Prosecution Insights
Last updated: April 19, 2026

Kinney & Lange, P.A. (Schneider Electric Usa)

16 pending office actions • 7 clients

Portfolio Summary

16
Total Pending OAs
4
Final Rejections
12
Non-Final OAs

Client Portfolio (7 clients)

Client (Assignee)Pending OAs
Schneider Electric It Corporation 7
Schneider Electric Industries SAS 3
Schneider Electric Industries SAS 2
Schneider Electric 1
Schneider Electric Buildings Americas, Inc. 1
Schneider Electric Systems Usa, Inc. 1
Dc Systems B.V. 1

Pending Office Actions

App #TitleClientExaminerArt UnitStatusFiled
35525988 Equipment for control of electric power Schneider Electric Industries SAS MELVIN, BRYAN NOLAN 2971 Non-Final OA Apr 22, 2025
35525966 Equipment for control of electric power Schneider Electric Industries SAS MELVIN, BRYAN NOLAN 2971 Non-Final OA Apr 22, 2025
18794231 LEVELING FOOT ASSEMBLY FOR EQUIPMENT RACK Schneider Electric It Corporation HAWN, PATRICK D 3631 Non-Final OA Aug 05, 2024
18760087 NOVEL HIGH EFFICIENCY LINE INTERACTIVE UPS Schneider Electric It Corporation ROSARIO BENITEZ, GUSTAVO A 2838 Non-Final OA Jul 01, 2024
18753315 FLEXIBLE DATA PIPELINE FOR DATA STORAGE Schneider Electric Industries SAS HALM, KWEKU WILLIAM 2166 Non-Final OA Jun 25, 2024
18597043 MOTOR DRIVEN BACKFEED PROTECTION AND INCIDENT REDUCTION ON MODULAR STATIC BYPASS Schneider Electric It Corporation SAEED, AHMED M 2831 Non-Final OA Mar 06, 2024
18594306 MANIFOLD AND METHODS TO IMPLEMENT LIQUID COOLING IN AN UNINTERRUPTIBLE POWER SUPPLY Schneider Electric It Corporation ALONZO MILLER, RHADAMES J 2847 Non-Final OA Mar 04, 2024
18538305 FASTENER ASSEMBLY Schneider Electric UPCHURCH, DAVID M 3677 Non-Final OA Dec 13, 2023
18533434 BIOMETRIC ACCESS TO PROGRAMMABLE AUTOMATION CONTROLLER Schneider Electric Industries SAS LIPMAN, JACOB 2434 Final Rejection Dec 08, 2023
18527481 AUXILIARY SIDE RACK Schneider Electric It Corporation GARFT, CHRISTOPHER 3632 Final Rejection Dec 04, 2023
18528103 MODULAR CONTAINERIZED UPS Schneider Electric It Corporation CAVALLARI, DANIEL 2836 Final Rejection Dec 04, 2023
18526184 SYSTEMS AND METHODS FOR LOAD HARMONIC SUPPRESSION Schneider Electric It Corporation PHAM, DUC M 2849 Non-Final OA Dec 01, 2023
18498115 APPARATUSES, SYSTEMS, AND METHODS FOR PROVIDING ACCESS RIGHTS MANAGEMENT IN A BUILDING GRAPH Schneider Electric Buildings Americas, Inc. TRAN, NAM T 2455 Non-Final OA Oct 31, 2023
18378564 MANAGEMENT SYSTEM FOR INFRASTRUCTURE OF AN INDUSTRIAL SYSTEM Schneider Electric Systems Usa, Inc. ALAM, ROKEYA SHAWALI 2118 Non-Final OA Oct 10, 2023
18133014 DROOP CONTROL IN A DC OPERATED SYSTEM Dc Systems B.V. PARRIES, DRU M 2836 Final Rejection Apr 11, 2023
18104824 SECURED CONTAINER DEPLOYMENT Schneider Electric Industries SAS PAULINO, LENIN 2197 Non-Final OA Feb 02, 2023

Managing Kinney & Lange, P.A. (Schneider Electric Usa)'s Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month