Prosecution Insights
Last updated: October 01, 2026

Siemens Gamesa Renewable Energy S.A.

Technology areas: Chemistry & Materials • Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering

35 pending office actions • 15 art units • 34 examiners • 0 of 35 (0%) have an AI response strategy ready • 59 patents granted in the last 365 days

Analysis

Siemens Gamesa Renewable Energy S.A. is managing 35 pending office actions in the Medical Devices & Mechanical Engineering technology area. These actions are distributed among 34 distinct examiners and 15 distinct art units, indicating a high degree of technical variety and a decentralized prosecution environment. The ratio of 35 actions to 34 examiners suggests that almost every action is reviewed by a different person.

BURRELL, KATELYNNE RUTH is the busiest examiner for the company, overseeing 2 pending office actions. With 35 total pending office actions in 15 distinct art units, the company's mechanical engineering innovations are being reviewed by many different specialized groups at the USPTO. This requires a prosecution strategy that can adapt to the individual styles of 34 different examiners while addressing the specific requirements of 15 different art units. The decentralized nature of the portfolio means that the legal team must handle each case as a unique interaction with limited opportunities for examiner-specific concentration.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

35
Total Pending OAs
22
Non-Final OAs
10
Final Rejections
3
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 11 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

6
Overdue
0
Due this week
2
Due this month
2
Due in next 60 days
1
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 11 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (6)Due ≤ 30 days (2)Due ≤ 60 days (2)Due later (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

23
Hard (66%)
10
Medium (29%)
2
Easy (6%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 only1 (3%)
§101 + other3 (9%)
§103 only10 (29%)
§112 only2 (6%)
Multi-statute (no §101)19 (54%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

5
Life Sciences
14% of docket
1
Information Tech
3% of docket
2
Communications
6% of docket
5
Semiconductors
14% of docket
11
Mechanical / Eng
31% of docket
11
Business / Other
31% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

350 h
Manual time on pending OAs
70 h
Time saved (low, 20%)
122 h
Time saved (mid, 35%)
3.1 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
BURRELL, KATELYNNE RUTH 2 56.5% -0.4%
WONG, ELTON K 1 78.1% +19.1%
FLORES, JUAN G 1 79.5% +14.5%
KIM, SANG K 1 81.4% +10.3%
ORTEGA, JOSEPH 1 72.7% +15.9%
BEATTY, TY MITCHELL 1 69.7% +43.3%
HARRISON, MICHAEL A 1 88.9% +2.7%
AHADI, ELIA 1 — —
GOLIK, ARTHUR PAUL 1 69.9% +45.3%
DARNELL, BAILEIGH K 1 70.2% +26.2%

Hard Cases (23)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18556464 MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS NIMOX, RAYMOND LONDALE 49d overdue
19110461 DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION ORTEGA, JOSEPH 9d overdue
18011871 LIFTING APPARATUS FOR A LIFTING CRANE QURESHI, REHMAN AHMED 5d overdue
18411283 PERFORMING DEFORMATION ANALYSIS OF A WIND TURBINE BLADE SHABMAN, MARK A 13d
18864673 METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT DARNELL, BAILEIGH K 14d
18694832 WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE FISHER, WESLEY LE 34d
18716688 DAMPING DEVICE HERRING, BRENT W 60d
18563830 ESTIMATING A SEA STATE OF AN OFFSHORE WIND TURBINE HAYES, JOVON E 82d

Interview Candidates (7)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.

App #TitleExaminerDue in
19110461 DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION ORTEGA, JOSEPH 9d overdue
18864673 METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT DARNELL, BAILEIGH K 14d
19489813 Connector assembly WONG, ELTON K —
19477851 METHOD FOR MANUFACTURING A CARBON BEAM ADAPTED TO BE A PART OF A WIND TURBINE BLADE, CARBON BEAM FOR A WIND TURBINE BLADE, WIND TURBINE BLADE AND WIND TURBINE FLORES, JUAN G —
19477509 SEGMENTED WIND TURBINE BLADE, METHOD FOR ASSEMBLING A SEGMENTED WIND TURBINE BLADE AND WIND TURBINE KIM, SANG K —
19103388 Laser projector assembly BEATTY, TY MITCHELL —
18994646 WIND TURBINE ROTOR BLADE GOLIK, ARTHUR PAUL —

Top Art Units

Art UnitApps
3745 6
2668 2
3654 2
1745 2
3615 2
2834 1
1743 1
2836 1
3633 1
2115 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19489813 Connector assembly WONG, ELTON K 3745 §112 Non-Final OA — Pending Dec 03, 2025
19477851 METHOD FOR MANUFACTURING A CARBON BEAM ADAPTED TO BE A PART OF A WIND TURBINE BLADE, CARBON BEAM FOR A WIND TURBINE BLADE, WIND TURBINE BLADE AND WIND TURBINE FLORES, JUAN G 3745 §112 Non-Final OA — Pending Oct 23, 2025
19477509 SEGMENTED WIND TURBINE BLADE, METHOD FOR ASSEMBLING A SEGMENTED WIND TURBINE BLADE AND WIND TURBINE KIM, SANG K 3745 §102§103§112 Non-Final OA — Pending Oct 22, 2025
19110461 DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION ORTEGA, JOSEPH 2834 §102§103 Non-Final OA 9d overdue Pending Mar 11, 2025
19103388 Laser projector assembly BEATTY, TY MITCHELL 2668 §101§112 Non-Final OA — Pending Feb 12, 2025
19101619 Computer-implemented method for monitoring a generator of a wind turbine, wind turbine, computer program and elec-tronically readable storage medium HARRISON, MICHAEL A — §101§102§112 Non-Final OA — Pending Feb 06, 2025
18997552 LIFTING TOOL AHADI, ELIA — §102§103§112 Non-Final OA — Pending Jan 22, 2025
18994646 WIND TURBINE ROTOR BLADE GOLIK, ARTHUR PAUL 3745 §102§103§112 Non-Final OA — Pending Jan 15, 2025
18864673 METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT DARNELL, BAILEIGH K 1743 §103§112 Final Rejection 14d Pending Nov 11, 2024
18935090 TEST RIG FOR A WIND TURBINE BLADE BEARING KIRKLAND III, FREDDIE — §102§103 Non-Final OA — Pending Nov 01, 2024
18928392 LOUVER GRAY, PAUL J — §102§103§112 Non-Final OA — Pending Oct 28, 2024
18908913 WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE KESSIE, DANIEL 2836 §103 Non-Final OA 175d overdue Pending Oct 08, 2024
18844911 SMART POWER GRID ERDMAN, CHAD G — §103 Non-Final OA — Pending Sep 06, 2024
18842488 MULTI-PHASE POWER CONVERTER CONTROL KAKARLA, BHASKAR — §101§103 Non-Final OA — Pending Aug 29, 2024
18840929 LIFTING YOKE FOR LIFTING A BUILDING ELEMENT AND METHOD FOR LIFTING A BUILDING ELEMENT HOLLY, LEE A — §102§103 Non-Final OA — Pending Aug 23, 2024
18832587 OPERATING A PLANT DURING LOW NATURAL POWER WORKU, KIDEST — §103§112 Non-Final OA — Pending Jul 24, 2024
18730356 MEASURING A STATOR SHAFT AND ASSEMBLING A STATOR AND A GENERATOR CHILTON, CLARA GRACE — §102§103§112 Non-Final OA — Pending Jul 19, 2024
18726208 LIFTING RIGGING BURRELL, KATELYNNE RUTH 3654 §102§103§112 Non-Final OA — Pending Jul 02, 2024
18721275 METHOD FOR MANUFACTURING A PREFORM ELEMENT, METHOD FOR MANUFACTURING A WIND TURBINE ROTOR BLADE, AND MOLD ARRANGEMENT SWANSON, ANDREW L 1745 §103 Final Rejection 15d overdue Pending Jun 18, 2024
18716688 DAMPING DEVICE HERRING, BRENT W 3633 §102§103§112 Final Rejection 60d Pending Jun 05, 2024
18712045 METHOD OF INSPECTING AN ADHESIVE LAYER TRAN, PHUOC 2668 §103 Final Rejection — Pending May 21, 2024
18705847 YAWING A WIND TURBINE DURING IDLING COLLINS, GARY 2115 §103 Non-Final OA — Pending Apr 29, 2024
18694832 WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE FISHER, WESLEY LE 3745 §102§112 Final Rejection 34d Pending Mar 22, 2024
18411283 PERFORMING DEFORMATION ANALYSIS OF A WIND TURBINE BLADE SHABMAN, MARK A 2855 §102§103 Final Rejection 13d Pending Jan 12, 2024
18576242 LIFTING TOOL ARRANGEMENT FOR LIFTING A COMPONENT, TOOL FOR SUCH A LIFTING TOOL ARRANGEMENT AND METHOD FOR LIFTING A WIND TURBINE COMPONENT BURRELL, KATELYNNE RUTH — §102§103§112 Non-Final OA — Pending Jan 03, 2024
18574383 ROOT ASSEMBLY OF A WIND TURBINE BLADE FOR A WIND TURBINE, WIND TURBINE BLADE AND WIND TURBINE LAMBERT, WAYNE A 3745 §103 Final Rejection — Pending Dec 27, 2023
18573032 METHOD FOR MANUFACTURING A PREFORM PART FOR A WIND TURBINE BLADE, PREFORM PART, WIND TURBINE BLADE AND WIND TURBINE PAGE, HANA C 1745 §103 Non-Final OA 24d overdue Pending Dec 21, 2023
18565048 WIND TURBINE BLADE HANDLING TOOL AND METHOD FOR HANDLING OF A WIND TURBINE BLADE VU, STEPHEN A — §102§103§112 Non-Final OA — Pending Nov 28, 2023
18563830 ESTIMATING A SEA STATE OF AN OFFSHORE WIND TURBINE HAYES, JOVON E 3615 §102§103§112 Non-Final OA 82d Pending Nov 22, 2023
18560965 METHOD FOR MANUFACTURING OF A WIND TURBINE BLADE COMPONENT AND WIND TURBINE ROOT DANIELS, MATTHEW J 1742 §103 Non-Final OA — Pending Nov 15, 2023
18556464 MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS NIMOX, RAYMOND LONDALE 2857 §101 Final Rejection 49d overdue Pending Oct 20, 2023
18011871 LIFTING APPARATUS FOR A LIFTING CRANE QURESHI, REHMAN AHMED 3654 §102§103 Final Rejection 5d overdue Pending Dec 21, 2022
17949272 SURFACE TREATMENT VEHICLE AND METHOD FOR MANUFACTURING A WIND TURBINE BLADE KITT, STEPHEN A 1717 §103 Non-Final OA — Pending Sep 21, 2022
17634295 CONTROL SYSTEM FOR STABILIZING A FLOATING WIND TURBINE POLAY, ANDREW 3615 §103§112 Non-Final OA — Pending Feb 10, 2022
17272067 TREATING A WIND TURBINE DRIVE TRAIN LAUGHLIN, CHARLES S 2846 §103 Final Rejection — Pending Feb 26, 2021

Managing Siemens Gamesa Renewable Energy S.A.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month