18 pending office actions • 9 art units • 18 examiners • 0 of 18 (0%) have an AI response strategy ready • 36 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (6%) |
| §103 only | 8 (44%) |
| §102 only | 1 (6%) |
| §112 only | 2 (11%) |
| Double-patenting only | 1 (6%) |
| Multi-statute (no §101) | 5 (28%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PATEL, JIGAR P | 1 | 80.0% | +16.6% |
| ROSARIO, NELSON M | 1 | 86.0% | +6.2% |
| LAMBERT, DAVID W | 1 | 76.5% | +12.7% |
| HOQUE, FARHANA AKHTER | 1 | 86.0% | +11.2% |
| GARFT, CHRISTOPHER | 1 | 59.1% | +23.1% |
| WILLIAMS, REBECCA COLETTE | 1 | 40.0% | +66.7% |
| CORS, NATHAN M | 1 | 77.8% | +5.2% |
| ESTRADA, ANGEL R | 1 | 85.5% | -43.6% |
| KAULFUSS, PETER LLOYD | 1 | — | — |
| HOLLWEG, THOMAS A | 1 | 53.1% | +31.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19268280 | INFRASTRUCTURE MANAGEMENT SYSTEM AND METHOD | PATEL, JIGAR P | — |
| 19059581 | OPTICAL INTERCONNECTION MODULES FOR AI NETWORKS | ROSARIO, NELSON M | — |
| 18928489 | METHOD OF DETECTING A FAULT IN A PULSED POWER DISTRIBUTION SYSTEM | HOQUE, FARHANA AKHTER | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18886513 | COMMUNICATION CABLES WITH ELECTRICAL AND OPTICAL LANES | ESTRADA, ANGEL R | — |
| 18791591 | Fiber Cassette Base Housing Including Multiple Connectivity Options | KAULFUSS, PETER LLOYD | — |
| 18783674 | SPLICE ENCLOSURES AND SLACK MANAGEMENT FOR FIBER OPTIC PEDESTALS | HOLLWEG, THOMAS A | — |
| 18605100 | Fault Detection and Management Scheme for Safe HV-DC Power Distribution System | LE, JOHN H | — |
| 18371628 | METHOD AND DEVICE FOR DETECTING THE ABSENCE OF VOLTAGE | NIMOX, RAYMOND LONDALE | — |
| 17981776 | Cable Tie Handle | NGUYEN, BAO-THIEU L | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19268280 | INFRASTRUCTURE MANAGEMENT SYSTEM AND METHOD | PATEL, JIGAR P | — |
| 18937168 | COLOR CODED CABLING FOR A.I. DRIVEN OPTICAL NETWORKS | LAMBERT, DAVID W | — |
| 18928489 | METHOD OF DETECTING A FAULT IN A PULSED POWER DISTRIBUTION SYSTEM | HOQUE, FARHANA AKHTER | — |
| 18915689 | CABLE GUIDE CLAMP | GARFT, CHRISTOPHER | — |
| 18894239 | Methods, Apparatuses, and Systems for Cleaning, Tracing, and Securing Fibers in Communication Networks | WILLIAMS, REBECCA COLETTE | — |
| 18783674 | SPLICE ENCLOSURES AND SLACK MANAGEMENT FOR FIBER OPTIC PEDESTALS | HOLLWEG, THOMAS A | — |
| Art Unit | Apps |
|---|---|
| 2874 | 3 |
| 2634 | 1 |
| 3632 | 1 |
| 2677 | 1 |
| 3613 | 1 |
| 2835 | 1 |
| 2831 | 1 |
| 2857 | 1 |
| 3732 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19268280 | INFRASTRUCTURE MANAGEMENT SYSTEM AND METHOD | PATEL, JIGAR P | — | §103Other | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19059581 | OPTICAL INTERCONNECTION MODULES FOR AI NETWORKS | ROSARIO, NELSON M | — | §103 | Non-Final OA | — | Pending | Feb 21, 2025 |
| 18937168 | COLOR CODED CABLING FOR A.I. DRIVEN OPTICAL NETWORKS | LAMBERT, DAVID W | 2634 | §112 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18928489 | METHOD OF DETECTING A FAULT IN A PULSED POWER DISTRIBUTION SYSTEM | HOQUE, FARHANA AKHTER | — | §102 | Non-Final OA | — | Pending | Oct 28, 2024 |
| 18915689 | CABLE GUIDE CLAMP | GARFT, CHRISTOPHER | 3632 | §103 | Non-Final OA | — | Pending | Oct 15, 2024 |
| 18894239 | Methods, Apparatuses, and Systems for Cleaning, Tracing, and Securing Fibers in Communication Networks | WILLIAMS, REBECCA COLETTE | 2677 | §103 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18886232 | Methods for Estimating Modal Bandwidth Spectral Dependence | CORS, NATHAN M | — | DP | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18886513 | COMMUNICATION CABLES WITH ELECTRICAL AND OPTICAL LANES | ESTRADA, ANGEL R | — | §102§103 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18791591 | Fiber Cassette Base Housing Including Multiple Connectivity Options | KAULFUSS, PETER LLOYD | 2874 | §102§103§112 | Non-Final OA | — | Pending | Aug 01, 2024 |
| 18783674 | SPLICE ENCLOSURES AND SLACK MANAGEMENT FOR FIBER OPTIC PEDESTALS | HOLLWEG, THOMAS A | — | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18645762 | MULTILAYER INTERFACE FIBER OPTIC CASSETTE MODULE | JORDAN, ANDREW | 2874 | §103 | Final Rejection | — | Pending | Apr 25, 2024 |
| 18613253 | TRANSPORT CASTER ASSEMBLY FOR A DATA CENTER CABINET | SHRIVER II, JAMES A | 3613 | §103 | Non-Final OA | — | Pending | Mar 22, 2024 |
| 18605100 | Fault Detection and Management Scheme for Safe HV-DC Power Distribution System | LE, JOHN H | — | §101 | Non-Final OA | — | Pending | Mar 14, 2024 |
| 18538534 | MODULAR AND SCALABLE POWER DISTRIBUTION | SMITH, COURTNEY L | 2835 | §112 | Final Rejection | 15d overdue | Pending | Dec 13, 2023 |
| 18385122 | INSULATION PIERCING SPLIT BOLT ASSEMBLY | FIGUEROA, FELIX O | 2831 | §103 | Final Rejection | — | Pending | Oct 30, 2023 |
| 18371628 | METHOD AND DEVICE FOR DETECTING THE ABSENCE OF VOLTAGE | NIMOX, RAYMOND LONDALE | 2857 | §102§103 | Non-Final OA | — | Pending | Sep 22, 2023 |
| 18106136 | Ultra-Wideband Low Latency Multicore to Multicore Free-Space Optical Communications Using Parabolic Mirrors | CHIEM, DINH D | 2874 | §103 | Final Rejection | 28d overdue | Pending | Feb 06, 2023 |
| 17981776 | Cable Tie Handle | NGUYEN, BAO-THIEU L | 3732 | §103§112 | Non-Final OA | — | Pending | Nov 07, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial