13 pending office actions • 11 art units • 13 examiners • 0 of 13 (0%) have an AI response strategy ready • 25 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 13 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 13 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 10 (77%) |
| §102 only | 1 (8%) |
| §112 only | 2 (15%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LOWE, MICHAEL S | 1 | 66.5% | +20.3% |
| JEBARI, MOHAMMED | 1 | 55.2% | +17.0% |
| LEE, TYLER J | 1 | 92.0% | +6.8% |
| FREJD, RUSSELL WARREN | 1 | 91.3% | +7.4% |
| KINGSLAND, KYLE J | 1 | 78.3% | +6.0% |
| FLUHART, STACEY A | 1 | 82.7% | +13.9% |
| BURKMAN, JESSICA LYNN | 1 | 81.9% | +18.0% |
| WILENSKY, MOSHE K | 1 | 75.3% | +15.6% |
| HARCOURT, BRAD | 1 | 84.1% | +5.6% |
| MOSCOLA, MATTHEW JOHN | 1 | 65.7% | +16.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18456992 | LIFT ARM ARRANGEMENTS FOR POWER MACHINES | BURKMAN, JESSICA LYNN | 60d overdue |
| 18365584 | SYSTEMS AND METHODS FOR ELECTRICALLY POWERED MOWERS | HARCOURT, BRAD | 44d overdue |
| 18816919 | MOTOR CONTROL FOR ELECTRICALLY POWERED POWER MACHINE | LEE, TYLER J | 17d overdue |
| 18601391 | POWER SYSTEM ASSEMBLY FOR A POWER MACHINE | FLUHART, STACEY A | 1d overdue |
| 18767588 | SYSTEMS AND METHODS OF PERFORMING IMPLEMENT LEVELING OPERATIONS WITH A POWER MACHINE | FREJD, RUSSELL WARREN | 62d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18303275 | PATH PLANNING FOR AUTOMATIC MOWERS | MOSCOLA, MATTHEW JOHN | 103d overdue |
| 18456992 | LIFT ARM ARRANGEMENTS FOR POWER MACHINES | BURKMAN, JESSICA LYNN | 60d overdue |
| 18457011 | FRAMES FOR POWER MACHINES | WILENSKY, MOSHE K | 45d overdue |
| 18887769 | POWER AND MACHINE DISPLAY | JEBARI, MOHAMMED | 26d overdue |
| 18960516 | LIFT ARM ARRANGEMENTS FOR POWER MACHINES | LOWE, MICHAEL S | 15d overdue |
| 18601391 | POWER SYSTEM ASSEMBLY FOR A POWER MACHINE | FLUHART, STACEY A | 1d overdue |
| Art Unit | Apps |
|---|---|
| 3663 | 3 |
| 3652 | 1 |
| 2482 | 1 |
| 3661 | 1 |
| 3655 | 1 |
| 3653 | 1 |
| 3726 | 1 |
| 3674 | 1 |
| 3667 | 1 |
| 3611 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18960516 | LIFT ARM ARRANGEMENTS FOR POWER MACHINES | LOWE, MICHAEL S | 3652 | §103 | Non-Final OA | 15d overdue | Pending | Nov 26, 2024 |
| 18887769 | POWER AND MACHINE DISPLAY | JEBARI, MOHAMMED | 2482 | §103 | Final Rejection | 26d overdue | Pending | Sep 17, 2024 |
| 18816919 | MOTOR CONTROL FOR ELECTRICALLY POWERED POWER MACHINE | LEE, TYLER J | 3663 | §103 | Non-Final OA | 17d overdue | Pending | Aug 27, 2024 |
| 18767588 | SYSTEMS AND METHODS OF PERFORMING IMPLEMENT LEVELING OPERATIONS WITH A POWER MACHINE | FREJD, RUSSELL WARREN | 3661 | §102 | Non-Final OA | 62d | Pending | Jul 09, 2024 |
| 18660497 | HIGH VOLTAGE INTERLOCK LOOP FOR ELECTRIC IMPLEMENTS OF POWER MACHINES | KINGSLAND, KYLE J | 3663 | §103 | Non-Final OA | 26d | Pending | May 10, 2024 |
| 18601391 | POWER SYSTEM ASSEMBLY FOR A POWER MACHINE | FLUHART, STACEY A | 3655 | §112 | Non-Final OA | 1d overdue | Pending | Mar 11, 2024 |
| 18456992 | LIFT ARM ARRANGEMENTS FOR POWER MACHINES | BURKMAN, JESSICA LYNN | 3653 | §112 | Final Rejection | 60d overdue | Pending | Aug 28, 2023 |
| 18457011 | FRAMES FOR POWER MACHINES | WILENSKY, MOSHE K | 3726 | §103 | Non-Final OA | 45d overdue | Pending | Aug 28, 2023 |
| 18365584 | SYSTEMS AND METHODS FOR ELECTRICALLY POWERED MOWERS | HARCOURT, BRAD | 3674 | §103 | Non-Final OA | 44d overdue | Pending | Aug 04, 2023 |
| 18303275 | PATH PLANNING FOR AUTOMATIC MOWERS | MOSCOLA, MATTHEW JOHN | 3663 | §103 | Final Rejection | 103d overdue | Pending | Apr 19, 2023 |
| 17868186 | SYSTEMS AND METHODS FOR OBSTACLE DETECTION FOR A POWER MACHINE | ARTIMEZ, DANA FERREN | 3667 | §103 | Non-Final OA | 3d overdue | Pending | Jul 19, 2022 |
| 17867197 | TRACK ASSEMBLY FOR POWER MACHINE | WEHRLY, CHRISTOPHER B | 3611 | §103 | Final Rejection | 31d overdue | Pending | Jul 18, 2022 |
| 17706074 | VISUAL INDICATION SYSTEM FOR POWER MACHINES | YANG, JAMES J | 2686 | §103 | Final Rejection | 27d | Pending | Mar 28, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial