Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems
50 pending office actions • 27 clients • 48 examiners • 23 art units • 0 of 50 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 9 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 9 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 5 (10%) |
| §103 only | 16 (32%) |
| §102 only | 2 (4%) |
| §112 only | 2 (4%) |
| Multi-statute (no §101) | 25 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| ADDIE, RAYMOND W | 2 | 81.1% | +8.5% |
| LOVE, TREVOR M | 2 | 43.0% | +26.7% |
| KELLY, CATHERINE A | 1 | 60.3% | +27.7% |
| MAKI, STEVEN D | 1 | 65.1% | +25.0% |
| BOLOGNA, DOMINIC JOSEPH | 1 | 83.8% | +11.8% |
| TROOST, AARON L | 1 | 74.7% | +10.5% |
| GAYE, SAMBA NMN | 1 | 63.5% | +34.9% |
| LEWIS-TAYLOR, DAYTON A. | 1 | 81.1% | +2.7% |
| HESS, DOUGLAS A | 1 | 88.8% | +10.7% |
| PAQUETTE, SEDEF ESRA AYALP | 1 | 63.5% | +45.5% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18464324 | CURING MACHINE | ADDIE, RAYMOND W | 20d |
| 19052445 | METHOD TO PROVIDE RELIABLE CAN BUS DATA | LEWIS-TAYLOR, DAYTON A. | — |
| 18626647 | Slipform Paver | ADDIE, RAYMOND W | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18722716 | MOTORCYCLE WITH RADAR DEVICE | AN, IG TAI | 30d overdue |
| 18866117 | Folding table | ING, MATTHEW W | 7d |
| 18265463 | METHOD FOR MANUFACTURING AN INHALABLE POWDER COMPRISING VORICONAZOLE | HAGHIGHATIAN, MINA | 29d |
| 19157911 | Closure Device | KELLY, CATHERINE A | — |
| 19169100 | MULTIFUNCTIONAL DEVICE, SYSTEM, AND METHOD FOR MONITORING CREPED PRODUCT QUALITY AND BLADE WEAR | BOLOGNA, DOMINIC JOSEPH | — |
| 19097412 | Methods and Systems of Assigning Trips to Vehicles | TROOST, AARON L | — |
| 19081182 | AIR CIRCULATORY SYSTEM WITH ERV, HEATER, AND AIR CONDITION SYSTEM | GAYE, SAMBA NMN | — |
| 19046690 | Mobile stockpile conveyor | HESS, DOUGLAS A | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18289378 | COMPOSITION COMPRISING GRAPHENE FOR THE TREATMENT OF TEXTILE ARTICLES AND TEXTILE ARTICLES TREATED | LOVE, TREVOR M | 83d |
| 19157911 | Closure Device | KELLY, CATHERINE A | — |
| 19149262 | TIRE FOR PASSENGER CAR | MAKI, STEVEN D | — |
| 19169100 | MULTIFUNCTIONAL DEVICE, SYSTEM, AND METHOD FOR MONITORING CREPED PRODUCT QUALITY AND BLADE WEAR | BOLOGNA, DOMINIC JOSEPH | — |
| 19097412 | Methods and Systems of Assigning Trips to Vehicles | TROOST, AARON L | — |
| 19081182 | AIR CIRCULATORY SYSTEM WITH ERV, HEATER, AND AIR CONDITION SYSTEM | GAYE, SAMBA NMN | — |
| 19046690 | Mobile stockpile conveyor | HESS, DOUGLAS A | — |
| 19038773 | TREAD WITH HIGH DRAINAGE | PAQUETTE, SEDEF ESRA AYALP | — |
| Art Unit | Apps |
|---|---|
| 3637 | 4 |
| 1749 | 2 |
| 1611 | 2 |
| 3724 | 2 |
| 3619 | 1 |
| 3642 | 1 |
| 3662 | 1 |
| 1761 | 1 |
| 3663 | 1 |
| 3725 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19157911 | Closure Device | Samet Kalip Ve Madeni Esya Sanayi Ve Ticaret A.S. | KELLY, CATHERINE A | 3619 | §102§103 | Non-Final OA | — | Pending | Aug 19, 2025 |
| 19149262 | TIRE FOR PASSENGER CAR | Bridgestone Corporation | MAKI, STEVEN D | 1749 | §103 | Non-Final OA | — | Pending | Jul 18, 2025 |
| 19169100 | MULTIFUNCTIONAL DEVICE, SYSTEM, AND METHOD FOR MONITORING CREPED PRODUCT QUALITY AND BLADE WEAR | Buckman Laboratories International, Inc. | BOLOGNA, DOMINIC JOSEPH | §103§112 | Non-Final OA | — | Pending | Apr 03, 2025 | |
| 19097412 | Methods and Systems of Assigning Trips to Vehicles | Webfleet Solutions B.V. | TROOST, AARON L | §101§103 | Non-Final OA | — | Pending | Apr 01, 2025 | |
| 19081182 | AIR CIRCULATORY SYSTEM WITH ERV, HEATER, AND AIR CONDITION SYSTEM | Joi Holding LLC | GAYE, SAMBA NMN | §102§103§112 | Non-Final OA | — | Pending | Mar 17, 2025 | |
| 19052445 | METHOD TO PROVIDE RELIABLE CAN BUS DATA | Procon Analytics, LLC | LEWIS-TAYLOR, DAYTON A. | §103 | Non-Final OA | — | Pending | Feb 13, 2025 | |
| 19046690 | Mobile stockpile conveyor | Kleemann GmbH | HESS, DOUGLAS A | §102§103 | Non-Final OA | — | Pending | Feb 06, 2025 | |
| 19038773 | TREAD WITH HIGH DRAINAGE | Bridgestone Europe Nv/Sa [Be/Be] | PAQUETTE, SEDEF ESRA AYALP | §103§112 | Non-Final OA | — | Pending | Jan 28, 2025 | |
| 19038324 | Material processing plant and drive for a mobile material processing plant | Kleemann GmbH | IBEKWE, DARLINGTON NDUKA | §103§112 | Non-Final OA | — | Pending | Jan 27, 2025 | |
| 18871874 | Device for ejecting a movable furniture part | Samet Kalip Ve Madeni Esya San Ve Tic. A.S. | ROERSMA, ANDREW MARK | 3637 | §102§103§112 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18871900 | Device for ejecting a movable furniture part | Samet Kalip Ve Madeni Esya San Ve Tic. A.S. | ROHRHOFF, DANIEL J | 3637 | §102 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18871911 | Arrangement With Two Devices For Ejecting A Movable Furniture Part | Samet Kalip Ve Madeni Esya San Ve Tic. A.S. | WRIGHT, KIMBERLEY S | 3637 | §102§103 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18866117 | Folding table | Störiko Product Design GmbH | ING, MATTHEW W | 3637 | §102§103 | Final Rejection | 7d | Pending | Nov 15, 2024 |
| 18865077 | Hard-metal protection for landsides | Betek GmbH & Co. Kg | BEHRENS, ADAM J | §103 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18922313 | ANACARDIC ACID FOR INFLAMMATORY CONDITIONS | VANDERBILT UNIVERSITY | OH, TAYLOR V | §112 | Non-Final OA | — | Pending | Oct 21, 2024 | |
| 18921066 | Apparatuses, Systems, and Methods for Providing Dynamic Content | Klickafy, LLC | ORR, HENRY W | §103§112 | Non-Final OA | — | Pending | Oct 21, 2024 | |
| 18843292 | MOBILE WEED CONTROL/ DESUCKERING EQUIPMENT | Spezia S.r.l. | CALLAWAY, SPENCER THOMAS | 3642 | §103 | Non-Final OA | 73d overdue | Pending | Sep 02, 2024 |
| 18821781 | ROLLER ASSIST AND LIFT FOR TIRE CHANGING MACHINE | The Coats Company, LLC | THOMAS, DAVID B | §103 | Non-Final OA | — | Pending | Aug 30, 2024 | |
| 18815068 | MODULAR SENSOR INTEGRATION SYSTEM WITH SELECTABLE SENSOR MODULES | Buckman Laboratories International, Inc. | WANG, HARRY Z | §102§103 | Non-Final OA | — | Pending | Aug 26, 2024 | |
| 18809525 | MONITORING DEVICE FOR A SLIPFORM PAVER FOR MONITORING THE COMPACTION OF CONCRETE AND METHOD FOR MONITORING THE COMPACTION OF CONCRETE DURING THE OPERATION OF A SLIPFORM PAVER | Wirtgen GmbH | RISIC, ABIGAIL ANNE | §102 | Non-Final OA | — | Pending | Aug 20, 2024 | |
| 18836443 | TIRE CAVITY RESONANCE NOISE ABSORBER | Bridgestone Europe Nv/Sa [Be/Be] | BOOTH, ALEXANDER D | 1749 | §103 | Final Rejection | — | Pending | Aug 07, 2024 |
| 18796266 | ANACARDIC ACID FOR NEURAL REPAIR | VANDERBILT UNIVERSITY | JUSTICE, GINA CHIEUN YU | §101DP | Non-Final OA | — | Pending | Aug 06, 2024 | |
| 18791426 | LIFTING SYSTEM AND METHODS OF USE THEREOF | The Coats Company, LLC | SHAKERI, HADI | §103 | Non-Final OA | — | Pending | Aug 01, 2024 | |
| 18722716 | MOTORCYCLE WITH RADAR DEVICE | Piaggio & C. S.p.A. | AN, IG TAI | 3662 | §103§112 | Non-Final OA | 30d overdue | Pending | Jun 21, 2024 |
| 18719293 | GRANULAR COMPOSITION CONTAINING GRAPHENE AND A PARTICULATE MATERIAL, AND METHOD FOR PRODUCING IT | Directa Plus S.p.A. | NGUYEN, HAIDUNG D | 1761 | §103 | Final Rejection | 31d overdue | Pending | Jun 13, 2024 |
| 18719405 | APPARATUS AND METHODS FOR CALCULATING AND/OR MONITORING A TIRE WEAR RATE OF A TIRE | Bridgestone Europe Nv/Sa [Be/Be] | CHALHOUB, JEFFREY ROBERT | 3663 | §103 | Non-Final OA | — | Pending | Jun 13, 2024 |
| 18664677 | Coffee Bean Grinder | Ricco Rosini | DICKSTEIN, WILLIAM DOUGLAS | 3725 | §102§103 | Final Rejection | — | Pending | May 15, 2024 |
| 18653913 | SYSTEM AND METHOD FOR TARGETING DIGITAL CONTENT AT PRODUCT TERMINALS USING REFERENCE DATA | Newsbreak Media Networks, Inc. | POUNCIL, DARNELL A | 3622 | §103 | Non-Final OA | 35d | Pending | May 02, 2024 |
| 18653921 | SYSTEM AND METHOD FOR TARGETING DIGITAL CONTENT AT PRODUCT TERMINALS USING REFERENCE DATA | Newsbreak Media Networks, Inc. | BEKERMAN, MICHAEL | 3621 | §103 | Non-Final OA | — | Pending | May 02, 2024 |
| 18703519 | RUBBER COMPOSITIONS | Bridgestone Europe Nv/Sa [Be/Be] | WOODWARD, ANA LUCRECIA | §112 | Non-Final OA | — | Pending | Apr 22, 2024 | |
| 18699912 | RUBBER COATING FOR RADIOFREQUENCY IDENTIFICATION DEVICES FOR TIRES | Bridgestone Europe Nv/Sa [Be/Be] | FISCHER, JUSTIN R | §102§103 | Non-Final OA | — | Pending | Apr 10, 2024 | |
| 18626647 | Slipform Paver | Wirtgen GmbH | ADDIE, RAYMOND W | §103 | Non-Final OA | — | Pending | Apr 04, 2024 | |
| 18698486 | SADDLE-RIDE MOTORCYCLE OF SCOOTER TYPE WITH HYBRID PROPULSION | Piaggio & C. S.p.A. | WEHRLY, CHRISTOPHER B | 3611 | §102§103 | Final Rejection | — | Pending | Apr 04, 2024 |
| 18624992 | Two-Phase Adhesive Nonstandard COSA Devices | Bvw Holding AG | MEGNA FUENTES, ANTHONY W | 2855 | §102§103§112 | Non-Final OA | — | Pending | Apr 02, 2024 |
| 18623287 | Tissue Scaffold with Patterned Microstructure | Bvw Holding AG | FLORES, ADRIAN | §102§103§112 | Non-Final OA | — | Pending | Apr 01, 2024 | |
