38 pending office actions • 20 art units • 33 examiners • 0 of 38 (0%) have an AI response strategy ready • 153 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 37 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 37 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (5%) |
| §103 only | 28 (74%) |
| §102 only | 1 (3%) |
| §112 only | 6 (16%) |
| No statute on record | 1 (3%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| CLARK, RYAN C | 2 | 87.4% | +8.6% |
| HAGHIGHIAN, BEHNOUSH | 2 | 79.2% | +13.1% |
| DELRUE, BRIAN CHRISTOPHER | 2 | 84.5% | +22.8% |
| KIM, TAE JUN | 2 | 64.0% | +26.2% |
| PAGE, HANA C | 2 | 60.2% | +31.2% |
| PHAM, CLINT V | 1 | 45.1% | +34.5% |
| RIBADENEYRA, THEODORE C | 1 | 88.8% | +9.7% |
| SEABE, JUSTIN D | 1 | 71.5% | +24.6% |
| LEGENDRE, CHRISTOPHER RYAN | 1 | 75.3% | +26.3% |
| GILLENWATERS, JACKSON N | 1 | 82.6% | +12.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18835676 | COMPOSITE VANE FOR AN AIRCRAFT TURBOMACHINE FAN COMPRISING MEANS FOR MEASURING INTERNAL DEFORMATIONS | DELRUE, BRIAN CHRISTOPHER | 5d overdue |
| 18863300 | AIRCRAFT TURBOMACHINE HAVING VARIABLE-PITCH PROPELLER VANES | GILLENWATERS, JACKSON N | 1d overdue |
| 18003403 | HOUSING FOR AN AIRCRAFT TURBOMACHINE AND METHOD FOR HOUSING MANUFACTURE | CLARK, RYAN C | 29d |
| 19113049 | SEALING DEVICE AND TURBOMACHINE COMPRISING THE SEALING DEVICE | CLARK, RYAN C | 30d |
| 18845543 | AERONAUTICAL THRUSTER | DELRUE, BRIAN CHRISTOPHER | 36d |
| 19103645 | POSITIONING OF A TURBOMACHINE AIR INTAKE PORT | RIBADENEYRA, THEODORE C | 42d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17604069 | MODEL RESETTING IN A TURBINE ENGINE | PIERRE LOUIS, ANDRE | 12d |
| 18033676 | METHOD FOR ASSESSING THE SERVICE LIFE OF A TURBINE ENGINE PART | LEE, SANGKYUNG | 75d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 16628641 | METHOD AND EQUIPMENT FOR PRODUCING A PART BY INJECTING RESIN INTO A WOVEN FIBRE PREFORM | PAGE, HANA C | 184d overdue |
| 18995677 | PROPELLER FOR AN AIRCRAFT TURBINE ENGINE | HAGHIGHIAN, BEHNOUSH | 31d overdue |
| 18874957 | BLADE WITH COMPOSITE STRUCTURE HAVING IMPROVED PLY DROP ORIENTATION | LEGENDRE, CHRISTOPHER RYAN | 28d overdue |
| 18577131 | AERONAUTICAL THRUSTER | KIM, TAE JUN | 15d overdue |
| 18835676 | COMPOSITE VANE FOR AN AIRCRAFT TURBOMACHINE FAN COMPRISING MEANS FOR MEASURING INTERNAL DEFORMATIONS | DELRUE, BRIAN CHRISTOPHER | 5d overdue |
| 18697839 | OUTLET NOZZLE PROVIDED WITH CHEVRONS FOR AERONAUTICAL THRUSTER | KIM, TAE JUN | 2d overdue |
| 18863300 | AIRCRAFT TURBOMACHINE HAVING VARIABLE-PITCH PROPELLER VANES | GILLENWATERS, JACKSON N | 1d overdue |
| 18293218 | PROPULSION UNIT FOR AN AIRCRAFT | HAGHIGHIAN, BEHNOUSH | 5d |
| Art Unit | Apps |
|---|---|
| 3745 | 13 |
| 1733 | 3 |
| 3711 | 2 |
| 3799 | 2 |
| 1745 | 2 |
| 3662 | 2 |
| 3663 | 1 |
| 3629 | 1 |
| 2857 | 1 |
| 1742 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19121796 | METHOD AND MODULE FOR DETECTING THE STATE OF A COUPLING DEVICE, AND ASSOCIATED TURBINE ENGINE AND AIRCRAFT | PHAM, CLINT V | 3663 | §103 | Non-Final OA | 14d | Pending | Apr 16, 2025 |
| 19113049 | SEALING DEVICE AND TURBOMACHINE COMPRISING THE SEALING DEVICE | CLARK, RYAN C | 3745 | §103 | Non-Final OA | 30d | Pending | Mar 19, 2025 |
| 19103645 | POSITIONING OF A TURBOMACHINE AIR INTAKE PORT | RIBADENEYRA, THEODORE C | 3745 | §103 | Non-Final OA | 42d | Pending | Feb 13, 2025 |
| 19101639 | ASSEMBLY COMPRISING A RING AND A PIVOTING SUPPORT SLEEVE FOR VARIABLE PITCH VANE ROOTS, TURBINE ENGINE PROVIDED WITH SUCH AN ASSEMBLY AND METHOD FOR DISMANTLING SUCH AN ASSEMBLY | SEABE, JUSTIN D | 3745 | §103 | Non-Final OA | 42d | Pending | Feb 06, 2025 |
| 18995677 | PROPELLER FOR AN AIRCRAFT TURBINE ENGINE | HAGHIGHIAN, BEHNOUSH | 3745 | §112 | Non-Final OA | 31d overdue | Pending | Jan 16, 2025 |
| 18293218 | PROPULSION UNIT FOR AN AIRCRAFT | HAGHIGHIAN, BEHNOUSH | 3745 | §112 | Non-Final OA | 5d | Pending | Dec 17, 2024 |
| 18874957 | BLADE WITH COMPOSITE STRUCTURE HAVING IMPROVED PLY DROP ORIENTATION | LEGENDRE, CHRISTOPHER RYAN | 3711 | Other | Non-Final OA | 28d overdue | Pending | Dec 13, 2024 |
| 18863300 | AIRCRAFT TURBOMACHINE HAVING VARIABLE-PITCH PROPELLER VANES | GILLENWATERS, JACKSON N | 3745 | §112 | Final Rejection | 1d overdue | Pending | Nov 05, 2024 |
| 18845543 | AERONAUTICAL THRUSTER | DELRUE, BRIAN CHRISTOPHER | 3745 | §103 | Final Rejection | 36d | Pending | Sep 10, 2024 |
| 18835676 | COMPOSITE VANE FOR AN AIRCRAFT TURBOMACHINE FAN COMPRISING MEANS FOR MEASURING INTERNAL DEFORMATIONS | DELRUE, BRIAN CHRISTOPHER | 3745 | §103 | Non-Final OA | 5d overdue | Pending | Aug 02, 2024 |
| 18833280 | TURBOMACHINE ASSEMBLY COMPRISING A HALF-SHELL CASING BEARING VARIABLE-PITCH INLET STATOR VANES | KIM, SANG K | 3745 | §103 | Final Rejection | 30d overdue | Pending | Jul 25, 2024 |
| 18708927 | METHOD FOR MONITORING CONFIGURATION OF AN AIRCRAFT ENGINE AND ASSOCIATED SYSTEM | ARAQUE JR, GERARDO | 3629 | §103 | Final Rejection | 14d | Pending | Jun 04, 2024 |
| 18709074 | REVERSIBLE HYDRAULIC PUMP FOR SETTING PROPELLOR PITCH, AND ASSOCIATED HYDRAULIC SYSTEM, TURBOPROP AND AIRCRAFT | ADJAGBE, MAXIME M | 3745 | §103 | Final Rejection | 23d | Pending | May 10, 2024 |
| 18706930 | LABYRINTH SEALING DEVICE FOR AN AIRCRAFT TURBOMACHINE | WONG, ELTON K | 3745 | §103 | Non-Final OA | 8d overdue | Pending | May 02, 2024 |
| 18697839 | OUTLET NOZZLE PROVIDED WITH CHEVRONS FOR AERONAUTICAL THRUSTER | KIM, TAE JUN | 3799 | §103 | Non-Final OA | 2d overdue | Pending | Apr 02, 2024 |
| 18695151 | MOVABLE RING ASSEMBLY FOR A TURBOMACHINE ROTOR | VERDIER, CHRISTOPHER M | 3745 | §112 | Final Rejection | 104d overdue | Pending | Mar 25, 2024 |
| 18577131 | AERONAUTICAL THRUSTER | KIM, TAE JUN | 3799 | §103 | Final Rejection | 15d overdue | Pending | Jan 05, 2024 |
| 18567885 | FIBROUS PREFORM FOR MANUFACTURING AN ANNULAR CASING MADE OF COMPOSITE MATERIAL FOR A TURBINE ENGINE | PAGE, HANA C | 1745 | §103 | Non-Final OA | 62d | Pending | Dec 07, 2023 |
| 18551822 | METHOD FOR MANUFACTURING A METAL ALLOY PART FOR A TURBINE ENGINE | MCGUTHRY BANKS, TIMA MICHELE | 1733 | §103 | Non-Final OA | 42d overdue | Pending | Sep 21, 2023 |
| 18551123 | MONITORING AN ANTI-LEAK VALVE IN A JET ENGINE | HUYNH, PHUONG | 2857 | §103 | Non-Final OA | 16d overdue | Pending | Sep 18, 2023 |
| 18272767 | METHOD FOR MANUFACTURING A PREFORM FOR A TURBOMACHINE COMPONENT AND INSTALLATION FOR WEAVING SUCH A PREFORM | DANIELS, MATTHEW J | 1742 | §103 | Non-Final OA | 29d overdue | Pending | Jul 17, 2023 |
| 18003403 | HOUSING FOR AN AIRCRAFT TURBOMACHINE AND METHOD FOR HOUSING MANUFACTURE | CLARK, RYAN C | 3745 | §103 | Final Rejection | 29d | Pending | Jun 02, 2023 |
| 18254752 | METHOD FOR AUTOMATICALLY SEARCHING FOR AT LEAST ONE TEXTILE PATTERN IN A COMPOSITE MATERIAL REINFORCEMENT | OSINSKI, MICHAEL S | 2674 | §102 | Non-Final OA | 9d overdue | Pending | May 26, 2023 |
| 18033676 | METHOD FOR ASSESSING THE SERVICE LIFE OF A TURBINE ENGINE PART | LEE, SANGKYUNG | 2858 | §101 | Non-Final OA | 75d | Pending | Apr 25, 2023 |
| 18247676 | DIAGNOSIS OF AN AIRCRAFT ENGINE CONTROL UNIT | HILGENDORF, DALE W | 3662 | §103 | Non-Final OA | 7d | Pending | Apr 03, 2023 |
| 18247011 | SYSTEM AND METHOD FOR REAL TIME CONTROL OF THE TRAJECTORY OF AN AIRCRAFT ON A RUNWAY | FABER, DAVID | 2172 | §112 | Non-Final OA | — | Pending | Mar 28, 2023 |
| 18245384 | ADDITIVE MANUFACTURING ON A TURBINE ENGINE PART BLANK INCLUDING A ROUGH AREA | PATEL, DEVANG R | 1735 | §103 | Non-Final OA | 27d | Pending | Mar 15, 2023 |
| 18004927 | ACARS REPORT COMMUNICATION SYSTEM | SHAHEED, KHALID W | 2643 | §112 | Non-Final OA | 35d overdue | Pending | Jan 10, 2023 |
| 18008906 | DEVICE FOR FILTERING COOLING AIR OF A TURBOMACHINE TURBINE | MCKENZIE, THOMAS B | 1776 | §103 | Non-Final OA | 66d overdue | Pending | Dec 07, 2022 |
| 17914179 | METHOD FOR MANUFACTURING A TITANIUM FIRE-RESISTANT METAL COMPONENT BY ADDITIVE MANUFACTURING | JANSSEN, REBECCA | 1733 | §103 | Final Rejection | 124d overdue | Pending | Sep 23, 2022 |
| 17907069 | METHOD FOR TREATING A SURFACE OF A METALLIC PART OF A TURBOMACHINE | HARRIS, BRITTANY SHARON | 1761 | §103 | Final Rejection | 28d overdue | Pending | Sep 22, 2022 |
| 17796389 | HOT ISOSTATIC PRESSING HEAT TREATMENT OF BARS MADE FROM TITANIUM ALUMINIDE ALLOY FOR LOW-PRESSURE TURBINE BLADES FOR A TURBOMACHINE | SU, XIAOWEI | 1733 | §103 | Non-Final OA | 15d | Pending | Jul 29, 2022 |
| 17755988 | DEVICE AND METHOD FOR MANAGING A FLEET OF INFORMATION-COMMUNICATING DEVICES FOR UPDATING A DIGITAL TWIN OF A TURBOMACHINE | SEOL, DAVIN | 3662 | §103 | Non-Final OA | 6d | Pending | May 13, 2022 |
| 17753072 | LASER METAL DEPOSITION SYSTEM | WUNDERLICH, ERWIN J | 3761 | §103 | Non-Final OA | 32d overdue | Pending | Feb 17, 2022 |
| 17624997 | METHOD FOR PRODUCING A PART FROM COMPOSITE MATERIAL BY INJECTING A FILLED SLIP INTO A FIBROUS TEXTURE | HEMINGWAY, TIMOTHY G | 1754 | §103 | Final Rejection | 33d | Pending | Jan 05, 2022 |
| 17604069 | MODEL RESETTING IN A TURBINE ENGINE | PIERRE LOUIS, ANDRE | 2187 | §101 | Non-Final OA | 12d | Pending | Oct 15, 2021 |
| 17273566 | MOVABLE BLADE | WOLCOTT, BRIAN P | 3711 | §103 | Non-Final OA | 89d overdue | Pending | Mar 04, 2021 |
| 16628641 | METHOD AND EQUIPMENT FOR PRODUCING A PART BY INJECTING RESIN INTO A WOVEN FIBRE PREFORM | PAGE, HANA C | 1745 | §103 | Non-Final OA | 184d overdue | Pending | Jan 03, 2020 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial