Technology area: Medical Devices & Mechanical Engineering
35 pending office actions • 1 client • 31 examiners • 17 art units • 0 of 35 (0%) have an AI response strategy ready • 126 patents granted in the last 365 days
Cantor Colburn LLP - Pratt & Whitney focuses on the Medical Devices & Mechanical Engineering technology area, drawing on the firm's record of 74190 career applications. This specific profile is currently managing 29 pending office actions, which indicates an active prosecution pipeline. The firm's long-standing presence in the patent system is reflected in its total application count, providing a reservoir of experience.
The firm achieves a resolved allowance rate pct of 88.07, showing success in obtaining patent grants for its clients. This performance is reached with an avg_office_actions_per_allowance of 3.16, suggesting an efficient path through the USPTO examination process. The 88.07 resolved allowance rate pct reflects the firm's effectiveness in the Medical Devices & Mechanical Engineering field. With 74190 career applications as a foundation, the 3.16 avg_office_actions_per_allowance provides a clear expectation for the duration of the prosecution cycle. These metrics together illustrate an experienced patent practice that consistently delivers results.
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (3%) |
| §103 only | 18 (51%) |
| §102 only | 2 (6%) |
| §112 only | 2 (6%) |
| Multi-statute (no §101) | 12 (34%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| AMAR, MARC J | 4 | 75.1% | +37.8% |
| HANDVILLE, BRIAN | 2 | 51.4% | +28.9% |
| ZAMORA ALVAREZ, ERIC J | 1 | 88.6% | +21.4% |
| DAGENAIS, KRISTEN A | 1 | 63.8% | +20.2% |
| WAITS, ALAN B | 1 | 68.8% | +29.8% |
| DUMBRIS, SETH M | 1 | 76.4% | +16.6% |
| MEADE, LORNE EDWARD | 1 | 51.4% | +38.7% |
| WANG, XIAOBEI | 1 | 65.4% | +48.3% |
| BUTLER, KEVIN C | 1 | 89.5% | +8.8% |
| FIGUEROA, JOHN J | 1 | 83.2% | +8.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19420073 | FLANGE WITH STRESS ATTENTUATION FEATURE | ZAMORA ALVAREZ, ERIC J | — |
| 18819304 | ARTICLE AND METHOD FOR ACCURATELY POSITIONING OPTICAL TIP-TIMING PROBE | BUTLER, KEVIN C | — |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | FIGUEROA, JOHN J | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 8d overdue |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 12d |
| 18331699 | MULTI INSTRUMENT EGRESS FOR GAS TURBINE ENGINE | NAVARRO, HUGO IVAN | 35d |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | WAITS, ALAN B | — |
| 18774437 | STAGED BLADE INJECTOR | BURKE, THOMAS P | — |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | NIMOX, RAYMOND LONDALE | — |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | WIEHE, NATHANIEL EDWARD | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 12d |
| 18919910 | GAS TURBINE ENGINE WITH ELECTRICALLY DRIVEN COMPRESSOR | MEADE, LORNE EDWARD | 15d |
| 19420073 | FLANGE WITH STRESS ATTENTUATION FEATURE | ZAMORA ALVAREZ, ERIC J | — |
| 19040052 | CENTRIFUGAL COMPRESSOR DIFFUSER | AMAR, MARC J | — |
| 19036890 | COMPRESSOR BLEED SLOT DIFFUSER | AMAR, MARC J | — |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | DAGENAIS, KRISTEN A | — |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | WAITS, ALAN B | — |
| Client (Assignee) | Pending OAs |
|---|---|
| RTX | 35 |
| Art Unit | Apps |
|---|---|
| 3741 | 8 |
| 3745 | 5 |
| 1784 | 2 |
| 3617 | 1 |
| 3700 | 1 |
| 2884 | 1 |
| 2662 | 1 |
| 2197 | 1 |
| 2858 | 1 |
| 2665 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19420073 | FLANGE WITH STRESS ATTENTUATION FEATURE | Pratt & Whitney Canada Corp. | ZAMORA ALVAREZ, ERIC J | 3745 | §103 | Non-Final OA | — | Pending | Dec 15, 2025 |
| 19040052 | CENTRIFUGAL COMPRESSOR DIFFUSER | Pratt & Whitney Canada Corp. | AMAR, MARC J | 3741 | §112 | Final Rejection | — | Pending | Jan 29, 2025 |
| 19036890 | COMPRESSOR BLEED SLOT DIFFUSER | Pratt & Whitney Canada Corp. | AMAR, MARC J | 3741 | §103 | Final Rejection | — | Pending | Jan 24, 2025 |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | Rtx Corporation | DAGENAIS, KRISTEN A | §103 | Non-Final OA | — | Pending | Jan 23, 2025 | |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | Pratt & Whitney Canada Corp. | WAITS, ALAN B | 3617 | §102§103§112 | Non-Final OA | — | Pending | Jan 08, 2025 |
| 18953181 | CERAMIC MATRIX COMPOSITE SURFACE ROUGHNESS | Rtx Corporation | HANDVILLE, BRIAN | §102 | Non-Final OA | — | Pending | Nov 20, 2024 | |
| 18936360 | SEALING FOR ANODIZED METAL | Rtx Corporation | DUMBRIS, SETH M | §103 | Non-Final OA | — | Pending | Nov 04, 2024 | |
| 18919910 | GAS TURBINE ENGINE WITH ELECTRICALLY DRIVEN COMPRESSOR | Rtx Corporation | MEADE, LORNE EDWARD | 3741 | §103 | Non-Final OA | 15d | Pending | Oct 18, 2024 |
| 18826313 | COATING PROTECTION FOR STATOR VANES AND METHODS OF PROTECTION THEREOF | Rtx Corporation | WANG, XIAOBEI | 1784 | §103 | Final Rejection | — | Pending | Sep 06, 2024 |
| 18819304 | ARTICLE AND METHOD FOR ACCURATELY POSITIONING OPTICAL TIP-TIMING PROBE | Rtx Corporation | BUTLER, KEVIN C | §103 | Non-Final OA | — | Pending | Aug 29, 2024 | |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | Rtx Corporation | FIGUEROA, JOHN J | §102 | Non-Final OA | — | Pending | Jul 17, 2024 | |
| 18774437 | STAGED BLADE INJECTOR | Rtx Corporation | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | Rtx Corporation | NIMOX, RAYMOND LONDALE | §101 | Non-Final OA | — | Pending | Jul 08, 2024 | |
| 18677543 | COOLING FEATURES FOR A COMPONENT OF A GAS TURBINE ENGINE | Rtx Corporation | KIM, SANG K | 3745 | §103 | Non-Final OA | — | Pending | May 29, 2024 |
| 18441453 | GAS TURBINE ENGINE CONFIGURATION FOR CONTAINMENT TESTING | Pratt & Whitney Canada Corp. | WONG, ELTON K | 3745 | §103 | Final Rejection | — | Pending | Feb 14, 2024 |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | Rtx Corporation | WIEHE, NATHANIEL EDWARD | 3700 | §103§112 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18528989 | COMPRESSOR INNER AIR SEAL AND METHOD OF MAKING | Rtx Corporation | COLLISTER, ELIZABETH A | 1784 | §103 | Non-Final OA | — | Pending | Dec 05, 2023 |
| 18509529 | SLIDER SEAL OF GAS TURBINE ENGINE | Rtx Corporation | REITZ, MICHAEL K. | 3745 | §103§112 | Final Rejection | — | Pending | Nov 15, 2023 |
| 18492191 | COMPONENT CORROSION PROGNOSTICS USING COMPUTED TOMOGRAPHY (CT)-SCAN AND METHODS | Rtx Corporation | FAYE, MAMADOU | 2884 | §103 | Final Rejection | 25d overdue | Pending | Oct 23, 2023 |
| 18491300 | DEFECT DEPTH ESTIMATION FROM BORESCOPE IMAGERY | Rtx Corporation | YANG, JIANXUN | 2662 | §103 | Non-Final OA | — | Pending | Oct 20, 2023 |
| 18464792 | PROXIMITY MEASUREMENT BETWEEN SEAL ELEMENTS OF A GAS TURBINE ENGINE | Rtx Corporation | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | — | Pending | Sep 11, 2023 |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | Rtx Corporation | WEI, ZENGPU | 2197 | §103§112 | Non-Final OA | 8d overdue | Pending | Aug 07, 2023 |
| 18340740 | FAULT DETECTION AND LOAD MANAGEMENT IN A SERIES HYBRID PROPULSION SYSTEM | Rtx Corporation | LISOWSKI, JACEK | 3741 | §103 | Final Rejection | — | Pending | Jun 23, 2023 |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | Rtx Corporation | AMAR, MARC J | 3741 | §103§112 | Final Rejection | 12d | Pending | Jun 23, 2023 |
| 18331699 | MULTI INSTRUMENT EGRESS FOR GAS TURBINE ENGINE | Rtx Corporation | NAVARRO, HUGO IVAN | 2858 | §103§112 | Non-Final OA | 35d | Pending | Jun 08, 2023 |
| 18326233 | AUTOMATIC ADJUSTMENT OF PARAMETERS BASED ON PART SURFACE REFLECTIVE INDEX FOR POINT CLOUD ACQUISITION USING A BLUE LIGHT SCANNER | Pratt & Whitney Canada Corp. | MAHROUKA, WASSIM | 2665 | §103§112 | Non-Final OA | — | Pending | May 31, 2023 |
| 18162851 | SINGLE-STEP PROCESS FOR SELECTIVE HEAT TREATMENT OF METALS USING MULTIPLE HEATING SOURCES | Rtx Corporation | MCGUTHRY BANKS, TIMA MICHELE | 1733 | §112 | Non-Final OA | — | Pending | Feb 01, 2023 |
| 18083861 | GAS TURBINE ROTOR COMPONENT AND METHOD OF MANUFACTURE | Rtx Corporation | WALTERS, RYAN J | 3799 | §103 | Non-Final OA | — | Pending | Dec 19, 2022 |
| 18071141 | INTEGRATED THRUST REVERSER AND BRAKE CONTROL FOR AN AIRCRAFT | Rtx Corporation | HINTON, HENRY R | 3665 | §103§112 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 18071138 | FINAL TAKEOFF SPEED DETERMINATION FOR AN AIRCRAFT | Rtx Corporation | ALKIRSH, AHMED | 3668 | §103 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 17881968 | COMPOSITE FAN BLADE AIRFOIL, METHODS OF MANUFACTURE THEREOF AND ARTICLES COMPRISING THE SAME | Rtx Corporation | HANDVILLE, BRIAN | 1783 | §103§112 | Non-Final OA | — | Pending | Aug 05, 2022 |
| 17738513 | WELD REPAIR SYSTEM | Raytheon Technologies Corporation | LIU, CHRIS Q | 3761 | §102§112 | Final Rejection | — | Pending | May 06, 2022 |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | Rtx Corporation | AMAR, MARC J | 3741 | §102§103§112 | Final Rejection | 8d overdue | Pending | Jan 27, 2022 |
| 16844683 | COOLING SYSTEM FOR A GAS TURBINE ENGINE | Rtx Corporation | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Apr 09, 2020 |
| 16723360 | REINFORCED CERAMIC MATRIX COMPOSITE AND METHOD OF MANUFACTURE | UNITED TECHNOLOGIES CORPORATION | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Dec 20, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial