Listed by the USPTO as GAYE, SAMBA NMN
Tech Center 3700 • Art Units: 3763
This examiner grants 62% of resolved cases
GAYE, SAMBA NMN examines cases in Tech Center 3700, Art Unit 3763. The profile records 167 resolved cases and a 61.7% allowance rate, showing that allowance has occurred in a majority of the available matters. The median time to allowance is 1052 days, making timing a material consideration for prosecution budgets and portfolio scheduling.
The interview lift is 32.4%, indicating a substantial positive association with allowance outcomes. Practitioners may therefore consider an interview as an early component of strategy where technical distinctions or claim amendments would benefit from direct discussion. The listed companies are LG Electronics Inc., Haier US Appliance Solutions Inc., and Samsung Electronics Co., Ltd. The listed firms are KED & ASSOCIATES, LLP, Dority & Manning, P.A. and Haier US Appliance, and HARNESS DICKEY (DETROIT).
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19080092 | AIR CONDITIONER AND CONTROL METHOD THEREOF | Non-Final OA | Samsung Electronics Co., Ltd. |
| 18220442 | REFRIGERATOR AND CONTROL METHOD THEREOF | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 17949588 | REFRIGERATOR AND CONTROL METHOD THEREOF | Final Rejection | Samsung Electronics Co., Ltd. |
| 19202596 | REFRIGERATOR | Non-Final OA | LG ELECTRONICS INC. |
| 19065194 | REFRIGERATOR | Non-Final OA | LG Electronics Inc. |
| 18950645 | REFRIGERATOR | Final Rejection | LG ELECTRONICS INC. |
| 18939174 | REFRIGERATOR | Final Rejection | LG ELECTRONICS INC. |
| 18813691 | REFRIGERATOR | Final Rejection | LG ELECTRONICS INC. |
| 18596107 | REFRIGERATOR | Non-Final OA | LG ELECTRONICS INC. |
| 18442463 | REFRIGERATOR AND METHOD FOR CONTROLLING SAME | Final Rejection | LG ELECTRONICS INC. |
| 18401937 | OUTDOOR UNIT OF AIR CONDITIONER | Final Rejection | LG ELECTRONICS INC. |
| 18538053 | REFRIGERATOR AND CONTROL METHOD THEREFOR | Non-Final OA | LG ELECTRONICS INC. |
| 17622540 | REFRIGERATOR AND METHOD FOR CONTROLLING THE SAME | Non-Final OA | LG Electronics Inc. |
| 18488363 | AIR DRYER SYSTEM | Non-Final OA | Kia Corporation |
| 19079661 | AIR CONDITIONER | Non-Final OA | DENSO CORPORATION |
| 18946606 | INDOOR UNIT AND AIR CONDITIONER | Non-Final OA | Beijing Xiaomi Mobile Software Co., Ltd. |
| 18715538 | SYSTEM AND METHOD OF TEMPERATURE CONTROL IN AN AUTOMATED GRID BASED STORAGE AND RETRIEVAL SYSTEM | Final Rejection | Autostore Technology AS |
| 18379785 | LIQUID COOLING SYSTEM FOR AN ELECTRIC VEHICLE | Final Rejection | KUBOTA CORPORATION |
| 18995718 | COMPRESSOR SYSTEM FOR HEATING, VENTILATION, AIR CONDITIONING & REFRIGERATION SYSTEM | Non-Final OA | Tyco Fire & Security GmbH |
| 17973334 | System and Method of Monitoring Adiabatic Cooling Media | Non-Final OA | Ecolab USA Inc. |
| 19047949 | WATER SOURCE HEAT PUMP SYSTEM | Non-Final OA | Carrier Corporation |
| 19179116 | HOME APPLIANCE, PARTICULARLY COOLING DEVICE HAVING AT LEAST ONE AIR FLOW SYSTEM | Non-Final OA | BSH Hausgeräte GmbH |
| 18588096 | APPLIANCE WITH A CLEAR ICE MAKER AND ICE PRESS | Non-Final OA | BSH Hausgeräte GmbH |
| 18188220 | DUAL-COMPRESSOR VAPOR CYCLE SYSTEM | Final Rejection | Honeywell International Inc. |
| 19056836 | REFRIGERATOR APPLIANCE INCLUDING MULTIPLE IN-DOOR ICE MAKERS | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18657265 | METHOD OF OPERATING AN ICEMAKER OF A REFRIGERATOR APPLIANCE | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18519838 | WATER SUPPLY SYSTEM FOR A REFRIGERATOR | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18512385 | REFRIGERATOR APPLIANCE AND ICE CLUMPING PREVENTION | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18339518 | REFRIGERATOR APPLIANCE AND WATER FILTER ASSEMBLY | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18975454 | AIR CONDITIONER AND METHOD OF CONTROLLING WATER INJECTION MODULE OF AIR CONDITIONER | Non-Final OA | KYUNGDONG NAVIEN CO., LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy61.7% of resolved applications examined by Samba Nmn Gaye were allowed (167 resolved cases), compared with 60.5% across Art Unit 3763 over the last five years.
This examiner's interview lift is +32.4 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Samba Nmn Gaye took 1,052 days on average from filing to allowance.
Samba Nmn Gaye examines applications in Art Unit 3763 in Tech Center 3700 (Medical Devices & Mechanical Engineering).