22 pending office actions • 3 clients • 22 examiners • 13 art units • 0 of 22 (0%) have an AI response strategy ready • 1 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 7 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 7 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (9%) |
| §101 + other | 2 (9%) |
| §103 only | 8 (36%) |
| §102 only | 1 (5%) |
| §112 only | 1 (5%) |
| Multi-statute (no §101) | 8 (36%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| RUNYAN, SILVANA C | 1 | 82.4% | +17.1% |
| DAVIS, JASON GREGORY | 1 | 74.1% | +17.9% |
| LARGI, MATTHEW THOMAS | 1 | 77.0% | +15.4% |
| GRAY, PAUL J | 1 | 78.1% | +10.1% |
| ARANT, HARRY E | 1 | 49.0% | +22.1% |
| RAYMOND, KEITH MICHAEL | 1 | 55.4% | +21.6% |
| HANSEN, KENNETH J | 1 | 81.3% | +7.8% |
| MIAN, SHAFIQ A | 1 | 78.9% | +25.0% |
| SEIFU, LESSANEWORK T | 1 | 79.1% | +1.0% |
| MCGANN, BERNADETTE KAREN | 1 | 65.0% | +20.5% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18859811 | LOW CARBON EMISSION COMPRESSION STATION WITH DUAL USE CAPABILITY | HANSEN, KENNETH J | 8d overdue |
| 18816631 | Untitled | RUNYAN, SILVANA C | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18303987 | RESETTABLE BACKUP AND SYSTEM | YAO, THEODORE N | 2d overdue |
| 18478001 | METHOD OF IDENTIFYING TOP OF CEMENT IN REAL TIME WHEN CEMENTING A LINER | AKARAGWE, YANICK A | 46d |
| 16512708 | METHOD OF PROVIDING WIRED PIPE DRILL SERVICES | ROBINSON, AKIBA KANELLE | 46d |
| 18511398 | STEERING DEVICE AUGMENTATION, METHOD AND SYSTEM | NORRIS, URSULA LEE | 77d |
| 19139038 | MULTI-STAGE COMPRESSOR SYSTEM WITH ANTI-SURGE ARRANGEMENT, AND METHOD | DAVIS, JASON GREGORY | — |
| 19042383 | FORCE BALANCED RECIPROCATING VALVE | GRAY, PAUL J | — |
| 18994953 | HEAT RECOVERY STEAM GENERATOR WITH PARALLEL TUBE BUNDLES | ARANT, HARRY E | — |
| 18880081 | GAS LIQUEFACTION SYSTEM WITH MULTIPLE REFRIGERANT CYCLES | RAYMOND, KEITH MICHAEL | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19117271 | SELF-SUFFICIENT SYSTEM FOR EVAPORATION OF LNG | LARGI, MATTHEW THOMAS | 20d |
| 18816631 | Untitled | RUNYAN, SILVANA C | — |
| 19139038 | MULTI-STAGE COMPRESSOR SYSTEM WITH ANTI-SURGE ARRANGEMENT, AND METHOD | DAVIS, JASON GREGORY | — |
| 19042383 | FORCE BALANCED RECIPROCATING VALVE | GRAY, PAUL J | — |
| 18994953 | HEAT RECOVERY STEAM GENERATOR WITH PARALLEL TUBE BUNDLES | ARANT, HARRY E | — |
| 18880081 | GAS LIQUEFACTION SYSTEM WITH MULTIPLE REFRIGERANT CYCLES | RAYMOND, KEITH MICHAEL | — |
| 18859826 | LOW EMISSION COMPRESSION STATION WITHOUT DEDICATED POWER GENERATION ISLAND | MIAN, SHAFIQ A | — |
| 18651110 | SYSTEM AND METHOD FOR PURIFYING WATER | MCGANN, BERNADETTE KAREN | — |
| Client (Assignee) | Pending OAs |
|---|---|
| Baker Hughes | 19 |
| Nuovo Pignone Tecnologie S.r.l. | 2 |
| Industrial Climate Solutions Inc. | 1 |
| Art Unit | Apps |
|---|---|
| 3746 | 3 |
| 3676 | 3 |
| 3674 | 1 |
| 3745 | 1 |
| 3763 | 1 |
| 1771 | 1 |
| 2857 | 1 |
| 3625 | 1 |
| 2874 | 1 |
| 1736 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18816631 | Untitled | BAKER HUGHES OILFIELD OPERATIONS LLC | RUNYAN, SILVANA C | 3674 | §103 | Non-Final OA | — | Pending | |
| 19139038 | MULTI-STAGE COMPRESSOR SYSTEM WITH ANTI-SURGE ARRANGEMENT, AND METHOD | Nuovo Pignone Tecnologie - S.r.l. | DAVIS, JASON GREGORY | 3745 | §101§103§112 | Non-Final OA | — | Pending | Jun 13, 2025 |
| 19117271 | SELF-SUFFICIENT SYSTEM FOR EVAPORATION OF LNG | Nuovo Pignone Tecnologie -S.R.L. | LARGI, MATTHEW THOMAS | 3746 | §103 | Final Rejection | 20d | Pending | Mar 31, 2025 |
| 19042383 | FORCE BALANCED RECIPROCATING VALVE | BAKER HUGHES OILFIELD OPERATIONS LLC | GRAY, PAUL J | §102§103 | Non-Final OA | — | Pending | Jan 31, 2025 | |
| 18994953 | HEAT RECOVERY STEAM GENERATOR WITH PARALLEL TUBE BUNDLES | Nuovo Pignone Tecnologie - S.r.l. | ARANT, HARRY E | §102§103 | Non-Final OA | — | Pending | Jan 15, 2025 | |
| 18880081 | GAS LIQUEFACTION SYSTEM WITH MULTIPLE REFRIGERANT CYCLES | Nuovo Pignone Tecnologie -S.R.L. | RAYMOND, KEITH MICHAEL | §102§103 | Non-Final OA | — | Pending | Dec 30, 2024 | |
| 18859811 | LOW CARBON EMISSION COMPRESSION STATION WITH DUAL USE CAPABILITY | Nuovo Pignone Tecnologie - S.r.l. | HANSEN, KENNETH J | 3746 | §103 | Non-Final OA | 8d overdue | Pending | Oct 24, 2024 |
| 18859826 | LOW EMISSION COMPRESSION STATION WITHOUT DEDICATED POWER GENERATION ISLAND | Nuovo Pignone Tecnologie - S.r.l. | MIAN, SHAFIQ A | 3746 | §103 | Non-Final OA | — | Pending | Oct 24, 2024 |
| 18671334 | CONDUIT ASSEMBLIES FOR A HEAT AND MASS TRANSFER SYSTEM | Industrial Climate Solutions Inc. | SEIFU, LESSANEWORK T | 3763 | §102§112 | Non-Final OA | — | Pending | May 22, 2024 |
| 18651110 | SYSTEM AND METHOD FOR PURIFYING WATER | Nuovo Pignone Tecnologie Srl | MCGANN, BERNADETTE KAREN | §103§112 | Non-Final OA | — | Pending | Apr 30, 2024 | |
| 18584398 | SYSTEM FOR PRODUCING ENERGY AND BIOMETHANE FROM WASTE | Nuovo Pignone Tecnologie S.r.l. | OLADAPO, TAIWO | 1771 | §103 | Final Rejection | — | Pending | Feb 22, 2024 |
| 18422623 | ELECTROMAGNETIC TELEMETRY GAP SUB | BAKER HUGHES OILFIELD OPERATIONS LLC | RO, YONG-SUK | 3676 | §103 | Final Rejection | — | Pending | Jan 25, 2024 |
| 18422465 | ESTIMATION OF ELECTROMAGNETIC TOOL DETECTION CAPABILITY IN THREE-DIMENSIONAL FORMATION | BAKER HUGHES OILFIELD OPERATIONS LLC | HUYNH, PHUONG | 2857 | §101§102 | Non-Final OA | — | Pending | Jan 25, 2024 |
| 18416487 | PROBABILISTIC DETECTION OF DRILLING SCENARIOS | BAKER HUGHES OILFIELD OPERATIONS LLC | TORRES CHANZA, GABRIEL JOSE | 3625 | §101Other | Non-Final OA | — | Pending | Jan 18, 2024 |
| 18409993 | HYDROGEN SENSING WITH THERMAL COMPENSATION | BAKER HUGHES OILFIELD OPERATIONS LLC | WONG, TINA MEI SENG | 2874 | §103 | Non-Final OA | — | Pending | Jan 11, 2024 |
| 18511398 | STEERING DEVICE AUGMENTATION, METHOD AND SYSTEM | BAKER HUGHES OILFIELD OPERATIONS LLC | NORRIS, URSULA LEE | 3676 | §103§112 | Non-Final OA | 77d | Pending | Nov 16, 2023 |
| 18503271 | DUAL PURPOSE ENERGY PLANT HAVING A FUEL CELL SYSTEM | Nuovo Pignone Tecnologie S.r.l. | KIM, CRAIG SANG | §112 | Non-Final OA | — | Pending | Nov 07, 2023 | |
| 18487439 | RECOVERY OF POTASSIUM AND AMMONIA SALTS BY INDUCED PRECIPITATION WITH CO2 | Nuovo Pignone Tecnologie - S.r.l. | NGUYEN, CAM N | 1736 | §103 | Non-Final OA | — | Pending | Oct 16, 2023 |
| 18478001 | METHOD OF IDENTIFYING TOP OF CEMENT IN REAL TIME WHEN CEMENTING A LINER | BAKER HUGHES OILFIELD OPERATIONS LLC | AKARAGWE, YANICK A | 3672 | §103§112 | Non-Final OA | 46d | Pending | Sep 29, 2023 |
| 18468912 | PULSED ABSORPTION CONTACTOR | Nuovo Pignone Tecnologie Srl | HOBSON, STEPHEN | 1776 | §102 | Final Rejection | 29d overdue | Pending | Sep 18, 2023 |
| 18303987 | RESETTABLE BACKUP AND SYSTEM | BAKER HUGHES OILFIELD OPERATIONS LLC | YAO, THEODORE N | 3676 | §102§103 | Final Rejection | 2d overdue | Pending | Apr 20, 2023 |
| 16512708 | METHOD OF PROVIDING WIRED PIPE DRILL SERVICES | Baker Hughes Holdings LLC | ROBINSON, AKIBA KANELLE | 3628 | §101 | Final Rejection | 46d | Pending | Jul 16, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial