNIQUES FOR TRAINING DEVICES FOR MACHINE LEARNING-BASED CHANNEL STATE INFORMATION AND CHANNEL STATE FEEDBACK | Qualcomm Incorporated | ANDERSON, MARGARET MARIE | 2412 | §102§103 | Non-Final OA | — | Pending | Aug 12, 2024 |
| 18837845 | TECHNIQUES FOR COMMUNICATING SIDELINK SYNCHRONIZATION SIGNALS IN EXISTING WIRELESS COMMUNICATION DEPLOYMENTS | Qualcomm Incorporated | KHIRODHAR, MAHARISHI V | 2463 | §101§102§103 | Non-Final OA | — | Pending | Aug 12, 2024 |
| 18789119 | TECHNIQUES FOR FACILITATING CO-EXISTENCE OF RADIO ACCESS TECHNOLOGIES IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | ASHLEY, HUGH MARK | 2463 | §101DP | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18708199 | SWITCHING BETWEEN FLEXIBLE BANDWIDTH PARTS | Qualcomm Incorporated | FOLLANSBEE, KEITH TRAN-DANH | 2411 | §103 | Final Rejection | — | AI Ready | May 07, 2024 |
| 18653925 | ACKNOWLEDGMENT FEEDBACK FOR GROUPCAST OPTION 1 SIDELINK COMMUNICATION | Qualcomm Incorporated | NGUYEN, STEVEN H D | 2414 | §102§103 | Final Rejection | — | Pending | May 02, 2024 |
| 18622648 | 6G VIRTUAL CELL WITH DIFFERENT NUMEROLOGIES FOR DIFFERENT SUB-BANDS | Qualcomm Incorporated | OLALEYE, OLADIRAN GIDEON | 2472 | §103 | Final Rejection | — | AI Ready | Mar 29, 2024 |
| 18608708 | TECHNIQUES FOR RECYCLING ANTENNAS FOR MULTI-COMPONENT CARRIER (CC) OPERATIONS IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | KIM, CHONG G | 2443 | §102 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18602914 | SIDELINK CARRIER AGGREGATION SET-UP, ACTIVATION, AND DEACTIVATION | Qualcomm Incorporated | SUN, DAVID ZHIJUN | 2418 | §103 | Final Rejection | — | AI Ready | Mar 12, 2024 |
| 18593091 | TECHNIQUES FOR ENERGY-AWARE SCHEDULING IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | KIM, ANDREW CHANUL | 2472 | §103 | Final Rejection | — | AI Ready | Mar 01, 2024 |
| 18443201 | SBFD-AWARE UE BEHAVIOR IN SFI-FL SYMBOL WITH UL-SB | Qualcomm Incorporated | BETTENDORF, SAMUEL ROBERGE | 2414 | §103 | Final Rejection | — | AI Ready | Feb 15, 2024 |
| 18294511 | CSI-RS RESOURCE CONFIGURATION FOR CSI MEASUREMENT | Qualcomm Incorporated | TON, DANG T | 2476 | §102§103 | Non-Final OA | 37d overdue | AI Ready | Feb 01, 2024 |
| 18424429 | TECHNIQUES FOR ENABLING USER EQUIPMENT SENSING IN DOWNLINK SLOTS | Qualcomm Incorporated | HUYNH, NAM TRUNG | 2647 | §102§103 | Final Rejection | — | AI Ready | Jan 26, 2024 |
| 18412398 | POWER SAVING IN 802.11 DEVICES | Qualcomm Incorporated | DUONG, THAO DUC | 2446 | §103 | Final Rejection | 28d | AI Ready | Jan 12, 2024 |
| 18405489 | TECHNIQUES FOR ENHANCING RADIO LINK FAILURE RECOVERY | Qualcomm Incorporated | CERLANEK, ADAM JOEL | 2478 | §102 | Final Rejection | — | AI Ready | Jan 05, 2024 |
| 18567215 | METHOD AND APPARATUS TO AVOID NETWORK PRECODING ADJUSTMENT DURING BAND SHARING MSIM SCENARIOS | Qualcomm Incorporated | HUA, QUAN M | 2645 | §103 | Non-Final OA | 16d | AI Ready | Dec 05, 2023 |
| 18483804 | TECHNIQUES FOR CONFIGURING MULTIPLEXING OF UPLINK CONTROL INFORMATION IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | VANGAPATY, SRIHARSHA REDDY | 2475 | §103 | Non-Final OA | 29d | AI Ready | Oct 10, 2023 |
| 18554188 | A ROBUST RADIO LINK MONITORING METHOD | Qualcomm Incorporated | SAIFUDDIN, AHMED | 2475 | §103 | Non-Final OA | — | Pending | Oct 05, 2023 |
| 18468495 | RACH CONSIDERATIONS UNDER BEAM BASED SSB POWER FOR NETWORK ENERGY SAVING | Qualcomm Incorporated | IM, THEODORE | 2413 | §103 | Non-Final OA | — | AI Ready | Sep 15, 2023 |
| 18447841 | TIME-DIVISION DUPLEX (TDD) CARRIER AGGREGATION (CA) WITH NON-CELL DEFINING (NCD) SIGNALING | Qualcomm Incorporated | ZHAO, YONGHONG | 2472 | §103 | Non-Final OA | 5d | AI Ready | Aug 10, 2023 |
| 18365801 | EXTENDED WIRELESS SIGNAL PROCESSING | Qualcomm Incorporated | OH, ANDREW CHUNG SUK | 2466 | §103 | Final Rejection | 14d | AI Ready | Aug 04, 2023 |
| 18360774 | CSI REPORTING SUBBAND GRANULARITY CONFIGURATION IN FULL DUPLEXING | Qualcomm Incorporated | MENSAH, PRINCE AKWASI | 2474 | §102§103 | Non-Final OA | 28d | AI Ready | Jul 27, 2023 |
| 18273471 | TECHNIQUES FOR IMPLICIT PATHLOSS REFERENCE SIGNALING IN TRANSMISSION CONFIGURATION INDICATORS | Qualcomm Incorporated | KIM, SUN JONG | 2469 | §101§103 | Non-Final OA | 12d | AI Ready | Jul 20, 2023 |
| 18272984 | COMMON BEAM INDICATION/ACTIVATION FOR SEPARATE TCI LIST TO PHYSICAL CHANNELS | Qualcomm Incorporated | HUA, QUAN M | 2645 | §103 | Final Rejection | — | Pending | Jul 18, 2023 |
| 18306225 | TRANSMITTING FEEDBACK FOR REPETITIVE HARQ PROCESSES | Qualcomm Incorporated | PATIDAR, SUDESH M | 2415 | §103 | Final Rejection | — | Pending | Apr 24, 2023 |
| 18191837 | MULTIPLE PAYLOAD REGIONS | Qualcomm Incorporated | AGUREYEV, VLADISLAV Y | 2471 | §103 | Non-Final OA | — | Pending | Mar 28, 2023 |
| 18023237 | TRANSFERRING DATA SEGMENTS AFTER PERFORMING A RANDOM ACCESS CHANNEL (RACH) PROCEDURE | Qualcomm Incorporated | ACOLATSE, KODZOVI | 2478 | §103 | Non-Final OA | — | AI Ready | Feb 24, 2023 |
| 17924615 | UPLINK CONTROL INFORMATION (UCI) MULTIPLEXING FOR MULTI-SLOT PHYSICAL UPLINK SHARED CHANNEL (PUSCH) WITH TRANSPORT BLOCK SIZE (TBS) SCALING | Qualcomm Incorporated | MAK, RODRICK | 2416 | §103 | Final Rejection | — | AI Ready | Nov 10, 2022 |
| 17924240 | TECHNIQUES FOR CONFIGURING SUPPLEMENTARY UPLINK SUPPORT FOR HALF-DUPLEX FDD UE | Qualcomm Incorporated | VOLTAIRE, JEAN F | 2417 | §103 | Non-Final OA | — | Pending | Nov 09, 2022 |
| 18052891 | UPLINK GAP CONFIGURATION | Qualcomm Incorporated | SUGDEN, NOAH JAMES | 2475 | §103 | Non-Final OA | — | Pending | Nov 04, 2022 |
| 17914243 | POWER CONTROL FOR WIRELESS SENSING | Qualcomm Incorporated | HENSON, BRANDON JAMES | 3648 | §103 | Non-Final OA | 29d | AI Ready | Sep 23, 2022 |
| 17932580 | TECHNIQUES FOR COMMUNICATING A MULTI-PURPOSE WAKE-UP SIGNAL IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | KIM, WESLEY LEO | 2648 | §102§103 | Final Rejection | — | AI Ready | Sep 15, 2022 |
| 17797061 | REPETITION OF INFORMATION IN A TRANSMISSION BURST | Qualcomm Incorporated | KIM, ANDREW CHANUL | 2471 | §103 | Non-Final OA | — | AI Ready | Aug 02, 2022 |
| 17796393 | TECHNIQUES FOR PROVIDING AN ADAPTIVE CODING RATE IN WIRELESS COMMUNICATIONS | Qualcomm Incorporated | CHAKRAVARTHY, LATHA | 2461 | §102§103 | Non-Final OA | — | Pending | Jul 29, 2022 |
| 17759508 | SOUNDING REFERENCE SIGNAL CONFIGURATION FOR AT LEAST TWO TRANSMISSION/RECEPTION POINTS | Qualcomm Incorporated | SMITH, JOSHUA Y | 2477 | §103 | Final Rejection | — | Pending | Jul 26, 2022 |
| 17738887 | TECHNIQUES FOR REQUESTING MESSAGE REPETITION IN RANDOM ACCESS PROCEDURES | Qualcomm Incorporated | WASEL, SHIMA MOHAMED | 2475 | §103 | Non-Final OA | 26d | AI Ready | May 06, 2022 |
| 17451318 | METHOD AND APPARATUSES FOR ACCESSING UNLICENSED AND LICENSED FREQUENCY BANDS | Qualcomm Incorporated | HUYNH, CHUCK | 2644 | §103 | Final Rejection | — | AI Ready | Oct 18, 2021 |
| 16816404 | PRIORITIZING COLLIDING TRANSMISSIONS IN LTE AND ULTRA-LOW LATENCY LTE COMMUNICATIONS | Qualcomm Incorporated | THAI, CAMQUYEN | 2429 | §103 | Final Rejection | 29d | AI Ready | Mar 12, 2020 |
| 16812136 | TECHNIQUES FOR TRANSMISSION OF PATHLOSS REFERENCE SIGNAL IN A WIRELESS COMMUNICATION SYSTEM | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §103 | Non-Final OA | — | Pending | Mar 06, 2020 |
| 15456163 | TECHNIQUES FOR ADAPTIVE TRANSMISSIONS DURING URLLC | Qualcomm Incorporated | TACDIRAN, ANDRE GEE | 2415 | §103 | Non-Final OA | 8d overdue | AI Ready | Mar 10, 2017 |