Technology area: Semiconductors, Circuits & Optics
4 pending office actions • 2 art units • 4 examiners • 0 of 4 (0%) have an AI response strategy ready • 5 patents granted in the last 365 days
Aa Power Inc. is currently managing 5 pending office actions within the Semiconductors, Circuits & Optics technology area. These matters are spread across 5 distinct examiners, meaning every active action is being handled by a different individual. Despite this variety in personnel, the filings are concentrated within 2 distinct art units, suggesting a consistent technical focus for the portfolio. The 2 distinct art units indicate that the company's current research is focused on specific sub-sectors within the Semiconductors, Circuits & Optics field.
The busiest examiner, CHAN, DANNY, is responsible for 1 busiest examiner pending action. This indicates that the 5 pending office actions are distributed among the 5 distinct examiners without any concentration under this official. Practitioners must prepare for different sets of examiner habits while operating within the specific constraints of the 2 distinct art units identified in the data. Success across the 5 pending office actions will require a strategy that addresses the individual feedback of each assigned examiner.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| Double-patenting + other | 1 (25%) |
| Multi-statute (no §101) | 3 (75%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| CHAN, DANNY | 1 | 80.3% | +24.7% |
| TORRES-RIVERA, ALEX | 1 | 86.6% | +11.3% |
| MATEY, MICHAEL A | 1 | 79.9% | +18.3% |
| LIAN, MANG TIN BIK | 1 | 70.4% | +26.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18886630 | Multiple-Input Power Supply and Control Method | TORRES-RIVERA, ALEX | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18969684 | Power Architecture for Server and IT Equipment Rack | CHAN, DANNY | — |
| 18780728 | Power Supply with Passive Conductive and Convective Cooling | MATEY, MICHAEL A | — |
| 18242503 | Small Volume Transformer Structure | LIAN, MANG TIN BIK | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18969684 | Power Architecture for Server and IT Equipment Rack | CHAN, DANNY | — |
| 18886630 | Multiple-Input Power Supply and Control Method | TORRES-RIVERA, ALEX | — |
| 18780728 | Power Supply with Passive Conductive and Convective Cooling | MATEY, MICHAEL A | — |
| 18242503 | Small Volume Transformer Structure | LIAN, MANG TIN BIK | — |
| Art Unit | Apps |
|---|---|
| 2838 | 1 |
| 2835 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18969684 | Power Architecture for Server and IT Equipment Rack | CHAN, DANNY | — | §102§103§112Other | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18886630 | Multiple-Input Power Supply and Control Method | TORRES-RIVERA, ALEX | 2838 | §102§103DP | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18780728 | Power Supply with Passive Conductive and Convective Cooling | MATEY, MICHAEL A | 2835 | §102§103§112 | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18242503 | Small Volume Transformer Structure | LIAN, MANG TIN BIK | — | §102§103 | Non-Final OA | — | Pending | Sep 05, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial