Listed by the USPTO as HARM, NICKOLAS R
Tech Center 3600 • Art Units: 1700 1745 1746 1791 1795 3647
This examiner grants 80% of resolved cases
HARM, NICKOLAS R handles matters in USPTO Tech Center 3600 and Art Unit 1700. The record includes 801 resolved cases, with a 79.5% allowance rate and a median of 835 days to allowance. The interview lift is 5.9%, indicating a modest positive association.
The case volume supports using this profile as a meaningful reference when setting expectations, while the allowance rate still leaves a substantial role for application-specific claim strategy. Applicants should address the cited art with focused amendments and explanations that preserve meaningful scope. An interview may help resolve a defined issue, but the lift figure supports integrating it with, rather than substituting it for, a complete written response. The median duration suggests that prosecution planning should account for continued examination and sustained docket management.
Listed companies are The Boeing Company, Tokyo Electron Limited, and Brewer Science Inc. Listed firms are BakerHostetler, BENESCH, FRIEDLANDER, COPLAN & ARONOFF LLP, and Chrisman Gallo Tochtrop LLC.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18750050 | AUTOMATED TAPE LAYING MACHINE PANEL MANUFACTURE WITH GUARD BANDS | Final Rejection | The Boeing Company |
| 18822995 | SYSTEM AND METHOD OF MANUFACTURING ELECTRODES USING GRADIENT ROLLER SIZES | Non-Final OA | GM Global Technology Operations LLC |
| 18283560 | Method and Device for Manufacturing an Adherent Film Composite | Final Rejection | LTS Lohmann Therapie-Systeme AG |
| 18038222 | PRE-TREATMENT OF FIBERS FOR PRINTING | Final Rejection | Kornit Digital Ltd. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy79.5% of resolved applications examined by Nickolas R Harm were allowed (801 resolved cases), compared with 38.7% across Art Unit 1700 over the last five years.
This examiner's interview lift is +5.9 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Nickolas R Harm took 835 days on average from filing to allowance.
Nickolas R Harm examines applications in Art Unit 1700 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).