Prosecution Insights
Last updated: August 18, 2026

Bmic LLC

18 pending office actions • 9 art units • 15 examiners • 0 of 18 (0%) have an AI response strategy ready • 60 patents granted in the last 365 days

Portfolio Summary

18
Total Pending OAs
10
Non-Final OAs
7
Final Rejections
1
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

3
Overdue
0
Due this week
2
Due this month
0
Due in next 60 days
1
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (3)Due ≤ 30 days (2)Due later (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

8
Hard (44%)
8
Medium (44%)
1
Easy (6%)
1
Unknown (6%)

Rejection Statute Mix

BucketCases
§103 only8 (44%)
§112 only1 (6%)
Multi-statute (no §101)8 (44%)
No statute on record1 (6%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

9
Life Sciences
50% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
4
Mechanical / Eng
22% of docket
5
Business / Other
28% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

180 h
Manual time on pending OAs
36 h
Time saved (low, 20%)
63 h
Time saved (mid, 35%)
1.6 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
POLLEY, CHRISTOPHER M 2 73.0% +25.9%
KENNY, DANIEL J 2 61.8% +21.7%
CARLSON, KOURTNEY SALZMAN 2 44.6% +40.2%
GLESSNER, BRIAN E 1 36.4% +28.2%
SCHATZ, CHRISTOPHER T 1 62.2% +26.6%
KRUER, KEVIN R 1 26.9% +29.6%
MILLER, BETHANY MACKENZIE 1 54.7% +48.8%
AGUDELO, PAOLA 1 77.0% +16.8%
OMORI, MARY I 1 50.8% +58.7%
FISHER, AUDREY BARBARA 1 100.0% +0.0%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18624819 ROOFING SYSTEM INCLUDING ROOFING SHINGLE, AND ASSOCIATED METHOD FISHER, AUDREY BARBARA 77d overdue

Hard Cases (9)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18991163 FIRE-RESISTANT ADHESIVES AND RELATED SYSTEMS AND RELATED METHODS KRUER, KEVIN R 72d overdue
18113949 FASTENER SYSTEMS FOR ROOF STRUCTURES WALRAED-SULLIVAN, KYLE 28d
17894556 COVER BOARD WITH REINFORCING LAYER KENNY, DANIEL J 70d
19286801 ROOFING MATERIAL POLLEY, CHRISTOPHER M
19011311 ROOFING MEMBRANES WITH IMPROVED ADHESIVE BONDING STRENGTH SCHATZ, CHRISTOPHER T
19005798 ROOFING MATERIAL WITH PATTERNED ADHESIVE KENNY, DANIEL J
18760563 FIRE RESISTANT NON-BREATHABLE ROOFING UNDERLAYMENT AGUDELO, PAOLA
18315384 ROOF INTEGRATED SOLAR POWER SYSTEM WITH TOP MOUNTED ELECTRICAL COMPONENTS AND CABLES CARLSON, KOURTNEY SALZMAN

Interview Candidates (12)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18920144 MEMBRANES WITH IMPROVED SOLAR REFLECTANCE AND RELATED SYSTEMS AND METHODS MILLER, BETHANY MACKENZIE 85d overdue
18991163 FIRE-RESISTANT ADHESIVES AND RELATED SYSTEMS AND RELATED METHODS KRUER, KEVIN R 72d overdue
17894556 COVER BOARD WITH REINFORCING LAYER KENNY, DANIEL J 70d
19286801 ROOFING MATERIAL POLLEY, CHRISTOPHER M
19073841 INSULATION SYSTEM, AND ASSOCIATED ROOFING SYSTEM GLESSNER, BRIAN E
19011311 ROOFING MEMBRANES WITH IMPROVED ADHESIVE BONDING STRENGTH SCHATZ, CHRISTOPHER T
19005798 ROOFING MATERIAL WITH PATTERNED ADHESIVE KENNY, DANIEL J
18760563 FIRE RESISTANT NON-BREATHABLE ROOFING UNDERLAYMENT AGUDELO, PAOLA

Top Art Units

Art UnitApps
3633 2
1787 2
3635 2
1721 2
1746 1
1717 1
1732 1
1785 1
1789 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19286801 ROOFING MATERIAL POLLEY, CHRISTOPHER M §103§112 Non-Final OA Pending Jul 31, 2025
19073841 INSULATION SYSTEM, AND ASSOCIATED ROOFING SYSTEM GLESSNER, BRIAN E 3633 §103 Final Rejection Pending Mar 07, 2025
19011311 ROOFING MEMBRANES WITH IMPROVED ADHESIVE BONDING STRENGTH SCHATZ, CHRISTOPHER T 1746 §102§103 Non-Final OA Pending Jan 06, 2025
19005798 ROOFING MATERIAL WITH PATTERNED ADHESIVE KENNY, DANIEL J §102§103 Non-Final OA Pending Dec 30, 2024
18991163 FIRE-RESISTANT ADHESIVES AND RELATED SYSTEMS AND RELATED METHODS KRUER, KEVIN R 1787 §112 Final Rejection 72d overdue Pending Dec 20, 2024
18920144 MEMBRANES WITH IMPROVED SOLAR REFLECTANCE AND RELATED SYSTEMS AND METHODS MILLER, BETHANY MACKENZIE 1787 §103 Final Rejection 85d overdue Pending Oct 18, 2024
18760563 FIRE RESISTANT NON-BREATHABLE ROOFING UNDERLAYMENT AGUDELO, PAOLA §102§103§112Other Non-Final OA Pending Jul 01, 2024
18759245 BUILDING MATERIALS COMPRISING GRAPHENE AND RELATED METHODS OMORI, MARY I §103 Non-Final OA Pending Jun 28, 2024
18624819 ROOFING SYSTEM INCLUDING ROOFING SHINGLE, AND ASSOCIATED METHOD FISHER, AUDREY BARBARA 3635 §103 Final Rejection 77d overdue Pending Apr 02, 2024
18585922 WATER-CURABLE SILICONE COMPOSITIONS AND RELATED METHODS WALTERS JR, ROBERT S 1717 §103 Final Rejection Pending Feb 23, 2024
18402131 HARDENING ASPHALT FOR ROOFING APPLICATIONS SLIFKA, COLIN W 1732 Other Non-Final OA 30d Pending Jan 02, 2024
18506891 WATER-RESISTANT ACRYLIC COATINGS JOHNSTON, BRIEANN R §103 Non-Final OA Pending Nov 10, 2023
18382787 SYSTEMS AND METHODS OF FORMING ROOFING SHINGLES WITH APPLICATION OF A FIBERIZED ADHESIVE POLLEY, CHRISTOPHER M 1785 §103 Non-Final OA Pending Oct 23, 2023
18491188 ROOF INTEGRATED SOLAR POWER SYSTEM WITH TOP MOUNTED ELECTRICAL COMPONENTS AND CABLES CARLSON, KOURTNEY SALZMAN 1721 §103 Final Rejection Pending Oct 20, 2023
18315384 ROOF INTEGRATED SOLAR POWER SYSTEM WITH TOP MOUNTED ELECTRICAL COMPONENTS AND CABLES CARLSON, KOURTNEY SALZMAN 1721 §103§112 Final Rejection Pending May 10, 2023
18113949 FASTENER SYSTEMS FOR ROOF STRUCTURES WALRAED-SULLIVAN, KYLE 3635 §103§112 Non-Final OA 28d Pending Feb 24, 2023
17894556 COVER BOARD WITH REINFORCING LAYER KENNY, DANIEL J 3633 §102§103 Non-Final OA 70d Pending Aug 24, 2022
17873433 Roofing Materials With Improved Impact Resistance and Methods of Making Thereof PIZIALI, ANDREW T 1789 §102§103§112 Non-Final OA Pending Jul 26, 2022

Managing Bmic LLC's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month