Listed by the USPTO as TRAVERS, MATTHEW P
Tech Center 3700 • Art Units: 1784 3635 3722 3724 3725 3726 3763
This examiner grants 64% of resolved cases
TRAVERS, MATTHEW P is assigned to Tech Center 3700 and Art Unit 1784, with 674 resolved cases. The allowance rate is 63.5%, and the median time to allowance is 970 days. The record provides substantial experience data and indicates a moderate allowance outcome. Applicants should combine realistic timing expectations with claim drafting that identifies the strongest technical distinctions before the first substantive response.
The interview lift is 43.3%, showing a material association with improved results. Counsel may therefore give interviews a meaningful role in prosecution, especially when a concise technical explanation can separate the claims from the cited art. The listed companies are Black & Decker Inc., Altria Client Services LLC, and Stryker Corporation. The listed firms are Harness, Dickey & Pierce-Altria, Anglehart et al., and CARLSON, GASKEY & OLDS, P.C.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19242868 | IMPLANT DELIVERY DEVICES AND METHODS OF MAKING THE SAME | Non-Final OA | STRYKER EUROPEAN OPERATIONS LIMITED |
| 18467999 | POWER TOOL | Non-Final OA | BLACK & DECKER INC. |
| 18461456 | MASK FORMING SYSTEM FOR PROTECTING A STRUCTURE AND A METHOD OF FORMING A MASK FOR THE SAME | Non-Final OA | The Boeing Company |
| 18921575 | PROCESSING APPARATUS OF TRUNK LID HINGE ARM, PROCESSING METHOD OF TRUNK LID HINGE ARM, AND TRUNK LID HINGE ARM | Final Rejection | KIA CORPORATION |
| 18886695 | METHOD OF MAKING HEAT EXCHANGER | Non-Final OA | RTX Corporation |
| 19289600 | COMPOSITE SHAFT WITH OUTER PERIPHERY RING | Final Rejection | Goodrich Corporation |
| 19016254 | SLEEVED ROCKER SHAFT FOR TYPE III HEAVY DUTY VALVE TRAIN | Final Rejection | EATON INTELLIGENT POWER LIMITED |
| 18290014 | MACHINING CONDITION MANAGEMENT SYSTEM, MACHINING CONTROL DEVICE, MACHINING SYSTEM, AND MACHINING PROGRAM | Final Rejection | Sumitomo Electric Industries, Ltd. |
| 17918376 | MACHINING METHOD FOR WORKPIECE | Non-Final OA | FANUC CORPORATION |
| 19193861 | A MULTI-PURPOSE EXTRACTION TOOL | Final Rejection | The Sollami Company |
| 19280597 | APPARATUS AND METHOD FOR ASSEMBLING A HEATER ASSEMBLY FOR A NICOTINE POD ASSEMBLY | Non-Final OA | Altria Client Services LLC |
| 18815620 | CABLE ABNORMALITY DETECTION SYSTEM AND METHOD | Non-Final OA | DISH Wireless L.L.C. |
| 18497550 | CUTTING TOOL AND TOOL BODY THEREOF | Final Rejection | TUNGALOY CORPORATION |
| 18111418 | JOINING DEVICE FOR JOINING COMPONENTS ON A SHAFT | Non-Final OA | MAHLE International GmbH |
| 18049660 | METHOD OF INTERFACE SURFACE PREPARATION FOR COATED STEEL ENABLING LASER WELD OR LASER BRAZED ASSEMBLY | Non-Final OA | GM Global Technology Operations LLC |
| 18588250 | ATRAUMATIC TIP ASSEMBLY FOR GUIDEWIRE | Final Rejection | Acclarent, Inc. |
| 18793591 | CRITTER STOPS | Final Rejection | Individual inventor |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy63.5% of resolved applications examined by Matthew P Travers were allowed (674 resolved cases), compared with 56.8% across Art Unit 1784 over the last five years.
This examiner's interview lift is +43.3 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Matthew P Travers took 970 days on average from filing to allowance.
Matthew P Travers examines applications in Art Unit 1784 in Tech Center 3700 (Medical Devices & Mechanical Engineering).