14 pending office actions • 12 art units • 14 examiners • 0 of 14 (0%) have an AI response strategy ready • 40 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 3 (21%) |
| §103 only | 3 (21%) |
| §102 only | 1 (7%) |
| §112 only | 2 (14%) |
| Multi-statute (no §101) | 5 (36%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| VARMA, ASHISH K | 1 | 74.3% | +32.8% |
| SAYRE, JAMES G | 1 | 84.0% | +12.8% |
| CAULK, JENNIFER CHRISTINE | 1 | 100.0% | +0.0% |
| HALL, KRISTYN A | 1 | 81.9% | -6.0% |
| DANG, RACHEL YEN VI | 1 | 100.0% | +0.0% |
| LOUGHRAN, RYAN PATRICK | 1 | 76.9% | +27.3% |
| MAPAR, BIJAN | 1 | 67.5% | +28.7% |
| CEPLUCH, ALYSSA L | 1 | 62.4% | +24.8% |
| LAMBE, PATRICK F | 1 | 62.5% | +28.7% |
| CAI, WENWEN | 1 | 59.6% | +19.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19178563 | Device and Method for Disconnecting Jammed Subsea Wet-Mate Connectors | SAYRE, JAMES G | 53d overdue |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17976117 | POLYMER NANOCOMPOSITE FOR USE IN ELECTRICAL AND ELECTRONIC EQUIPMENT WITH PROPERTIES SUITABLE FOR APPLICATIONS SUCH AS ELECTRICAL INSULATION AND WITH THERMAL CONDUCTIVITY GAIN | CAI, WENWEN | 45d overdue |
| 17669902 | MODELING A KARST FORMATION FOR A WELLBORE OPERATION | HAO, YI | 5d overdue |
| 18965908 | COMPUTER IMPLEMENTED METHOD FOR REAL-TIME LWD PROFILE PREDICTION IN THE INTERVALS FROM THE DRILL TIP TO THE LIMIT OF THE DEPTH PROFILE OFFSETS | HALL, KRISTYN A | 4d overdue |
| 18640649 | METHOD OF MONITORING IMAGES | DANG, RACHEL YEN VI | 70d |
| 19389508 | System for Preventive Inhibition of Scaling in Oil Wells and Process for Preventive Inhibition of Scaling in Oil Wells | VARMA, ASHISH K | — |
| 18972298 | THREE-PHASE INVERTER | CAULK, JENNIFER CHRISTINE | — |
| 18307655 | METHOD FOR AUTOMATED INTERPRETATION OF PLT DATA THROUGH THE INVERSE METHOD WITH SMOOTHNESS LINK | MAPAR, BIJAN | — |
| 17970868 | COMBINED METHOD FOR ESTIMATING INJECTIVITY LOSS IN CARBONATE RESERVOIRS | DEBNATH, NUPUR | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19178563 | Device and Method for Disconnecting Jammed Subsea Wet-Mate Connectors | SAYRE, JAMES G | 53d overdue |
| 17976117 | POLYMER NANOCOMPOSITE FOR USE IN ELECTRICAL AND ELECTRONIC EQUIPMENT WITH PROPERTIES SUITABLE FOR APPLICATIONS SUCH AS ELECTRICAL INSULATION AND WITH THERMAL CONDUCTIVITY GAIN | CAI, WENWEN | 45d overdue |
| 19389508 | System for Preventive Inhibition of Scaling in Oil Wells and Process for Preventive Inhibition of Scaling in Oil Wells | VARMA, ASHISH K | — |
| 18529811 | PETROLEUM ASPHALT CEMENT COMPOSITION FROM URBAN SOLID WASTE AND PROCESS FOR OBTAINING SAID PETROLEUM ASPHALT CEMENT | LOUGHRAN, RYAN PATRICK | — |
| 18307655 | METHOD FOR AUTOMATED INTERPRETATION OF PLT DATA THROUGH THE INVERSE METHOD WITH SMOOTHNESS LINK | MAPAR, BIJAN | — |
| 18248376 | RENEWABLE AVIATION KEROSENE PRODUCTION PROCESS | CEPLUCH, ALYSSA L | — |
| 18041884 | SYSTEM FOR IMPROVING FLEXIBILITY OF RISER SUPPORTS IN STATIONARY PRODUCTION UNITS AND INSTALLATION METHOD | LAMBE, PATRICK F | — |
| Art Unit | Apps |
|---|---|
| 3674 | 1 |
| 3679 | 1 |
| 3672 | 1 |
| 2661 | 1 |
| 1731 | 1 |
| 1772 | 1 |
| 3676 | 1 |
| 1763 | 1 |
| 2186 | 1 |
| 1771 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19389508 | System for Preventive Inhibition of Scaling in Oil Wells and Process for Preventive Inhibition of Scaling in Oil Wells | VARMA, ASHISH K | 3674 | §103§112 | Non-Final OA | — | Pending | Nov 14, 2025 |
| 19178563 | Device and Method for Disconnecting Jammed Subsea Wet-Mate Connectors | SAYRE, JAMES G | 3679 | §102 | Final Rejection | 53d overdue | Pending | Apr 14, 2025 |
| 18972298 | THREE-PHASE INVERTER | CAULK, JENNIFER CHRISTINE | — | §103§112 | Non-Final OA | — | Pending | Dec 06, 2024 |
| 18965908 | COMPUTER IMPLEMENTED METHOD FOR REAL-TIME LWD PROFILE PREDICTION IN THE INTERVALS FROM THE DRILL TIP TO THE LIMIT OF THE DEPTH PROFILE OFFSETS | HALL, KRISTYN A | 3672 | §101 | Final Rejection | 4d overdue | Pending | Dec 02, 2024 |
| 18640649 | METHOD OF MONITORING IMAGES | DANG, RACHEL YEN VI | 2661 | §103§112 | Non-Final OA | 70d | Pending | Apr 19, 2024 |
| 18529811 | PETROLEUM ASPHALT CEMENT COMPOSITION FROM URBAN SOLID WASTE AND PROCESS FOR OBTAINING SAID PETROLEUM ASPHALT CEMENT | LOUGHRAN, RYAN PATRICK | 1731 | §112 | Non-Final OA | — | Pending | Dec 05, 2023 |
| 18307655 | METHOD FOR AUTOMATED INTERPRETATION OF PLT DATA THROUGH THE INVERSE METHOD WITH SMOOTHNESS LINK | MAPAR, BIJAN | — | §101 | Non-Final OA | — | Pending | Apr 26, 2023 |
| 18248376 | RENEWABLE AVIATION KEROSENE PRODUCTION PROCESS | CEPLUCH, ALYSSA L | 1772 | §112 | Non-Final OA | — | Pending | Apr 07, 2023 |
| 18041884 | SYSTEM FOR IMPROVING FLEXIBILITY OF RISER SUPPORTS IN STATIONARY PRODUCTION UNITS AND INSTALLATION METHOD | LAMBE, PATRICK F | 3676 | §103 | Final Rejection | — | Pending | Feb 16, 2023 |
| 17976117 | POLYMER NANOCOMPOSITE FOR USE IN ELECTRICAL AND ELECTRONIC EQUIPMENT WITH PROPERTIES SUITABLE FOR APPLICATIONS SUCH AS ELECTRICAL INSULATION AND WITH THERMAL CONDUCTIVITY GAIN | CAI, WENWEN | 1763 | §103§112 | Final Rejection | 45d overdue | Pending | Oct 28, 2022 |
| 17970868 | COMBINED METHOD FOR ESTIMATING INJECTIVITY LOSS IN CARBONATE RESERVOIRS | DEBNATH, NUPUR | 2186 | §103§112 | Non-Final OA | — | Pending | Oct 21, 2022 |
| 17659821 | PROCESS FOR OBTAINING ALKYL-NAPHTHENICS | STEIN, MICHELLE | 1771 | §103 | Final Rejection | — | Pending | Apr 19, 2022 |
| 17669902 | MODELING A KARST FORMATION FOR A WELLBORE OPERATION | HAO, YI | 2187 | §101 | Non-Final OA | 5d overdue | Pending | Feb 11, 2022 |
| 17666272 | CATALYSTS, PROCESS FOR OBTAINING AND STEAM PRE-REFORMING PROCESS OF HYDROCARBONS | SPEER, JOSHUA MAXWELL | 1736 | §103 | Final Rejection | 1d overdue | Pending | Feb 07, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial