Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
141 pending office actions • 49 art units • 111 examiners • 0 of 141 (0%) have an AI response strategy ready • 418 patents granted in the last 365 days
RTX Corporation currently has 142 pending office actions within the Medical Devices & Mechanical Engineering technology area. These actions are distributed among 109 distinct examiners, which is a smaller number than the total 142 pending office actions. The portfolio involves 47 distinct art units, suggesting a broad technical scope for the company's filings. BURKE, THOMAS P is the busiest examiner, currently overseeing 5 pending office actions.
The 109 distinct examiners involved indicate that many examiners are responsible for more than one case for the company. This wide distribution across 47 distinct art units requires the company to manage diverse procedural requirements within Medical Devices & Mechanical Engineering. BURKE, THOMAS P, with 5 pending office actions, holds a higher individual workload than the other distinct examiners. Practitioners should monitor the 142 pending office actions for consistency across the 47 distinct art units.
The 47 distinct art units represent a significant range of technical examination standards that the company must meet. With 142 pending office actions, the volume of work is substantial relative to the 5 pending office actions assigned to BURKE, THOMAS P. Understanding the specific preferences of the 109 distinct examiners is crucial for successful prosecution across the portfolio.
Based on the USPTO statutory response window for each pending office action. 29 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 29 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (1%) |
| §101 + other | 7 (5%) |
| §103 only | 55 (39%) |
| §102 only | 9 (6%) |
| §112 only | 7 (5%) |
| Double-patenting + other | 1 (1%) |
| Multi-statute (no §101) | 61 (43%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BURKE, THOMAS P | 5 | 43.9% | +21.7% |
| KANG, EDWIN G | 4 | 64.3% | +66.9% |
| NGUYEN, ANDREW H | 3 | 75.1% | +42.5% |
| GAMBETTA, KELLY M | 3 | 71.8% | +33.1% |
| KIM, TAE JUN | 3 | 64.0% | +25.7% |
| GROSSO, GREGORY CHAD | 3 | 72.2% | +18.6% |
| LISOWSKI, JACEK | 3 | 66.1% | +40.4% |
| CHRISTENSEN, DANIELLE M | 2 | 79.4% | +11.3% |
| HANDVILLE, BRIAN | 2 | 51.4% | +28.9% |
| DUMBRIS, SETH M | 2 | 76.4% | +16.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18640938 | MONITORING FUEL PHASE IN AIRCRAFT POWERPLANT FUEL SYSTEM | KIM, TAE JUN | 46d overdue |
| 18742742 | FAN EXIT GUIDE VANE THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRICS | GOLIK, ARTHUR PAUL | 22d overdue |
| 18628194 | CORES FOR CERAMIC MATRIX COMPOSITE COMPONENTS | WOO, JONATHAN BRIAN | 22d overdue |
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 15d overdue |
| 18643622 | THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM | STANEK, KELSEY L | 8d overdue |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 8d overdue |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 8d overdue |
| 18493599 | PRE-SHAPED SPACE FILLERS FOR SMALL CROSS SECTION FEATURES | IMANI, ELIZABETH MARY COLE | 7d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18640938 | MONITORING FUEL PHASE IN AIRCRAFT POWERPLANT FUEL SYSTEM | KIM, TAE JUN | 46d overdue |
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 15d overdue |
| 18238197 | MONITORING BREAKTHROUGH OF ELECTRICAL DISCHARGE MACHINING ELECTRODE THROUGH A WORKPIECE | LISOWSKI, JACEK | 3d overdue |
| 18770950 | FUEL CELL EXHAUST CONDENSATION WITH TURBOMACHINERY WATER AUGMENTATION USING CRYOGENIC BOTTOMING CYCLE | BURKE, THOMAS P | 20d |
| 18422343 | INTERMEDIATE CASE FOR AIRCRAFT PROPULSION SYSTEM HOUSING | KIM, TAE JUN | 27d |
| 18496615 | ADDITIVE CLOCKED FUEL INJECTOR BOLT | KANG, EDWIN G | 41d |
| 19297470 | Turbine Engine Centerbody Generator | BURKE, THOMAS P | — |
| 19276685 | GEARED TURBOFAN WITH OVERSPEED PROTECTION | NGUYEN, ANDREW H | — |
| Art Unit | Apps |
|---|---|
| 3741 | 27 |
| 3745 | 14 |
| 2855 | 6 |
| 1784 | 5 |
| 3799 | 4 |
| 3726 | 3 |
| 1754 | 3 |
| 1733 | 3 |
| 1712 | 2 |
| 1735 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19335646 | Aircraft Heat Exchanger | NGUYEN, ANDREW H | 3741 | §103§112 | Final Rejection | 15d overdue | Pending | Sep 22, 2025 |
| 19307354 | DATA RETRIEVAL SYSTEM WITH CONTROLLED ACCESS BASED UPON SECURITY LEVELS | MCFARLAND-BARNES, KELAH JANAE | 2431 | §102§103§112 | Non-Final OA | — | Pending | Aug 22, 2025 |
| 19297470 | Turbine Engine Centerbody Generator | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Aug 12, 2025 |
| 19276685 | GEARED TURBOFAN WITH OVERSPEED PROTECTION | NGUYEN, ANDREW H | — | §101§112DP | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19269241 | GAS TURBINE ENGINE WITH HIGH SPEED LOW PRESSURE TURBINE SECTION AND BEARING SUPPORT FEATURES | SUTHERLAND, STEVEN M | 3752 | §103Other | Final Rejection | — | Pending | Jul 15, 2025 |
| 19244382 | Metallic Substrate Laser Treatment | PENNY, TABATHA L | 1712 | §103§112 | Non-Final OA | — | Pending | Jun 20, 2025 |
| 19240619 | MACHINABLE COATING WITH THERMAL PROTECTION | CHRISTENSEN, DANIELLE M | 3745 | §103 | Final Rejection | — | Pending | Jun 17, 2025 |
| 19237498 | VARIABLE THICKNESS COATING CONTROL | FISHER, WESLEY LE | 3745 | §102§103 | Final Rejection | 19d | Pending | Jun 13, 2025 |
| 19225706 | GAS TURBINE ENGINE WITH BYPASS TOBI COOLING/PURGE FLOW AND METHOD | FORD, RENE D | — | §102 | Non-Final OA | — | Pending | Jun 02, 2025 |
| 19065752 | HOLLOW FAN BLADE WITH SOLID STATE ADDITIVE MANUFACTURED COVER SKIN | RIBADENEYRA, THEODORE C | 3745 | §103 | Final Rejection | — | Pending | Feb 27, 2025 |
| 19053703 | LOW PRESSURE TURBINE SHAFT INSTALLATION TOOL | BESLER, CHRISTOPHER JAMES | 3726 | §102§112 | Non-Final OA | — | Pending | Feb 14, 2025 |
| 19036670 | COLD SPRAYING COATING ONTO TURBINE ENGINE COMPONENT | EMPIE, NATHAN H | 1712 | §102§103§112 | Final Rejection | — | Pending | Jan 24, 2025 |
| 19034716 | HIGH TEMPERATURE COMPOSITE MATERIALS WITH EROSION RESISTANT SEAL COAT | DAGENAIS, KRISTEN A | — | §103 | Non-Final OA | — | Pending | Jan 23, 2025 |
| 19024324 | GAS TURBINE ENGINE FRONT SECTION | SUNG, GERALD LUTHER | 3741 | §112Other | Non-Final OA | — | Pending | Jan 16, 2025 |
| 19024014 | SPECIAL TOOLING FOR FABRICATING VANES | TENTONI, LEO B | 1742 | §102§103 | Final Rejection | — | Pending | Jan 16, 2025 |
| 19021830 | Turbine Engine Cold Section Vane Stage | LEGENDRE, CHRISTOPHER RYAN | 3711 | §102§103 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 19014903 | AIRCRAFT PROPULSION SYSTEM WITH ELECTRIC MACHINE SYSTEM COOLING CIRCUIT | NGUYEN, HOANG M | 3746 | §102§103 | Final Rejection | — | Pending | Jan 09, 2025 |
| 18980869 | ATTACHMENT FOR MOUNTING AIRCRAFT PROPULSION SYSTEM TO PYLONG STRUCTURE | MCDUFFIE, MICHAEL D | 3632 | §102§103 | Final Rejection | — | Pending | Dec 13, 2024 |
| 18977558 | MACHINING COMPONENT USING SCAN DATA OF INTERNAL ARTIFACT(S) | BEKELE, MEKONEN T | 2699 | §103 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18973613 | ALUMINUM-CHROMIUM OXIDE COATING AND METHOD THEREFOR | GAMBETTA, KELLY M | — | §103 | Non-Final OA | — | Pending | Dec 09, 2024 |
| 18966996 | GAS TURBINE ENGINE WITH ADAPTIVE TURBINE COOLING AIR SYSTEM AND METHOD | BURKE, THOMAS P | 3741 | §103 | Final Rejection | — | Pending | Dec 03, 2024 |
| 18953181 | CERAMIC MATRIX COMPOSITE SURFACE ROUGHNESS | HANDVILLE, BRIAN | — | §102 | Non-Final OA | — | Pending | Nov 20, 2024 |
| 18937866 | VARIABLE DAMPING IN COMPOSITE MATERIAL | GAITONDE, MEGHA MEHTA | — | §102§103§112 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18936360 | SEALING FOR ANODIZED METAL | DUMBRIS, SETH M | — | §103 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18933565 | METHOD OF REDUCING SADDLE CLAMP ASSEMBLY STRESS | MEILLER, SEAN V | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18933412 | ADDITIVE FAN EXIT GUIDE VANE STRUCTURE WITH ACOUSTIC CAPABILITY | CHRISTENSEN, DANIELLE M | 3745 | §103 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18933287 | SLIDABLE LINERS IN FAN EXIT GUIDE VANE STRUCTURE | HAGHIGHIAN, BEHNOUSH | 3745 | §103 | Final Rejection | — | Pending | Oct 31, 2024 |
| 18927563 | THERMAL MANAGEMENT SYSTEM FOR OPEN ROTOR AIRCRAFT PROPULSION SYSTEM | KIM, TAE JUN | 3799 | §103 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18923015 | HYDROGEN ASSISTED COMBUSTION AND ENGINE COOLING | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18919910 | GAS TURBINE ENGINE WITH ELECTRICALLY DRIVEN COMPRESSOR | MEADE, LORNE EDWARD | 3741 | §103 | Non-Final OA | 15d | Pending | Oct 18, 2024 |
| 18920170 | LOCAL GAS PATH DRIVEN PASSIVE PURGE FOR OPTICAL PROBE | KO, JASON Y | 1711 | §112 | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18917255 | CMC COMPONENT WITH COOLING CAVITY COVER PLATE | BUI, ANDREW THANH | 3745 | §103 | Final Rejection | — | Pending | Oct 16, 2024 |
| 18914363 | DISTORTION-FREE MANUFACTURING OF LARGE TITANIUM INTEGRALLY BLADED ROTORS | AFZALI, SARANG | 3726 | §103§112 | Non-Final OA | — | Pending | Oct 14, 2024 |
| 18902382 | ADDITIVELY MANUFACTURED HEAT EXCHANGER SUPPORTS AND METHOD OF MANUFACTURE | RUPPERT, ERIC S | 3763 | §102§103 | Non-Final OA | — | Pending | Sep 30, 2024 |
| 18898289 | APPARATUS AND RELATED METHODS FOR FRICTION STIR ADDITIVE MANUFACTURING REPAIR OF MATERIALS | STONER, KILEY SHAWN | 1735 | §103 | Non-Final OA | — | Pending | Sep 26, 2024 |
| 18884816 | FUEL NOZZLE THERMAL MANAGEMENT SYSTEM | HARRINGTON, ALYSON JOAN | 3741 | §103 | Non-Final OA | — | Pending | Sep 13, 2024 |
| 18884728 | CERAMIC COATINGS WITH SINTERING AGENTS | SAMPLE, DAVID R | 1784 | §103§112 | Final Rejection | — | Pending | Sep 13, 2024 |
| 18826313 | COATING PROTECTION FOR STATOR VANES AND METHODS OF PROTECTION THEREOF | WANG, XIAOBEI | 1784 | §103 | Final Rejection | — | Pending | Sep 06, 2024 |
| 18821214 | APPARATUS AND RELATED METHOD(S) FOR REPAIRING MACHINE PARTS | COOK, KYLE A | 3726 | §112 | Final Rejection | — | Pending | Aug 30, 2024 |
| 18819304 | ARTICLE AND METHOD FOR ACCURATELY POSITIONING OPTICAL TIP-TIMING PROBE | BUTLER, KEVIN C | — | §103 | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18784580 | COMPACT TRAVERSING SYSTEMS FOR PROBES OR OTHER DEVICES | COOK, WILLIAM J | 3618 | §103§112 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18775501 | HIGH TEMPERATURE FIBER AND METHOD OF MAKING | FIGUEROA, JOHN J | — | §102 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18774708 | GEARBOX ARRANGEMENT FOR DUAL SPOOL ENGINE ACCESSORIES | SEBASCO CHENG, STEPHANIE | 3741 | §103 | Final Rejection | 20d | Pending | Jul 16, 2024 |
| 18774437 | STAGED BLADE INJECTOR | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18771561 | TWO PIECE HOLLOW-VANE ASSEMBLY CLEANING SYSTEM | RIVERA-CORDERO, ARLYN I | 1714 | §103 | Final Rejection | 34d | Pending | Jul 12, 2024 |
| 18770830 | MULTIPLE HEAT SOURCE CRYOGENIC BOTTOMING CYCLE SEQUENCING AND ROUTING | NG, HENRY | 3741 | §103§112 | Non-Final OA | — | Pending | Jul 12, 2024 |
| 18770950 | FUEL CELL EXHAUST CONDENSATION WITH TURBOMACHINERY WATER AUGMENTATION USING CRYOGENIC BOTTOMING CYCLE | BURKE, THOMAS P | 3741 | §103 | Non-Final OA | 20d | Pending | Jul 12, 2024 |
| 18770854 | CRYOGENIC BOTTOMING CYCLE UTILIZING A THERMAL BUS WITH MULTIPLE HEAT SOURCES | NG, HENRY | 3741 | §103 | Final Rejection | — | Pending | Jul 12, 2024 |
| 18765812 | AIRCRAFT ENGINE INLET MONITORING USING NEUROMORPHIC SENSORS | NIMOX, RAYMOND LONDALE | — | §101 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18758524 | POWDER BED FUSION ADDITIVE PRINTER RECOATER FOR UNIFORM POWDER PACKING | GROSSO, GREGORY CHAD | — | §102§103 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18758500 | POWDER BED FUSION ADDITIVE PRINTER BUILD PLATFORM DRIVE MECHANISM | GROSSO, GREGORY CHAD | — | §102§103§112 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18758555 | SHROUDED BUILD PLATE FOR POWDER BED FUSION ADDITIVE PRINTER | GROSSO, GREGORY CHAD | — | §103 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18758571 | POWDER BED FUSION ADDITIVE PRINTER RECOATER FOR UNIFORM POWDER PACKING | WOO, JONATHAN BRIAN | 1754 | §103 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18755043 | METHOD FOR AUTOMATED GRAIN MAPPING | LEE, SARAH YEO | 2616 | §103 | Final Rejection | 8d overdue | Pending | Jun 26, 2024 |
| 18749491 | Tie Shaft Leakage Control | HTAY, AYE SU MON | 3745 | §103 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18748021 | SLURRY INFILTRATION WITH FREEZE DRYING AND GELLING FOR MORE UNIFORM DISTRIBUTION OF PARTICULATE MATERIAL | GAMBETTA, KELLY M | 1718 | §103 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18742742 | FAN EXIT GUIDE VANE THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRICS | GOLIK, ARTHUR PAUL | 3745 | §103§112 | Non-Final OA | 22d overdue | Pending | Jun 13, 2024 |
| 18738228 | SYSTEM AND METHOD TO DRESS A COATING USING LASER DOPPLER VIBROMETER | DAVIS-HOLLINGTON, OCTAVIA L | 2855 | §102 | Non-Final OA | — | Pending | Jun 10, 2024 |
| 18734494 | GAS TURBINE ENGINE WITH SPLIT VARIABLE FAN EXIT GUIDE VANES AND AIRFLOW RADIAL TOTAL PRESSURE PROFILE RE-DISTRIBUTION | DELRUE, BRIAN CHRISTOPHER | 3745 | §102§103§112 | Non-Final OA | — | Pending | Jun 05, 2024 |
| 18680640 | ACTUATABLE GUIDE TUBE FOR ELECTRONIC INSPECTION SCOPE | DAVIS-HOLLINGTON, OCTAVIA L | 2855 | §102§103 | Non-Final OA | — | Pending | May 31, 2024 |
| 18680577 | METHOD FOR INSPECTING A POWERPLANT COMPONENT | KAY, DOUGLAS | — | §101§103§112 | Non-Final OA | — | Pending | May 31, 2024 |
| 18678769 | DAMAGE RESISTANT CERAMIC MATRIX COMPOSITES | LOUIE, MANDY C | 1788 | §103DP | Non-Final OA | — | Pending | May 30, 2024 |
| 18678693 | DAMAGE RESISTANT CERAMIC MATRIX COMPOSITES | GAMBETTA, KELLY M | 1718 | §103 | Final Rejection | — | Pending | May 30, 2024 |
| 18677543 | COOLING FEATURES FOR A COMPONENT OF A GAS TURBINE ENGINE | KIM, SANG K | 3745 | §103 | Non-Final OA | — | Pending | May 29, 2024 |
| 18672203 | MACHINING HARMONICS DISRUPTOR | WILLIAMS, THOMAS J | — | §102§112 | Non-Final OA | — | Pending | May 23, 2024 |
| 18671877 | ABRADABLE COATING | WIESE, NOAH S | — | §103 | Non-Final OA | — | Pending | May 22, 2024 |
| 18670203 | ADAPTER FOR PROBE PURGE AND COOLING | MERCADO, ALEXANDER A | 2855 | §103§112 | Non-Final OA | — | Pending | May 21, 2024 |
| 18668649 | ULTRASONIC NEEDLE INSERTION OF PREFORMS | THROWER, LARRY W | 1754 | §103 | Final Rejection | — | Pending | May 20, 2024 |
| 18666245 | HOT STOP APERTURE FIXTURES FOR THERMAL IMAGING MEASUREMENTS | LIN, ERICA S Y | 2853 | §102 | Non-Final OA | — | Pending | May 16, 2024 |
| 18661858 | ACTIVE DAMPER FOR MACHINE SPINDLES | SNYDER, ALAN W | 3722 | §103 | Non-Final OA | — | Pending | May 13, 2024 |
| 18662506 | METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE | LAU, TUNG S | — | §101§102§103§112 | Non-Final OA | — | Pending | May 13, 2024 |
| 18659943 | METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE | RIVERA VARGAS, MANUEL A | — | §102 | Non-Final OA | — | Pending | May 09, 2024 |
| 18658446 | INSPECTING INTERNAL POWERPLANT COMPONENT USING INSPECTION SCOPE | HUANG, DAVID Z | 2855 | §102§103§112 | Non-Final OA | — | Pending | May 08, 2024 |
| 18657164 | INSPECTING INTERNAL POWERPLANT COMPONENT USING INSPECTION SCOPE | MACCHIAROLO, PETER J | 2855 | §102 | Non-Final OA | — | Pending | May 07, 2024 |
| 18656184 | METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE | CORDERO, LINA M | — | §101§103 | Non-Final OA | — | Pending | May 06, 2024 |
| 18656146 | METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE | ZAYKOVA-FELDMAN, LYUDMILA | — | §101§103 | Non-Final OA | — | Pending | May 06, 2024 |
| 18655798 | AUTOMATED ENGINE BLADE INSPECTION METHODS AND SYSTEM | CHAN, CAROL WANG | 2672 | §103 | Final Rejection | 27d | Pending | May 06, 2024 |
| 18653721 | MEASUREMENT AND MONITORING OF ROTOR STACK LOAD IN ENGINE | BRYANT, CHRISTIAN THOMAS | — | §101§102§103 | Non-Final OA | — | Pending | May 02, 2024 |
| 18647646 | SIEVE RDE INJECTOR WITH VARIABLE PRESSURE DROP CAPABILITY | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18644846 | PROCESS CONTROL METHOD AND APPARATUS | HAY, GRANT DAVID | 3723 | §103§112Other | Non-Final OA | — | Pending | Apr 24, 2024 |
| 18643622 | THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM | STANEK, KELSEY L | 3741 | §103§112 | Non-Final OA | 8d overdue | Pending | Apr 23, 2024 |
| 18640211 | BOTTOMING CYCLE FOR POWER GENERATION AND ENGINE THERMAL MANAGEMENT | HARRINGTON, ALYSON JOAN | 3741 | §103 | Non-Final OA | — | Pending | Apr 19, 2024 |
| 18640938 | MONITORING FUEL PHASE IN AIRCRAFT POWERPLANT FUEL SYSTEM | KIM, TAE JUN | 3799 | §103§112 | Non-Final OA | 46d overdue | Pending | Apr 19, 2024 |
| 18634390 | PROXIMITY ROTATIONAL ANGULAR MEASUREMENT | ISHIZUKA, YOSHIHISA | — | §102§103 | Non-Final OA | — | Pending | Apr 12, 2024 |
| 18632725 | METHODS FOR REMOVING DAMAGE WITHIN A FINITE ELEMENT MODEL OF A COMPONENT | HARTMAN JR, RONALD D | 2119 | §103 | Non-Final OA | — | Pending | Apr 11, 2024 |
| 18630718 | INSPECTING INTERNAL POWERPLANT COMPONENT USING PIEZOELECTRIC DEVICE | KIRKLAND III, FREDDIE | 2855 | §103 | Final Rejection | — | Pending | Apr 09, 2024 |
| 18628162 | PRODUCTION OF SILICON CARBIDE PARTICLES | FIGUEROA, JOHN J | — | §102 | Non-Final OA | — | Pending | Apr 05, 2024 |
| 18628472 | MULTI-CONSTITUENT ENVIRONMENTAL BARRIER COATING | LA VILLA, MICHAEL EUGENE | 1783 | §102§103§112 | Non-Final OA | — | Pending | Apr 05, 2024 |
| 18628243 | ENVIRONMENTAL BARRIER COATINGS | CHEN, BRET P | 1784 | §103 | Non-Final OA | — | Pending | Apr 05, 2024 |
| 18628194 | CORES FOR CERAMIC MATRIX COMPOSITE COMPONENTS | WOO, JONATHAN BRIAN | 1754 | §103§112 | Final Rejection | 22d overdue | Pending | Apr 05, 2024 |
| 18627109 | ADAPTIVE MACHINING TO REDUCE PART DISTORTION AFTER FORGING | MERCADO VARGAS, ARIEL | 2118 | §102§103 | Non-Final OA | — | Pending | Apr 04, 2024 |
| 18618761 | ELECTRIC COMPRESSOR STAGE FOR A GAS TURBINE ENGINE | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Mar 27, 2024 |
| 18613210 | POWER AND THERMAL MANAGEMENT SYSTEM AIR CYCLE MACHINE ELECTRIC POWER BOOST TO REDUCE HIGH PRESSURE COMPRESSOR BLEED FLOW | THOMAS, KYLE ROBERT | 3741 | §103§112 | Non-Final OA | — | Pending | Mar 22, 2024 |
| 18607896 | BIPOLAR PLATE FOR METAL-AIR/LIQUID BATTERIES | LYNCH, VICTORIA HOM | — | §102§103§112 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18591945 | CUTTING TOOL SUPPORT FOR IN-SITU HOLE MANUFACTURING | LONG, ROBERT FRANKLIN | 3731 | §102§103§112 | Non-Final OA | 29d | Pending | Feb 29, 2024 |
| 18444137 | CERAMIC COMPONENT | STEELE, JENNIFER A | 1789 | §103 | Non-Final OA | — | Pending | Feb 16, 2024 |
| 18442808 | LOCAL PART MASKING FOR IMPROVED UNIFORMITY IN CERAMIC MATRIX COMPOSITES | CHEN, KEATH T | 1716 | §103 | Final Rejection | 70d | Pending | Feb 15, 2024 |
| 18433567 | ALTERNATE LUBRICATION MECHANISMS FOR VEHICLE BEARINGS LUBRICANT DISPENSER | KIM, SANG K | 3745 | §102§103§112 | Non-Final OA | — | Pending | Feb 06, 2024 |
| 18433561 | OIL LUBRICATION FAN PERSUADER | PILKINGTON, JAMES | 3617 | §112Other | Non-Final OA | 67d overdue | Pending | Feb 06, 2024 |
| 18428738 | CERAMIC ABRADABLE COATING WITH CONTROLLABLE HARDNESS AND ABRADABILITY | WIEHE, NATHANIEL EDWARD | 3700 | §103§112 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18424259 | ENGINEERED RESIDUAL STRESS STATE FOR ENHANCED PERFORMANCE DURING DIRECTED ENERGY DEPOSITION REPAIR PROCESS | FORD, DARRELL CHRISTOPHER | 3700 | §102§103 | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18424314 | USE OF SACRIFICIAL SURFACE DURING DIRECTED ENERGY DEPOSITION REPAIR PROCESS | STONER, KILEY SHAWN | 1735 | §103 | Final Rejection | 42d | Pending | Jan 26, 2024 |
| 18424369 | HYBRID ADDITIVE MANUFACTURING REPAIR WITH POWDER BED FUSION FEATURE AND DIRECTED ENERGY DEPOSITION JOINING | JANSSEN, REBECCA | 1733 | §103§112Other | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18424200 | SURFACE PREPARATION TO REDUCE HEAT AFFECTED ZONE CRACKING DURING DIRECTED ENERGY DEPOSITION REPAIR OF CAST COMPONENTS | CHABREYRIE, RODOLPHE ANDRE | — | §102§103 | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18424230 | ADDITIVE MANUFACTURING REMOVAL AND REPLACEMENT OF FEATURE TO ENABLE ACCESS DURING DIRECTED ENERGY DEPOSITION REPAIR PROCESS | JANSSEN, REBECCA | — | §102§103 | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18422343 | INTERMEDIATE CASE FOR AIRCRAFT PROPULSION SYSTEM HOUSING | KIM, TAE JUN | 3799 | §102§103 | Final Rejection | 27d | Pending | Jan 25, 2024 |
| 18406442 | ORCHESTRATOR FOR OPTIMIZING HPC COMPUTTING JOB ALLOCATION | EWALD, JOHN ROBERT DAKITA | 2199 | §103 | Final Rejection | — | Pending | Jan 08, 2024 |
| 18528989 | COMPRESSOR INNER AIR SEAL AND METHOD OF MAKING | COLLISTER, ELIZABETH A | 1784 | §103 | Non-Final OA | — | Pending | Dec 05, 2023 |
| 18511167 | HIGH PERFORMANCE AUXILIARY POWER UNIT WITH TEMPERATURE CONTROLLED BLEED DEVICE | MALATEK, KATHERYN A | 3741 | §102§103 | Non-Final OA | — | Pending | Nov 16, 2023 |
| 18509529 | SLIDER SEAL OF GAS TURBINE ENGINE | REITZ, MICHAEL K. | 3745 | §103§112 | Final Rejection | — | Pending | Nov 15, 2023 |
| 18386381 | TURBINE COOLING AIR PRESSURE BOOST SYSTEM | NGUYEN, ANDREW H | 3741 | §103§112 | Non-Final OA | — | Pending | Nov 02, 2023 |
| 18496475 | VARIABLE Z-CHANNEL HOLE PATTERN | TROCHE, EDGAREDMANUE | 1744 | §102§103 | Final Rejection | — | Pending | Oct 27, 2023 |
| 18496615 | ADDITIVE CLOCKED FUEL INJECTOR BOLT | KANG, EDWIN G | 3741 | §103 | Non-Final OA | 41d | Pending | Oct 27, 2023 |
| 18494854 | METHOD FOR ADDITIVELY MANUFACTURED PROCESS-EQUIVALENT TEST SPECIMENS | MCGUTHRY BANKS, TIMA MICHELE | 1733 | §112 | Final Rejection | — | Pending | Oct 26, 2023 |
| 18383362 | DAMPED FLUID LINE FOR AIRCRAFT ENGINE | LEARY, JOSHUA DENNIS | 3753 | §103 | Final Rejection | 41d | Pending | Oct 24, 2023 |
| 18493599 | PRE-SHAPED SPACE FILLERS FOR SMALL CROSS SECTION FEATURES | IMANI, ELIZABETH MARY COLE | 1789 | §103§112 | Final Rejection | 7d | Pending | Oct 24, 2023 |
| 18492191 | COMPONENT CORROSION PROGNOSTICS USING COMPUTED TOMOGRAPHY (CT)-SCAN AND METHODS | FAYE, MAMADOU | 2884 | §103 | Final Rejection | 25d overdue | Pending | Oct 23, 2023 |
| 18491300 | DEFECT DEPTH ESTIMATION FROM BORESCOPE IMAGERY | YANG, JIANXUN | 2662 | §103 | Non-Final OA | — | Pending | Oct 20, 2023 |
| 18467866 | EDGE HIGHLIGHTING FOR LIGHTWEIGHT VIEWER | BEG, SAMAH A | — | §102 | Non-Final OA | — | Pending | Sep 15, 2023 |
| 18467807 | TABBED USER INTERFACE FOR LIGHTWEIGHT VIEWER | RODRIGUEZ, DANIEL | — | §101§103Other | Non-Final OA | — | Pending | Sep 15, 2023 |
| 18465259 | THERMAL SPRAY POWDER AND COATED ARTICLE | DUMBRIS, SETH M | 1784 | §112 | Non-Final OA | — | Pending | Sep 12, 2023 |
| 18464792 | PROXIMITY MEASUREMENT BETWEEN SEAL ELEMENTS OF A GAS TURBINE ENGINE | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | — | Pending | Sep 11, 2023 |
| 18238214 | MULTI-PROCESS MACHINING OF A WORKPIECE | LISOWSKI, JACEK | 3741 | §102§103 | Final Rejection | — | Pending | Aug 25, 2023 |
| 18238051 | OPTICAL DEFECT DETECTION SYSTEM | KIDWELL, KAITLYN ELIZABETH | 2877 | §103§112 | Non-Final OA | 27d | Pending | Aug 25, 2023 |
| 18238197 | MONITORING BREAKTHROUGH OF ELECTRICAL DISCHARGE MACHINING ELECTRODE THROUGH A WORKPIECE | LISOWSKI, JACEK | 3741 | §103 | Non-Final OA | 3d overdue | Pending | Aug 25, 2023 |
| 18453071 | INSITU BUILD POWDER CHARACTERIZATION FOR POWDER BED FUSION | UTECH, BENJAMIN L | 1700 | §102§103 | Final Rejection | — | Pending | Aug 21, 2023 |
| 18366129 | REMOTE UPDATES OF A GAS TURBINE ENGINE | WEI, ZENGPU | 2197 | §103§112 | Non-Final OA | 8d overdue | Pending | Aug 07, 2023 |
| 18363644 | AIRFOIL WITH SEQUENCED FIBER LAYUP | GROSS, CARSON | 1700 | §102§103 | Final Rejection | — | Pending | Aug 01, 2023 |
| 18345848 | MELT POOL PROCESS USING NEUROMORPHIC SENSORS | CAI, CHARLES J | 2115 | §103§112 | Final Rejection | 20d | Pending | Jun 30, 2023 |
| 18340740 | FAULT DETECTION AND LOAD MANAGEMENT IN A SERIES HYBRID PROPULSION SYSTEM | LISOWSKI, JACEK | 3741 | §103 | Final Rejection | — | Pending | Jun 23, 2023 |
| 18340341 | METHOD TO DECREASE ACOUSTIC SIGNATURE OF A HYBRID ELECTRIC PROPULSION SYSTEM | AMAR, MARC J | 3741 | §103§112 | Final Rejection | 12d | Pending | Jun 23, 2023 |
| 18331699 | MULTI INSTRUMENT EGRESS FOR GAS TURBINE ENGINE | NAVARRO, HUGO IVAN | 2858 | §103§112 | Non-Final OA | 35d | Pending | Jun 08, 2023 |
| 18126774 | SPLIT CASE STRUCTURE FOR A GAS TURBINE ENGINE | LAMBERT, WAYNE A | 3745 | §103 | Non-Final OA | 19d | Pending | Mar 27, 2023 |
| 18162851 | SINGLE-STEP PROCESS FOR SELECTIVE HEAT TREATMENT OF METALS USING MULTIPLE HEATING SOURCES | MCGUTHRY BANKS, TIMA MICHELE | 1733 | §112 | Non-Final OA | — | Pending | Feb 01, 2023 |
| 18083861 | GAS TURBINE ROTOR COMPONENT AND METHOD OF MANUFACTURE | WALTERS, RYAN J | 3799 | §103 | Non-Final OA | — | Pending | Dec 19, 2022 |
| 18071138 | FINAL TAKEOFF SPEED DETERMINATION FOR AN AIRCRAFT | ALKIRSH, AHMED | 3668 | §103 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 18071141 | INTEGRATED THRUST REVERSER AND BRAKE CONTROL FOR AN AIRCRAFT | HINTON, HENRY R | 3665 | §103§112 | Non-Final OA | — | Pending | Nov 29, 2022 |
| 17881968 | COMPOSITE FAN BLADE AIRFOIL, METHODS OF MANUFACTURE THEREOF AND ARTICLES COMPRISING THE SAME | HANDVILLE, BRIAN | 1783 | §103§112 | Non-Final OA | — | Pending | Aug 05, 2022 |
| 17586326 | HYBRID ELECTRIC SINGLE ENGINE DESCENT RESTART | AMAR, MARC J | 3741 | §102§103§112 | Final Rejection | 8d overdue | Pending | Jan 27, 2022 |
| 17514371 | REACTIVE THERMAL BARRIER COATING | JACKSON, MONIQUE R | 1787 | §103 | Non-Final OA | — | Pending | Oct 29, 2021 |
| 16844683 | COOLING SYSTEM FOR A GAS TURBINE ENGINE | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Apr 09, 2020 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial