Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
15 pending office actions • 11 art units • 15 examiners • 0 of 15 (0%) have an AI response strategy ready • 10 patents granted in the last 365 days
Tae Technologies Inc. currently has 15 pending office actions in the Semiconductors, Circuits & Optics technology area. There are 15 distinct examiners assigned to these matters, meaning each pending office action is handled by a different individual. This distribution shows no concentration of cases under any single examiner.
The portfolio is spread across 11 distinct art units. NGUYEN, THUY-VI THI is the busiest examiner with 1 pending office action. The presence of 11 distinct art units for 15 pending office actions suggests that the company's semiconductor and optics filings are technically diverse enough to trigger review by many different art units. With 15 distinct examiners and 11 distinct art units, the company must navigate a wide variety of examination styles within the Semiconductors, Circuits & Optics sector. This decentralized approach is a key feature of their current prosecution strategy.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 5 (33%) |
| §102 only | 4 (27%) |
| §112 only | 1 (7%) |
| Multi-statute (no §101) | 5 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| NGUYEN, THUY-VI THI | 1 | 51.6% | +11.4% |
| ARANT, HARRY E | 1 | 49.6% | +21.4% |
| VANORE, DAVID A | 1 | 88.9% | +7.5% |
| DINH, PAUL | 1 | 89.5% | +4.2% |
| EINHORN, MICA JILLIAN | 1 | 71.4% | +40.0% |
| GARNER, LILY CRABTREE | 1 | 68.2% | +16.2% |
| TRIVISONNO, ANGELO | 1 | 53.0% | +25.8% |
| SHAFAYET, MOHAMMED | 1 | 75.5% | +35.8% |
| STONER, KILEY SHAWN | 1 | 80.8% | +15.3% |
| KAISER, SYED M | 1 | 86.1% | +6.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18320734 | COUPLING LITHIUM TO A SUBSTRATE | STONER, KILEY SHAWN | 30d overdue |
| 18492461 | Systems, Devices, and Methods for Rail-Based and Other Electric Vehicles with Modular Cascaded Energy Systems | DINH, PAUL | 22d |
| 18678180 | SUPPORT STRUCTURE FOR CHARGED PARTICLE BEAM TARGET | VANORE, DAVID A | — |
| 18144527 | SYSTEM, DEVICES AND METHODS FOR ELECTRON BEAM FOR PLASMA HEATING | KAISER, SYED M | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18481054 | LITHIUM TARGET WITH INTERMEDIATE LAYER | EINHORN, MICA JILLIAN | — |
| 18239962 | INTEGRATED LITHIUM TARGET | GARNER, LILY CRABTREE | — |
| 18141594 | NEUTRON GENERATING TARGET FOR NEUTRON BEAM SYSTEMS | DAVIS, SHARON M | — |
| 18445077 | SYSTEMS, DEVICES, AND METHODS FOR PULSE CHARGING AND PULSE HEATING OF RECHARGEABLE ENERGY SOURCES | HENZE, DAVID V | — |
| 17831721 | SYSTEMS, DEVICES, AND METHODS FOR CURRENT CONTROL OF MULTIPLE ENERGY SOURCES IN A BALANCED FASHION | WEINMANN, RYU-SUNG PETER | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18320734 | COUPLING LITHIUM TO A SUBSTRATE | STONER, KILEY SHAWN | 30d overdue |
| 18239835 | CARBON NEGATIVE REACTORS | TRIVISONNO, ANGELO | 83d |
| 19131762 | MODULE-BASED ENERGY SYSTEMS FOR SUPPLYING POWER TO PRIMARY AND AUXILIARY LOADS | NGUYEN, THUY-VI THI | — |
| 18769674 | Modular Cascaded Energy Systems with a Cooling Apparatus and with Replaceable Energy Source Capability | ARANT, HARRY E | — |
| 18481054 | LITHIUM TARGET WITH INTERMEDIATE LAYER | EINHORN, MICA JILLIAN | — |
| 18239962 | INTEGRATED LITHIUM TARGET | GARNER, LILY CRABTREE | — |
| 18453902 | ENERGY SYSTEM ISLANDING DETECTION | SHAFAYET, MOHAMMED | — |
| Art Unit | Apps |
|---|---|
| 3646 | 3 |
| 2859 | 3 |
| 3656 | 1 |
| 3700 | 1 |
| 2878 | 1 |
| 2851 | 1 |
| 2881 | 1 |
| 1722 | 1 |
| 2116 | 1 |
| 1735 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19131762 | MODULE-BASED ENERGY SYSTEMS FOR SUPPLYING POWER TO PRIMARY AND AUXILIARY LOADS | NGUYEN, THUY-VI THI | 3656 | §102 | Non-Final OA | — | Pending | May 21, 2025 |
| 18769674 | Modular Cascaded Energy Systems with a Cooling Apparatus and with Replaceable Energy Source Capability | ARANT, HARRY E | 3700 | §102 | Final Rejection | — | Pending | Jul 11, 2024 |
| 18678180 | SUPPORT STRUCTURE FOR CHARGED PARTICLE BEAM TARGET | VANORE, DAVID A | 2878 | §102 | Non-Final OA | — | Pending | May 30, 2024 |
| 18492461 | Systems, Devices, and Methods for Rail-Based and Other Electric Vehicles with Modular Cascaded Energy Systems | DINH, PAUL | 2851 | §102 | Final Rejection | 22d | Pending | Oct 23, 2023 |
| 18481054 | LITHIUM TARGET WITH INTERMEDIATE LAYER | EINHORN, MICA JILLIAN | 2881 | §102§103§112 | Final Rejection | — | Pending | Oct 04, 2023 |
| 18239962 | INTEGRATED LITHIUM TARGET | GARNER, LILY CRABTREE | 3646 | §102§103§112 | Non-Final OA | — | Pending | Aug 30, 2023 |
| 18239835 | CARBON NEGATIVE REACTORS | TRIVISONNO, ANGELO | 1722 | §112 | Final Rejection | 83d | Pending | Aug 30, 2023 |
| 18453902 | ENERGY SYSTEM ISLANDING DETECTION | SHAFAYET, MOHAMMED | 2116 | §103 | Final Rejection | — | Pending | Aug 22, 2023 |
| 18320734 | COUPLING LITHIUM TO A SUBSTRATE | STONER, KILEY SHAWN | 1735 | §103 | Final Rejection | 30d overdue | Pending | May 19, 2023 |
| 18144527 | SYSTEM, DEVICES AND METHODS FOR ELECTRON BEAM FOR PLASMA HEATING | KAISER, SYED M | 3646 | §103 | Non-Final OA | — | Pending | May 08, 2023 |
| 18141594 | NEUTRON GENERATING TARGET FOR NEUTRON BEAM SYSTEMS | DAVIS, SHARON M | 3646 | §103§112 | Final Rejection | — | Pending | May 01, 2023 |
| 18136823 | PULSED CHARGING FOR ENERGY SOURCES OF CONNECTED MODULES | BERHANU, SAMUEL | 2859 | §103 | Final Rejection | 29d | Pending | Apr 19, 2023 |
| 18445077 | SYSTEMS, DEVICES, AND METHODS FOR PULSE CHARGING AND PULSE HEATING OF RECHARGEABLE ENERGY SOURCES | HENZE, DAVID V | 2859 | §102§103 | Final Rejection | — | Pending | Mar 29, 2023 |
| 17950789 | SYSTEMS, DEVICES, AND METHODS FOR MODULE-BASED CASCADED ENERGY SYSTEMS CONFIGURED TO INTERFACE WITH RENEWABLE ENERGY SOURCES | PARRIES, DRU M | 2836 | §103 | Final Rejection | 37d overdue | Pending | Sep 22, 2022 |
| 17831721 | SYSTEMS, DEVICES, AND METHODS FOR CURRENT CONTROL OF MULTIPLE ENERGY SOURCES IN A BALANCED FASHION | WEINMANN, RYU-SUNG PETER | 2859 | §102§103 | Final Rejection | — | Pending | Jun 03, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial