36 pending office actions • 2 clients • 34 examiners • 24 art units • 0 of 36 (0%) have an AI response strategy ready • 138 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (6%) |
| §103 only | 16 (44%) |
| §102 only | 2 (6%) |
| §112 only | 2 (6%) |
| Double-patenting + other | 2 (6%) |
| Multi-statute (no §101) | 12 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MEILLER, SEAN V | 2 | 77.0% | +37.7% |
| KESSLER, CHRISTOPHER S | 2 | 60.0% | +14.4% |
| ZAMORA ALVAREZ, ERIC J | 1 | 88.6% | +21.6% |
| WAITS, ALAN B | 1 | 68.9% | +29.6% |
| HANDVILLE, BRIAN | 1 | 51.6% | +28.1% |
| DUMBRIS, SETH M | 1 | 76.3% | +16.6% |
| MEADE, LORNE EDWARD | 1 | 51.0% | +39.6% |
| WANG, XIAOBEI | 1 | 65.1% | +48.3% |
| BUTLER, KEVIN C | 1 | 89.5% | +8.8% |
| BURKE, THOMAS P | 1 | 43.8% | +23.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18819304 | ARTICLE AND METHOD FOR ACCURATELY POSITIONING OPTICAL TIP-TIMING PROBE | BUTLER, KEVIN C | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 8d overdue |
| 19251142 | FAN BLADE OR VANE WITH IMPROVED BIRD IMPACT CAPABILITY | ZAMORA ALVAREZ, ERIC J | — |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | WAITS, ALAN B | — |
| 18826313 | COATING PROTECTION FOR STATOR VANES AND METHODS OF PROTECTION THEREOF | WANG, XIAOBEI | — |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | WIEHE, NATHANIEL EDWARD | — |
| 18504812 | BLENDED N-DOT AND RATIO UNIT REFERENCE ACCELERATION CONTROL ARCHITECTURE FOR GAS TURBINE ENGINE | AMAR, MARC J | — |
| 18484679 | POWDER EXTRACTION TOOL | SIDDIQUI, ADIL ABDUL WAJID | — |
| 18326233 | AUTOMATIC ADJUSTMENT OF PARAMETERS BASED ON PART SURFACE REFLECTIVE INDEX FOR POINT CLOUD ACQUISITION USING A BLUE LIGHT SCANNER | MAHROUKA, WASSIM | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19065009 | HYDROGEN TURBINE POWER ASSISTED CONDENSATION | MEILLER, SEAN V | 35d overdue |
| 18919910 | GAS TURBINE ENGINE WITH ELECTRICALLY DRIVEN COMPRESSOR | MEADE, LORNE EDWARD | 15d |
| 19251142 | FAN BLADE OR VANE WITH IMPROVED BIRD IMPACT CAPABILITY | ZAMORA ALVAREZ, ERIC J | — |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | WAITS, ALAN B | — |
| 18953181 | CERAMIC MATRIX COMPOSITE SURFACE ROUGHNESS | HANDVILLE, BRIAN | — |
| 18936360 | SEALING FOR ANODIZED METAL | DUMBRIS, SETH M | — |
| 18826313 | COATING PROTECTION FOR STATOR VANES AND METHODS OF PROTECTION THEREOF | WANG, XIAOBEI | — |
| 18774437 | STAGED BLADE INJECTOR | BURKE, THOMAS P | — |
| Client (Assignee) | Pending OAs |
|---|---|
| RTX | 35 |
| University of Rhode Island Board of Trustees | 1 |
| Art Unit | Apps |
|---|---|
| 3741 | 5 |
| 3745 | 3 |
| 1784 | 2 |
| 1759 | 2 |
| 3617 | 1 |
| 3700 | 1 |
| 1789 | 1 |
| 2119 | 1 |
| 2662 | 1 |
| 1735 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19251142 | FAN BLADE OR VANE WITH IMPROVED BIRD IMPACT CAPABILITY | Rtx Corporation | ZAMORA ALVAREZ, ERIC J | 3745 | §102§112 | Non-Final OA | — | Pending | Jun 26, 2025 |
| 19065009 | HYDROGEN TURBINE POWER ASSISTED CONDENSATION | Rtx Corporation | MEILLER, SEAN V | 3741 | §103 | Non-Final OA | 35d overdue | Pending | Feb 27, 2025 |
| 19013550 | ROLLER BEARING COMPLIANT RACEWAY UNDERCUT | Pratt & Whitney Canada Corp. | WAITS, ALAN B | 3617 | §102§103§112 | Non-Final OA | — | Pending | Jan 08, 2025 |
| 18953181 | CERAMIC MATRIX COMPOSITE SURFACE ROUGHNESS | Rtx Corporation | HANDVILLE, BRIAN | §102 | Non-Final OA | — | Pending | Nov 20, 2024 | |
| 18936360 | SEALING FOR ANODIZED METAL | Rtx Corporation | DUMBRIS, SETH M | §103 | Non-Final OA | — | Pending | Nov 04, 2024 | |
| 18919910 | GAS TURBINE ENGINE WITH ELECTRICALLY DRIVEN COMPRESSOR | Rtx Corporation | MEADE, LORNE EDWARD | 3741 | §103 | Final Rejection | 15d | Pending | Oct 18, 2024 |
| 18826313 | COATING PROTECTION FOR STATOR VANES AND METHODS OF PROTECTION THEREOF | Rtx Corporation | WANG, XIAOBEI | 1784 | §102§103§112 | Final Rejection | — | Pending | Sep 06, 2024 |
| 18819304 | ARTICLE AND METHOD FOR ACCURATELY POSITIONING OPTICAL TIP-TIMING PROBE | Rtx Corporation | BUTLER, KEVIN C | §103 | Non-Final OA | — | Pending | Aug 29, 2024 | |
| 18774437 | STAGED BLADE INJECTOR | Rtx Corporation | BURKE, THOMAS P | 3741 | §103 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18761549 | PARTIAL EXIT CENTRIFUGAL COMPRESSOR | Pratt & Whitney Canada Corp. | MEILLER, SEAN V | 3741 | §103 | Non-Final OA | — | Pending | Jul 02, 2024 |
| 18677543 | COOLING FEATURES FOR A COMPONENT OF A GAS TURBINE ENGINE | Rtx Corporation | KIM, SANG K | 3745 | §103 | Final Rejection | — | Pending | May 29, 2024 |
| 18441453 | GAS TURBINE ENGINE CONFIGURATION FOR CONTAINMENT TESTING | Pratt & Whitney Canada Corp. | WONG, ELTON K | 3745 | §103 | Non-Final OA | — | Pending | Feb 14, 2024 |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | Rtx Corporation | WIEHE, NATHANIEL EDWARD | 3700 | §103§112 | Final Rejection | — | Pending | Jan 31, 2024 |
| 18411216 | HIGH TEMPERATURE FIBER, METHOD OF MAKING AND HIGH TEMPERATURE FIBER COMPOSITES | Rtx Corporation | SALVATORE, LYNDA | 1789 | §102 | Final Rejection | — | Pending | Jan 12, 2024 |
| 18528989 | COMPRESSOR INNER AIR SEAL AND METHOD OF MAKING | Rtx Corporation | COLLISTER, ELIZABETH A | 1784 | §103 | Final Rejection | — | Pending | Dec 05, 2023 |
| 18504812 | BLENDED N-DOT AND RATIO UNIT REFERENCE ACCELERATION CONTROL ARCHITECTURE FOR GAS TURBINE ENGINE | Pratt & Whitney Canada Corp. | AMAR, MARC J | 3741 | §103§112 | Non-Final OA | — | Pending | Nov 08, 2023 |
| 18387534 | ADDITIVE MANUFACTURED COMPONENT INCLUDING WITNESS LINES | Rtx Corporation | KABIR, SAAD M | 2119 | §103 | Non-Final OA | — | Pending | Nov 07, 2023 |
| 18493470 | HYBRID BEARING FORGED FLANGE | Rtx Corporation | KESSLER, CHRISTOPHER S | 1759 | §102§103§112DP | Non-Final OA | — | Pending | Oct 24, 2023 |
| 18493458 | HYBRID BEARING FORGED FLANGE | Rtx Corporation | KESSLER, CHRISTOPHER S | 1759 | §102§112DP | Non-Final OA | — | Pending | Oct 24, 2023 |
| 18491300 | DEFECT DEPTH ESTIMATION FROM BORESCOPE IMAGERY | Rtx Corporation | YANG, JIANXUN | 2662 | §103 | Non-Final OA | — | Pending | Oct 20, 2023 |
| 18484679 | POWDER EXTRACTION TOOL | Rtx Corporation | SIDDIQUI, ADIL ABDUL WAJID | 1735 | §102§103 | Non-Final OA | — | Pending | Oct 11, 2023 |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | Rtx Corporation | WEI, ZENGPU | 2197 | §103§112 | Final Rejection | 8d overdue | Pending | Aug 07, 2023 |
| 18326233 | AUTOMATIC ADJUSTMENT OF PARAMETERS BASED ON PART SURFACE REFLECTIVE INDEX FOR POINT CLOUD ACQUISITION USING A BLUE LIGHT SCANNER | Pratt & Whitney Canada Corp. | MAHROUKA, WASSIM | 2665 | §103§112 | Non-Final OA | — | Pending | May 31, 2023 |
| 18194937 | PROBABILISTIC MODEL, SYSTEM AND APPLICATION FOR COMPONENT DESIGN OPTIMIZATION | Raytheon Technologies Corporation | CIRNU, ALEXANDRU | §101§102§103§112 | Non-Final OA | — | Pending | Apr 03, 2023 | |
| 18173348 | METHOD FOR DESIGNING ARCHITECTURE FOR MICROWAVE COMMUNICATION AND POWER NETWORKS | Raytheon Technologies Corporation | HOCKER, JOHN PAUL | 2189 | §101§102§112 | Non-Final OA | — | Pending | Feb 23, 2023 |
| 18168836 | POWER BEAMING OF MICROWAVE RADIATION FOR ANTI-ICING | Raytheon Technologies Corporation | BACHNER, ROBERT G | 2898 | §103 | Non-Final OA | — | Pending | Feb 14, 2023 |
| 18162860 | SELECTIVE HEAT TREATMENT OF METALS USING MULTIPLE INDUCTION HEATING COILS | Rtx Corporation | MORALES, RICARDO D | 1738 | §102§103 | Final Rejection | — | Pending | Feb 01, 2023 |
| 18162851 | SINGLE-STEP PROCESS FOR SELECTIVE HEAT TREATMENT OF METALS USING MULTIPLE HEATING SOURCES | Rtx Corporation | MCGUTHRY BANKS, TIMA MICHELE | 1733 | §112 | Non-Final OA | — | Pending | Feb 01, 2023 |
| 18083976 | SACRIFICIAL YARNS FOR USE IN CERAMIC MATRIX COMPOSITES, METHODS OF MANUFACTURE THEREOF AND ARTICLES COMPRISING THE SAME | Rtx Corporation | AUER, LAURA A | 1783 | §102§103 | Non-Final OA | — | Pending | Dec 19, 2022 |
| 18071141 | INTEGRATED THRUST REVERSER AND BRAKE CONTROL FOR AN AIRCRAFT | Rtx Corporation | HINTON, HENRY R | 3665 | §103§112 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 18071138 | FINAL TAKEOFF SPEED DETERMINATION FOR AN AIRCRAFT | Rtx Corporation | ALKIRSH, AHMED | 3668 | §103 | Final Rejection | — | Pending | Nov 29, 2022 |
| 17992101 | ELECTRICAL CONNECTIVITY TO HIGH TEMPERATURE FILM SENSOR DEVICES | University of Rhode Island Board of Trustees | MANCINI, EVAN THOMAS | 2855 | §103 | Non-Final OA | 62d | Pending | Nov 22, 2022 |
| 17891763 | CENTRALIZED SECURITY APPROVAL FOR DISTRIBUTED DECENTRALIZED CONTROL SYSTEMS FOR AIRCRAFT ENGINES | Raytheon Technologies Corporation | KHADKA, AMIT | 2432 | §103 | Final Rejection | — | Pending | Aug 19, 2022 |
| 17738513 | WELD REPAIR SYSTEM | Raytheon Technologies Corporation | LIU, CHRIS Q | 3761 | §102§112 | Final Rejection | — | Pending | May 06, 2022 |
| 17132215 | METHOD FOR METAL VAPOR INFILTRATION OF CMC PARTS AND ARTICLES CONTAINING THE SAME | Rtx Corporation | TUROCY, DAVID P | 1718 | §112 | Non-Final OA | 70d overdue | Pending | Dec 23, 2020 |
| 16723360 | REINFORCED CERAMIC MATRIX COMPOSITE AND METHOD OF MANUFACTURE | UNITED TECHNOLOGIES CORPORATION | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Dec 20, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial