Prosecution Insights
Last updated: October 02, 2026

Examiner: FUREMAN, JARED

Tech Center 2800 • Art Units: 1723 2836 2859 2876

This examiner grants 42% of resolved cases

Analysis

Jared Fureman works in Tech Center 2800 and Art Unit 1723. He has 114 resolved cases. The allowance rate pct is 42.1, which indicates a moderately difficult prosecution environment. The median days to allowance is 1189, suggesting that applications may require a standard period of time to reach a grant.

The interview lift pct is 20.7. This is a significant metric, as it shows a substantial increase in the probability of allowance following an interview compared to the base 42.1 allowance rate pct. Practitioners should consider the 20.7 interview lift pct as a primary strategy for advancing cases in Art Unit 1723.

With 114 resolved cases, the examiner's statistics provide a clear picture of his approach. The 1189 median days to allowance should be factored into long-term planning. Given the 42.1 allowance rate pct, applicants should be prepared for a thorough examination and use the 20.7 interview lift pct to resolve complex issues directly.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Performance Statistics

42.1%
Allow Rate
-25.9% vs TC avg
132
Total Applications
+20.7%
Interview Lift
1189
Avg Prosecution Days
Based on 114 resolved cases, 2023–2026

Rejection Statute Breakdown

0.6%
§101 Eligibility
24.4%
§102 Novelty
56.0%
§103 Obviousness
14.1%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18526470 ELECTRONIC DEVICE FOR CHARGING SERVICE USE DEVICE, AND OPERATION METHOD THEREFOR Non-Final OA Samsung Electronics Co., Ltd.
18455830 ELECTRIC VEHICLE CHARGING SYSTEM Non-Final OA SUBARU CORPORATION
18503338 Energy Storage System Non-Final OA ABB Schweiz AG
18435563 AIRCRAFT BATTERY CHARGING SYSTEM AND METHOD Non-Final OA Pratt & Whitney Canada Corp.
18425911 CONTROL APPARATUS AND VEHICLE Non-Final OA ISUZU MOTORS LIMITED
18343813 MODULAR AND FIELD UPGRADABLE INFRASTRUCTURE DEVICE SUCH AS ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE) FOR ELECTRIC VEHICLE (EV) CHARGING Non-Final OA Siemens Aktiengesellschaft
18137622 WATERCRAFT PROPULSION SYSTEM, WATERCRAFT, AND POWER SYSTEM Non-Final OA YAMAHA HATSUDOKI KABUSHIKI KAISHA
18398647 CHARGING AND SWAPPING SYSTEM WITH DETACHABLE BATTERY PACK Non-Final OA BYD COMPANY LIMITED
18140189 VEHICLE ELECTRICAL POWER APPARATUS Non-Final OA Consolidated Metco, Inc.
18353796 BATTERY CONTROL SYSTEM AND METHOD Non-Final OA Transportation IP Holdings, LLC
18539726 MULTI-STAGE CHARGING CONTROL Non-Final OA GM GLOBAL TECHNOLOGY OPERATIONS LLC
18471711 INDOOR CHARGER EQUIPMENT CROSS REFERENCE TO RELATED APPLICATIONS Non-Final OA GENERAL INTERFACE SOLUTION LIMITED

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month