| 18686736 | A METHOD TO SYNCHRONIZE THE TIME OF A TIRE-MOUNTED SENSOR TO THE ROAD IMPACT AND MEASURE THE CONTACT PATCH DURATION AND AMPLITUDE | Bridgestone Europe Nv/Sa [Be/Be] | LEE, PAUL D | §101§102§103§112 | Non-Final OA | — | Pending | Feb 26, 2024 | |
| 18569258 | METHOD FOR PRODUCING CATALYSTS FOR HIGH TEMPERATURE CHEMICAL PROCESSES AND CATALYSTS THUS OBTAINED | Nextchem Tech S.P.A | TAYLOR, JORDAN W | §102§103§112 | Non-Final OA | — | Pending | Dec 12, 2023 | |
| 18289378 | COMPOSITION COMPRISING GRAPHENE FOR THE TREATMENT OF TEXTILE ARTICLES AND TEXTILE ARTICLES TREATED | Directa Plus S.p.A. | LOVE, TREVOR M | 1611 | §103 | Non-Final OA | 83d | Pending | Nov 03, 2023 |
| 18286431 | Cemented carbide material | Betek GmbH & Co. Kg | LIANG, ANTHONY M | 1734 | §102§103§112Other | Non-Final OA | — | Pending | Oct 11, 2023 |
| 18286436 | Process for the production of a cemented carbide material having a reinforced binder phase | Betek GmbH & Co. Kg | DUMBRIS, SETH M | 1784 | §103Other | Final Rejection | 27d | Pending | Oct 11, 2023 |
| 18464324 | CURING MACHINE | Wirtgen GmbH | ADDIE, RAYMOND W | 3671 | §103 | Final Rejection | 20d | Pending | Sep 11, 2023 |
| 18207769 | SYSTEM AND METHOD FOR TARGETING DIGITAL CONTENT AT PRODUCT TERMINALS USING REFERENCE DATA | Newsbreak Media Networks, Inc. | TORRICO-LOPEZ, ALAN | 3625 | §101§103§112 | Final Rejection | — | Pending | Jun 09, 2023 |
| 18265463 | METHOD FOR MANUFACTURING AN INHALABLE POWDER COMPRISING VORICONAZOLE | ZAMBON S.P.A. | HAGHIGHATIAN, MINA | 1616 | §103§112 | Final Rejection | 29d | Pending | Jun 06, 2023 |
| 18036626 | POLYESTER-BASED COMPOSITION WITH HIGH BARRIER PROPERTIES AND ARTICLES OF PACKAGING CONTAINING THE SAME | Point Plastic S.r.l. | STONEHOCKER, VIRGINIA LEE | 1766 | §102§103§112 | Final Rejection | — | Pending | May 11, 2023 |
| 18098525 | Methods of Using Peracetic Acid to Treat Poultry in a Chill Tank During Processing | Enviro Tech Chemical Services, Inc. | MCKANE, ELIZABETH L | 3991 | §103§112 | Non-Final OA | — | Pending | Jan 18, 2023 |
| 18013192 | METHOD FOR EXTERIOR NOISE SIMULATION OF A TIRE | Bridgestone Europe Nv/Sa [Be/Be] | MIRABITO, MICHAEL PAUL | 2187 | §101§112 | Non-Final OA | — | Pending | Dec 27, 2022 |
| 18001534 | POWER TOOLS AND METHODS OF OPERATING POWER TOOLS | Festool GmbH | DAVIES, SAMUEL ALLEN | 3724 | §103§112 | Final Rejection | — | Pending | Dec 12, 2022 |
| 17919638 | PLUNGE SAWS WITH CUT INDICATORS AND METHODS OF OPERATING PLUNGE SAWS | Festool GmbH | DO, NHAT CHIEU Q | 3724 | §103 | Final Rejection | — | Pending | Oct 18, 2022 |
| 17852277 | HIGH-CAPACITY DESICCANT BREATHER | Des-Case Corporation | DIETERLE, JENNIFER M | 1776 | §102§103 | Non-Final OA | — | Pending | Jun 28, 2022 |
| 16863775 | MULTIPHASE GEL | Bvw Holding AG | LOVE, TREVOR M | 1611 | §102§103 | Non-Final OA | — | Pending | Apr 30, 2020 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial