Listed by the USPTO as BURKE, THOMAS P
Tech Center 3700 • Art Units: 3741
This examiner grants 44% of resolved cases
This examiner is in Tech Center 3700 and Art Unit 3741, with 388 resolved cases. The allowance rate is 44.1%, and the median time to allowance is 1323 days. The 21.1% interview lift is positive, but the overall allowance rate indicates that substantive claim work remains central to prosecution planning.
The principal companies are General Electric Company, Rolls-Royce plc, and Mitsubishi Heavy Industries Ltd. The leading firms are Dority & Manning, P.A. and GEC-Aviation, WENDEROTH, LIND & PONACK, L.L.P., and Chiesa Shahinian & Giantomasi PC. Practitioners may combine focused interviews with technically supported amendments and a plan for extended prosecution.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 17794107 | ASSEMBLY FOR A TURBINE ENGINE | Non-Final OA | SAFRAN AIRCRAFT ENGINES |
| 18583176 | SHOWERHEAD | Final Rejection | KOHLER MIRA LIMITED |
| 18402070 | ENDOSCOPE VALVE DEVICES, SYSTEMS, AND METHODS | Non-Final OA | BOSTON SCIENTIFIC SCIMED, INC. |
| 18779286 | Accessory Gearbox with Accessories with a Stacked Configuration | Non-Final OA | The Boeing Company |
| 18487054 | VASODILATOR INTRODUCER SHEATH | Non-Final OA | Medtronic, Inc. |
| 19064046 | COMBUSTOR FOR A GAS TURBINE ENGINE | Non-Final OA | General Electric Company |
| 18609120 | SYSTEM AND APPARATUS FOR REDUCING BOW WAVES IN GAS TURBINE ENGINES | Non-Final OA | General Electric Company |
| 18476595 | COMBUSTION SECTION WITH A PRIMARY COMBUSTOR AND A SET OF SECONDARY COMBUSTORS | Final Rejection | GENERAL ELECTRIC COMPANY |
| 18618761 | ELECTRIC COMPRESSOR STAGE FOR A GAS TURBINE ENGINE | Non-Final OA | RTX Corporation |
| 18428580 | AIR PURGE FOR GAS TURBINE ENGINE FUEL INJECTOR ASSEMBLY | Final Rejection | RTX Corporation |
| 19156961 | ELECTRICAL POWER GENERATION SYSTEM | Non-Final OA | MITSUBISHI HEAVY INDUSTRIES, LTD |
| 19287125 | COMBUSTOR AND GAS TURBINE PROVIDED WITH SAME | Non-Final OA | MITSUBISHI HEAVY INDUSTRIES, LTD. |
| 18580515 | AXIAL ACTUATION MECHANISM FOR CATHETERS | Final Rejection | BIOTRONIK AG |
| 18733571 | EFFUSION COOLED FUEL NOZZLE TIP | Non-Final OA | PRATT & WHITNEY CANADA CORP. |
| 19036602 | SYSTEM FOR PURGING A FUEL HAVING REACTIVE GAS | Non-Final OA | GE Infrastructure Technology LLC |
| 18826523 | HOT SCR TEMPERING AIR SYSTEM FOR GAS TURBINE PART LOAD EFFICIENCY AND EXTENDED TURNDOWN | Final Rejection | GE Infrastructure Technology LLC |
| 18696665 | AIR-BREATHING PLASMA JET ENGINE | Non-Final OA | GEORGIA TECH RESEARCH CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy44.1% of resolved applications examined by Thomas P Burke were allowed (388 resolved cases), compared with 62.8% across Art Unit 3741 over the last five years.
This examiner's interview lift is +21.1 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Thomas P Burke took 1,323 days on average from filing to allowance.
Thomas P Burke examines applications in Art Unit 3741 in Tech Center 3700 (Medical Devices & Mechanical Engineering).