43 pending office actions • 5 clients • 43 examiners • 30 art units • 0 of 43 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 10 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 10 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (5%) |
| §103 only | 14 (33%) |
| §102 only | 2 (5%) |
| §112 only | 4 (9%) |
| Multi-statute (no §101) | 20 (47%) |
| No statute on record | 1 (2%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HOTCHKISS, MICHAEL WAYNE | 1 | 69.2% | +51.0% |
| NGUON, VIRAK | 1 | 83.2% | +19.0% |
| TOLIN, MICHAEL A | 1 | 62.9% | +27.0% |
| MCNALLY, DANIEL | 1 | 68.0% | +13.6% |
| KONVES, ADRIANNA N | 1 | 75.9% | +14.5% |
| WOO, JONATHAN BRIAN | 1 | 52.1% | +41.0% |
| TROCHE, EDGAREDMANUE | 1 | 58.4% | +34.9% |
| LU, HUA | 1 | 68.9% | +27.0% |
| GRAVES, TIMOTHY P | 1 | 81.0% | +15.1% |
| MATTHEWS, TERRELL HOWARD | 1 | 83.9% | +11.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19027851 | PORTABLE FABRICATION SYSTEMS AND METHODS USING EXPANDABLE TOOLING | NGUON, VIRAK | — |
| 18667190 | APPARATUSES, SYSTEMS, AND METHODS FOR MANIPULATING PANELS | MATTHEWS, TERRELL HOWARD | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17966327 | METHODS FOR MANUFACTURING COMPOSITE SOLID-STATE ELECTROLYTE MEMBRANES AND SOLID-STATE BATTERIES COMPRISING THE SAME | ARCIERO, ADAM A | 72d overdue |
| 18322724 | OFFSET COLLET LOCK FOR POSITIVE FEED DRILLS AND METHODS FOR DRILLING | TRAVERS, MATTHEW P | 15d overdue |
| 18356427 | ZONAL OPTICAL ELEMENTS | CHANG, AUDREY Y | 16d |
| 19061154 | TWIST-LOCK FASTENERS, ASSEMBLIES, AND METHODS FOR FASTENING | HOTCHKISS, MICHAEL WAYNE | — |
| 19004839 | METHODS AND SYSTEMS FOR REINFORCING ADDITIVELY MANUFACTURED STRUCTURES | TOLIN, MICHAEL A | — |
| 18956859 | SYSTEMS AND METHODS FOR BONDING MATERIALS USING EXPANDABLE TOOLING | MCNALLY, DANIEL | — |
| 18892712 | SYSTEMS AND METHODS FOR COMPACTING CERAMIC COMPOSITE MATERIALS | WOO, JONATHAN BRIAN | — |
| 18734174 | SYSTEMS, APPARATUSES, AND METHODS FOR TESTING CRYOGENIC COUPLINGS | GRAVES, TIMOTHY P | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19061154 | TWIST-LOCK FASTENERS, ASSEMBLIES, AND METHODS FOR FASTENING | HOTCHKISS, MICHAEL WAYNE | — |
| 19027851 | PORTABLE FABRICATION SYSTEMS AND METHODS USING EXPANDABLE TOOLING | NGUON, VIRAK | — |
| 19004839 | METHODS AND SYSTEMS FOR REINFORCING ADDITIVELY MANUFACTURED STRUCTURES | TOLIN, MICHAEL A | — |
| 18956859 | SYSTEMS AND METHODS FOR BONDING MATERIALS USING EXPANDABLE TOOLING | MCNALLY, DANIEL | — |
| 18892757 | CERAMIC COMPOSITE MANUFACTURING SYSTEMS AND METHODS | KONVES, ADRIANNA N | — |
| 18892712 | SYSTEMS AND METHODS FOR COMPACTING CERAMIC COMPOSITE MATERIALS | WOO, JONATHAN BRIAN | — |
| 18892821 | AUTOMATED SYSTEMS AND METHODS FOR MANUFACTURING CERAMIC MATRIX COMPOSITES | TROCHE, EDGAREDMANUE | — |
| 18786871 | SYSTEMS AND METHODS FOR SURFACE FINISHING | LU, HUA | — |
| Client (Assignee) | Pending OAs |
|---|---|
| THE BOEING COMPANY | 39 |
| IQS GROUP s.r.o. | 1 |
| Securiscape Ltd. | 1 |
| Ampcera | 1 |
| THE CURATORS OF THE UNIVERSITY OF MISSOURI | 1 |
| Art Unit | Apps |
|---|---|
| 3726 | 4 |
| 1746 | 2 |
| 1748 | 2 |
| 1784 | 2 |
| 1744 | 2 |
| 1735 | 2 |
| 3722 | 2 |
| 1741 | 1 |
| 1745 | 1 |
| 1754 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19061154 | TWIST-LOCK FASTENERS, ASSEMBLIES, AND METHODS FOR FASTENING | The Boeing Company | HOTCHKISS, MICHAEL WAYNE | 3726 | §102§112 | Non-Final OA | — | Pending | Feb 24, 2025 |
| 19027851 | PORTABLE FABRICATION SYSTEMS AND METHODS USING EXPANDABLE TOOLING | The Boeing Company | NGUON, VIRAK | 1741 | §103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19004839 | METHODS AND SYSTEMS FOR REINFORCING ADDITIVELY MANUFACTURED STRUCTURES | The Boeing Company | TOLIN, MICHAEL A | 1745 | §102§103 | Non-Final OA | — | Pending | Dec 30, 2024 |
| 18956859 | SYSTEMS AND METHODS FOR BONDING MATERIALS USING EXPANDABLE TOOLING | The Boeing Company | MCNALLY, DANIEL | 1746 | §102§103 | Non-Final OA | — | Pending | Nov 22, 2024 |
| 18892757 | CERAMIC COMPOSITE MANUFACTURING SYSTEMS AND METHODS | The Boeing Company | KONVES, ADRIANNA N | 1748 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18892712 | SYSTEMS AND METHODS FOR COMPACTING CERAMIC COMPOSITE MATERIALS | The Boeing Company | WOO, JONATHAN BRIAN | 1754 | §102§103§112 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18892821 | AUTOMATED SYSTEMS AND METHODS FOR MANUFACTURING CERAMIC MATRIX COMPOSITES | The Boeing Company | TROCHE, EDGAREDMANUE | 1759 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18786871 | SYSTEMS AND METHODS FOR SURFACE FINISHING | The Boeing Company | LU, HUA | §103 | Non-Final OA | — | Pending | Jul 29, 2024 | |
| 18734174 | SYSTEMS, APPARATUSES, AND METHODS FOR TESTING CRYOGENIC COUPLINGS | The Boeing Company | GRAVES, TIMOTHY P | 2855 | §102§103 | Non-Final OA | — | Pending | Jun 05, 2024 |
| 18667190 | APPARATUSES, SYSTEMS, AND METHODS FOR MANIPULATING PANELS | The Boeing Company | MATTHEWS, TERRELL HOWARD | 3653 | §103 | Non-Final OA | — | Pending | May 17, 2024 |
| 18634337 | WIRE ASSEMBLY SYSTEMS AND METHODS FOR ASSEMBLING ELECTRICAL RACEWAY MODULES | The Boeing Company | HONG, SEAHEE | 3723 | §102§103§112 | Non-Final OA | — | Pending | Apr 12, 2024 |
| 18615104 | METHODS AND SYSTEMS FOR GENERATING AND USING PREDICTION MODELS FOR ROTATNG MACHINES WITH ROTARY BEARINGS | The Boeing Company | LE, JOHN H | §101§103§112 | Non-Final OA | — | Pending | Mar 25, 2024 | |
| 18610593 | SYSTEMS AND METHODS FOR SHIMLESS ASSEMBLY AND JOINT SPLICES | The Boeing Company | DEONAUTH, NIRVANA | 3726 | §112 | Final Rejection | 15d | Pending | Mar 20, 2024 |
| 18610741 | TUNED MULTILAYERED MATERIAL SYSTEMS AND METHODS FOR MANUFACTURING | The Boeing Company | COLLISTER, ELIZABETH A | 1784 | §102§103Other | Non-Final OA | — | Pending | Mar 20, 2024 |
| 18609988 | WORKFLOW ENGINE FOR PREDICTIVE ASSEMBLY | The Boeing Company | CHOY, PAN G | 3624 | §101§103 | Non-Final OA | — | Pending | Mar 19, 2024 |
| 18606712 | CORE BOLTS, FASTENER SYSTEMS AND METHODS FOR JOINING MULTIPLE SUBSTRATES OF WORKPIECES HAVING WORKING AND BLIND SIDES | The Boeing Company | WONG, JOCK M | §102§103 | Non-Final OA | — | Pending | Mar 15, 2024 | |
| 18606032 | FASTENERS, FASTENING SYSTEMS AND ASSOCIATED ASSEMBLED STRUCTURES AND METHODS | The Boeing Company | FLORES JR, DONALD M | 1781 | §103 | Non-Final OA | — | Pending | Mar 15, 2024 |
| 18596912 | INSULATED SLEEVE CONNECTORS AND METHODS FOR CONNECTING DUCTS | The Boeing Company | DRAGICEVICH, ZACHARY T | 3679 | §102 | Non-Final OA | 23d | Pending | Mar 06, 2024 |
| 18583131 | AIRCRAFT GALLEY, AND METHOD AND APPARATUS FOR CONFIGURING AIRCRAFT GALLEY | The Boeing Company | BONZELL, PHILIP J | 3642 | §103 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18441173 | Core Material Design For A Composite Construction | The Boeing Company | RUMMEL, JULIA L | 1784 | §102§103§112 | Final Rejection | — | Pending | Feb 14, 2024 |
| 18432281 | PRINTED MECHANICAL ANTENNAS AND METHODS FOR MAKING PRINTED MECHANICAL ANTENNAS | The Boeing Company | DUONG, DIEU HIEN | 2845 | §103 | Non-Final OA | 71d | Pending | Feb 05, 2024 |
| 18535154 | METHODS AND MACHINE TOOL ASSEMBLIES FOR PERFORMING OPERATIONS ON WORKPIECES AND GRIPPER ATTACHMENTS FOR MACHINE TOOL ASSEMBLIES | The Boeing Company | DO, NHAT CHIEU Q | 3724 | §103 | Final Rejection | 8d overdue | Pending | Dec 11, 2023 |
| 18527800 | COATED POWDER FOR IMPROVED ADDITIVE MANUFACTURING PARTS | The Boeing Company | KRASNOW, NICHOLAS R | 1744 | §102§103 | Non-Final OA | — | Pending | Dec 04, 2023 |
| 18480329 | SYSTEMS, METHODS, AND APPARATUS FOR LOCATING FAULTS OR CONDITIONS OF SYSTEMS | The Boeing Company | DEMETER, HILINA K | 2617 | §103 | Non-Final OA | 48d | Pending | Oct 03, 2023 |
| 18469033 | METHODS, MIXED RESIN RETENTION ASSEMBLIES, VALVE ASSEMBLIES, AND SYSTEMS FOR INLINE RESIN MIXING | The Boeing Company | MCCARTY, PATRICK M | 1774 | §112 | Non-Final OA | — | Pending | Sep 18, 2023 |
| 18452179 | METHODS AND SYSTEMS FOR FABRICATION OF LAYUP FOR COMPOSITE PART | The Boeing Company | SCHATZ, CHRISTOPHER T | 1746 | §112 | Non-Final OA | — | Pending | Aug 18, 2023 |
| 18450527 | JIGS AND METHODS FOR DRILLING OR REAMING HOLES IN A WORKPIECE | The Boeing Company | YOO, JUN S | 3726 | §103§112 | Non-Final OA | — | Pending | Aug 16, 2023 |
| 18356427 | ZONAL OPTICAL ELEMENTS | Iqs Group S.R.O. | CHANG, AUDREY Y | 2872 | §102§103§112Other | Final Rejection | 16d | Pending | Jul 21, 2023 |
| 18261715 | METHOD FOR RECYCLING ALUMINUM ALLOY SCRAP | The Boeing Company | MERKLING, SALLY ANNE | 1738 | §103§112 | Non-Final OA | — | Pending | Jul 17, 2023 |
| 18322724 | OFFSET COLLET LOCK FOR POSITIVE FEED DRILLS AND METHODS FOR DRILLING | The Boeing Company | TRAVERS, MATTHEW P | 3726 | §102§103§112 | Final Rejection | 15d overdue | Pending | May 24, 2023 |
| 18307104 | SYSTEMS AND METHODS FOR COMPOSITE STRINGER PACKAGE CONSTRUCTION AND COMPACTED STRINGER PACKAGES | The Boeing Company | BEHA, CAROLINE | 1748 | §103 | Final Rejection | 23d overdue | Pending | Apr 26, 2023 |
| 18250093 | VEHICLE SECURITY BARRIER AND SYSTEM FOR HOSTILE VEHICLE MITIGATION | Securiscape Ltd. | RISIC, ABIGAIL ANNE | 3671 | §102 | Final Rejection | 69d | Pending | Apr 21, 2023 |
| 18303701 | METHOD FOR PROCESSING A RAW WORKPIECE INTO A FINAL WORKPIECE | The Boeing Company | HILL, STEPHANI A | 1735 | §103 | Non-Final OA | — | Pending | Apr 20, 2023 |
| 18299172 | COMPLIANT STAMPING TOOLS, SYSTEMS AND METHODS FOR STAMP FORMING A WORKPIECE | The Boeing Company | BARTLETT, VICTORIA | 1744 | §103§112 | Non-Final OA | — | Pending | Apr 12, 2023 |
| 18194904 | SYSTEMS AND METHODS FOR PREDICTIVE ASSEMBLY | The Boeing Company | MARKS, AARIC R | §102§103§112 | Non-Final OA | — | Pending | Apr 03, 2023 | |
| 18160399 | SYSTEMS AND METHODS FOR DRILLING A WORKPIECE | The Boeing Company | WHITMIRE, ERIC DANIEL | 3722 | §102§103§112 | Non-Final OA | — | Pending | Jan 27, 2023 |
| 18101196 | Systems and Methods for Automated Machining a Workpiece | The Boeing Company | CADUGAN, ERICA E | 3722 | §112 | Final Rejection | — | Pending | Jan 25, 2023 |
| 17966327 | METHODS FOR MANUFACTURING COMPOSITE SOLID-STATE ELECTROLYTE MEMBRANES AND SOLID-STATE BATTERIES COMPRISING THE SAME | Ampcera Inc. | ARCIERO, ADAM A | 1727 | §103§112 | Final Rejection | 72d overdue | Pending | Oct 14, 2022 |
| 17897449 | System and Method for Sheet Forming Multiple Parts Using a Common Addendum | The Boeing Company | GAN, CHUEN-MEEI | 2189 | — | Non-Final OA | — | Pending | Aug 29, 2022 |
| 17812240 | FIRE SEALS FOR HIGH TEMPERATURE AND EXTREME ENVIRONMENTS | The Boeing Company | BARRERA, JUAN C | 3752 | §102§103§112 | Final Rejection | — | Pending | Jul 13, 2022 |
| 17808629 | REFRACTORY COMPLEX CONCENTRATED ALLOYS FOR IMPROVED OXIDATION RESISTANCE AND STRUCTURAL STABILITY | The Curators of the University of Missouri | SIDDIQUI, ADIL ABDUL WAJID | 1735 | §103 | Non-Final OA | — | Pending | Jun 24, 2022 |
| 17741289 | THERMOPLASTIC WELDING TOOLING AND ASSOCIATED METHODS | The Boeing Company | RHUE, ABIGAIL H | 3761 | §103§112 | Non-Final OA | — | Pending | May 10, 2022 |
| 17554542 | HEATING OF THERMOPLASTIC INTERLAYERS IN A PREFORM TOOL FOR PRODUCING A PREFORM OF A COMPOSITE MEMBER | The Boeing Company | GRACE, KELSEY C | 1742 | §103 | Non-Final OA | — | Pending | Dec 17, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial