Prosecution Insights
Last updated: August 15, 2026

BJ Energy Solutions, LLC

13 pending office actions • 6 art units • 11 examiners • 0 of 13 (0%) have an AI response strategy ready • 13 patents granted in the last 365 days

Portfolio Summary

13
Total Pending OAs
11
Non-Final OAs
2
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 8 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

1
Overdue
0
Due this week
3
Due this month
4
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 8 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (1)Due ≤ 30 days (3)Due ≤ 60 days (4)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

5
Hard (38%)
7
Medium (54%)
0
Easy (0%)
1
Unknown (8%)

Rejection Statute Mix

BucketCases
§101 only1 (8%)
§103 only6 (46%)
§102 only1 (8%)
Multi-statute (no §101)4 (31%)
No statute on record1 (8%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

1
Life Sciences
8% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
1
Semiconductors
8% of docket
11
Mechanical / Eng
85% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

130 h
Manual time on pending OAs
26 h
Time saved (low, 20%)
46 h
Time saved (mid, 35%)
1.1 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
BOBISH, CHRISTOPHER S 2 62.3% +28.7%
WOOD, DOUGLAS S 2 78.4% +11.4%
HARCOURT, BRAD 1 84.2% +5.2%
DOYLE, BENJAMIN C 1 68.3% +39.0%
BUCK, MATTHEW R 1 83.2% +14.6%
FREAY, CHARLES GRANT 1 77.0% +30.5%
KANG, EDWIN G 1 64.0% +67.8%
NG, HENRY 1 63.6% +58.2%
LUKS, JEREMY AUSTIN 1 73.6% +21.8%
JARIWALA, CHIRAG 1 62.1% +27.0%

Hard Cases (5)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 5 ordered by deadline are shown.

App #TitleExaminerDue in
19019118 HYDRAULIC FRACTURING ARRANGEMENT AND BLENDING SYSTEM BUCK, MATTHEW R 12d
18583488 SYSTEMS AND METHODS OF UTILIZATION OF A HYDRAULIC FRACTURING UNIT PROFILE TO OPERATE HYDRAULIC FRACTURING UNITS FREAY, CHARLES GRANT 28d
19046809 FLUID END ASSEMBLY DOYLE, BENJAMIN C 33d
19205841 STAGE PROFILES FOR OPERATIONS OF HYDRAULIC SYSTEMS AND ASSOCIATED METHODS HARCOURT, BRAD 36d
18517822 TURBINE ENGINE EXHAUST DUCT SYSTEM AND METHODS FOR NOISE DAMPENING AND ATTENUATION LUKS, JEREMY AUSTIN

Interview Candidates (11)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18945139 FUEL, COMMUNICATIONS, AND POWER CONNECTION SYSTEMS AND RELATED METHODS WOOD, DOUGLAS S 253d overdue
19019118 HYDRAULIC FRACTURING ARRANGEMENT AND BLENDING SYSTEM BUCK, MATTHEW R 12d
18583488 SYSTEMS AND METHODS OF UTILIZATION OF A HYDRAULIC FRACTURING UNIT PROFILE TO OPERATE HYDRAULIC FRACTURING UNITS FREAY, CHARLES GRANT 28d
19193832 HYDRAULIC FRACTURING PUMPS TO ENHANCE FLOW OF FRACTURING FLUID INTO WELLHEADS AND RELATED METHODS BOBISH, CHRISTOPHER S 30d
19046809 FLUID END ASSEMBLY DOYLE, BENJAMIN C 33d
18463950 POWER END FRAME ASSEMBLY JARIWALA, CHIRAG 36d
18523685 METHODS AND SYSTEMS FOR SUPPLYING FUEL TO GAS TURBINE ENGINES NG, HENRY 54d
19171058 SYSTEMS AND METHODS TO OPERATE HYDRAULIC FRACTURING UNITS USING AUTOMATIC FLOW RATE AND/OR PRESSURE CONTROL WOOD, DOUGLAS S

Top Art Units

Art UnitApps
3746 5
3672 3
3741 2
3674 1
2837 1
1700 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19205841 STAGE PROFILES FOR OPERATIONS OF HYDRAULIC SYSTEMS AND ASSOCIATED METHODS HARCOURT, BRAD 3674 §101 Non-Final OA 36d Pending May 12, 2025
19193832 HYDRAULIC FRACTURING PUMPS TO ENHANCE FLOW OF FRACTURING FLUID INTO WELLHEADS AND RELATED METHODS BOBISH, CHRISTOPHER S 3746 §103Other Non-Final OA 30d Pending Apr 29, 2025
19171058 SYSTEMS AND METHODS TO OPERATE HYDRAULIC FRACTURING UNITS USING AUTOMATIC FLOW RATE AND/OR PRESSURE CONTROL WOOD, DOUGLAS S 3672 §102Other Final Rejection Pending Apr 04, 2025
19046809 FLUID END ASSEMBLY DOYLE, BENJAMIN C 3746 §102§103 Non-Final OA 33d Pending Feb 06, 2025
19019118 HYDRAULIC FRACTURING ARRANGEMENT AND BLENDING SYSTEM BUCK, MATTHEW R 3672 §102§103Other Non-Final OA 12d Pending Jan 13, 2025
18945139 FUEL, COMMUNICATIONS, AND POWER CONNECTION SYSTEMS AND RELATED METHODS WOOD, DOUGLAS S 3672 Other Non-Final OA 253d overdue Pending Nov 12, 2024
18583488 SYSTEMS AND METHODS OF UTILIZATION OF A HYDRAULIC FRACTURING UNIT PROFILE TO OPERATE HYDRAULIC FRACTURING UNITS FREAY, CHARLES GRANT 3746 §102§103 Non-Final OA 28d Pending Feb 21, 2024
18396438 SYSTEMS AND METHODS UTILIZING TURBINE COMPRESSOR DISCHARGE FOR HYDROSTATIC MANIFOLD PURGE KANG, EDWIN G 3741 §103 Non-Final OA Pending Dec 26, 2023
18523685 METHODS AND SYSTEMS FOR SUPPLYING FUEL TO GAS TURBINE ENGINES NG, HENRY 3741 §103 Non-Final OA 54d Pending Nov 29, 2023
18517822 TURBINE ENGINE EXHAUST DUCT SYSTEM AND METHODS FOR NOISE DAMPENING AND ATTENUATION LUKS, JEREMY AUSTIN 2837 §102§103§112 Non-Final OA Pending Nov 22, 2023
18487865 HYDRAULIC FRACTURING PUMPS TO ENHANCE FLOW OF FRACTURING FLUID INTO WELLHEADS AND RELATED METHODS BOBISH, CHRISTOPHER S 3746 §103 Final Rejection Pending Oct 16, 2023
18463950 POWER END FRAME ASSEMBLY JARIWALA, CHIRAG 3746 §103 Non-Final OA 36d Pending Sep 08, 2023
18210282 MOBILE GAS TURBINE INLET AIR CONDITIONING SYSTEM AND ASSOCIATED METHODS ORLANDO, AMBER ROSE 1700 §103 Non-Final OA Pending Jun 15, 2023

Managing BJ Energy Solutions, LLC's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month