Listed by the USPTO as SILVA, FRANK ALEXIS
Tech Center 2800 • Art Units: 1729 2646 2851 2859
This examiner grants 31% of resolved cases
The record covers 48 resolved cases in Tech Center 2800 and Art Unit 1729. The allowance rate is 31.3%, the interview lift is 54.7%, and the median time to allowance is 1323 days. These figures show a relatively low allowance outcome, a substantial positive interview association, and a timing measure that may affect prosecution planning.
The leading company affiliations are Toyota Motor Corporation, MILWAUKEE ELECTRIC TOOL Corporation, and LG Energy Solution Ltd. The leading firms are BIRCH STEWART KOLASCH & BIRCH, LLP, MICHAEL BEST & FRIEDRICH LLP (Mke), and OLIFF PLC. Practitioners may find interviews particularly worth considering, but the low allowance rate indicates that interview discussions should be supported by carefully framed amendments and evidence.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18010259 | APPARATUS AND METHOD FOR CONTROLLING POWER OF PARALLEL MULTI PACK MODULE | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 17913577 | BATTERY MANAGEMENT APPARATUS AND METHOD, AND BATTERY MANAGEMENT SYSTEM | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 17665930 | BATTERY CHARGING AND DISCHARGING APPARATUS AND METHOD | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 18704038 | Systems and Methods for Controlling Charging and Maintenance of a Battery Using a Charger | Non-Final OA | Milwaukee Electric Tool Corporation |
| 18256847 | MULTI-BAY BATTERY CHARGER | Final Rejection | MILWAUKEE ELECTRIC TOOL CORPORATION |
| 18196911 | WIRELESS CHARGING OF ELECTRONIC DEVICES | Final Rejection | APPLE INC. |
| 18668803 | COMMUNICATION DEVICE AND OPERATION METHOD OF COMMUNICATION DEVICE | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18468799 | INFORMATION MANAGEMENT SYSTEM AND INFORMATION MANAGEMENT METHOD | Final Rejection | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18366110 | CHARGE-DISCHARGE CONTROL DEVICE | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18076782 | VEHICLE | Final Rejection | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18254712 | Adapter for an Exchangeable Rechargeable Battery Pack | Final Rejection | Robert Bosch GmbH |
| 18305570 | CHARGING METHOD, CHARGING APPARATUS, AND CHARGING SYSTEM FOR TRACTION BATTERY | Final Rejection | CONTEMPORARY AMPEREX TECHNOLOGY CO., LIMITED |
| 18582698 | MANAGEMENT APPARATUS | Non-Final OA | HONDA MOTOR CO., LTD. |
| 18620694 | POWER SUPPLY DEVICE | Non-Final OA | DENSO CORPORATION |
| 18341468 | MOBILE CHARGING APPARATUS, WEARABLE APPARATUS, AND APPARATUS CONTROL METHOD AND STORAGE MEDIUM | Final Rejection | Beijing Xiaomi Mobile Software Co., Ltd. |
| 18156919 | ADAPTIVE BATTERY BACKUP UNIT CHARGING SYSTEM AND METHOD | Non-Final OA | DELL PRODUCTS L.P. |
| 18662855 | CHARGING SYSTEM AND METHOD | Non-Final OA | Cypress Semiconductor Corporation |
| 18586044 | EQUALIZATION CIRCUIT, BATTERY PACK, AND ENERGY STORAGE SYSTEM | Non-Final OA | HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD. |
| 18455149 | Energy System and Charging and Discharging Control Method | Final Rejection | Huawei Digital Power Technologies Co., Ltd. |
| 18196562 | METHODS AND SYSTEMS FOR OPTIMIZED FAST CHARGING | Final Rejection | Ford Global Technologies, LLC |
| 18435601 | SYSTEM AND METHOD FOR CONTROLLING AN AIRCRAFT BATTERY ASSEMBLY | Non-Final OA | Pratt & Whitney Canada Corp. |
| 18435580 | AIRCRAFT BATTERY CHARGING SYSTEM AND METHOD | Non-Final OA | Pratt & Whitney Canada Corp. |
| 18341411 | HIGH VOLTAGE ELECTRICAL SHORT CIRCUIT PROTECTION SYSTEM FOR HYBRID VEHICLES | Final Rejection | FCA US LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy31.3% of resolved applications examined by Frank Alexis Silva were allowed (48 resolved cases), compared with 52.6% across Art Unit 1729 over the last five years.
This examiner's interview lift is +54.7 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Frank Alexis Silva took 1,323 days on average from filing to allowance.
Frank Alexis Silva examines applications in Art Unit 1729 in Tech Center 2800 (Semiconductors, Circuits & Optics).