31 pending office actions • 24 art units • 30 examiners • 0 of 31 (0%) have an AI response strategy ready • 90 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 31 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 31 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (6%) |
| §103 only | 27 (87%) |
| §112 only | 2 (6%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KEELING, ALEXANDER W | 2 | 56.3% | +38.1% |
| INGE, JOSEPH N | 1 | 75.0% | +24.5% |
| HARRINGTON, ALYSON JOAN | 1 | 75.0% | +62.6% |
| ALLEN, JEFFREY R | 1 | 47.3% | +26.7% |
| SEABE, JUSTIN D | 1 | 71.5% | +24.6% |
| WILENSKY, MOSHE K | 1 | 75.3% | +15.6% |
| LEE, GILBERT Y | 1 | 78.6% | +10.6% |
| SHEIKH, ASFAND M | 1 | 46.2% | +48.2% |
| PRUITT, JUSTIN A | 1 | 62.5% | +14.8% |
| AFZALI, SARANG | 1 | 73.1% | +45.4% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18014785 | IRRADIATION STRATEGY FOR A COOLABLE, ADDITIVELY MANUFACTURED STRUCTURE | NORTON, JOHN J | 19d |
| 17918264 | DETERMINING THE FLUID DENSITY IN AN ELECTRICAL DEVICE | GIROUX, GEORGE | 23d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19050611 | WELDING METHOD USING COATED ABRASIVE PARTICLES | WILENSKY, MOSHE K | 93d overdue |
| 18025899 | METHOD FOR OPERATING AN ELECTROLYSIS SYSTEM, AND ELECTROLYSIS SYSTEM | KEELING, ALEXANDER W | 16d overdue |
| 18793761 | METHOD FOR CARRYING OUT METHOD FOR IMPLEMENTING ENERGY CONVERSION INSTALLATION SERVICE MEASURES, AND ENERGY CONVERSION INSTALLATION | AFZALI, SARANG | 11d overdue |
| 19108752 | METHODS AND SYSTEM FOR CONTROLLING A TURBINE ENGINE | HARRINGTON, ALYSON JOAN | 5d overdue |
| 18854525 | CONTINUOUS FLOW ENGINE MAINTENANCE SCHEDULING AND PROGNOSIS SYSTEM | SHEIKH, ASFAND M | 2d overdue |
| 19106700 | REDUCED WEIGHT PACKAGING SYSTEM FOR INDUSTRIAL EQUIPMENT | ALLEN, JEFFREY R | 6d |
| 18851710 | GAS TURBINE ENGINE WITH TURBINE VANE CARRIER COOLING FLOW PATH | PRUITT, JUSTIN A | 19d |
| 19120862 | PLANT NETWORK INCLUDING AN ELECTROLYSIS PLANT AND A POWER SUPPLY SOURCE | INGE, JOSEPH N | 26d |
| Art Unit | Apps |
|---|---|
| 1795 | 3 |
| 3741 | 2 |
| 3745 | 2 |
| 3726 | 2 |
| 1733 | 2 |
| 3761 | 2 |
| 2836 | 1 |
| 3733 | 1 |
| 3675 | 1 |
| 3626 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19120862 | PLANT NETWORK INCLUDING AN ELECTROLYSIS PLANT AND A POWER SUPPLY SOURCE | INGE, JOSEPH N | 2836 | §103 | Non-Final OA | 26d | Pending | Apr 14, 2025 |
| 19108752 | METHODS AND SYSTEM FOR CONTROLLING A TURBINE ENGINE | HARRINGTON, ALYSON JOAN | 3741 | §112 | Non-Final OA | 5d overdue | Pending | Mar 05, 2025 |
| 19106700 | REDUCED WEIGHT PACKAGING SYSTEM FOR INDUSTRIAL EQUIPMENT | ALLEN, JEFFREY R | 3733 | §103 | Non-Final OA | 6d | Pending | Feb 26, 2025 |
| 19103612 | TURBINE VANE FOR A GAS TURBINE | SEABE, JUSTIN D | 3745 | §103 | Non-Final OA | 34d | Pending | Feb 13, 2025 |
| 19050611 | WELDING METHOD USING COATED ABRASIVE PARTICLES | WILENSKY, MOSHE K | 3726 | §103 | Final Rejection | 93d overdue | Pending | Feb 11, 2025 |
| 18867456 | SEALING RING HAVING OVERLAPPING SEALING PARTS, AND STATOR ARRANGEMENT HAVING SAME | LEE, GILBERT Y | 3675 | §112 | Final Rejection | 34d | Pending | Nov 20, 2024 |
| 18854525 | CONTINUOUS FLOW ENGINE MAINTENANCE SCHEDULING AND PROGNOSIS SYSTEM | SHEIKH, ASFAND M | 3626 | §103 | Non-Final OA | 2d overdue | Pending | Oct 05, 2024 |
| 18851710 | GAS TURBINE ENGINE WITH TURBINE VANE CARRIER COOLING FLOW PATH | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | 19d | Pending | Sep 27, 2024 |
| 18793761 | METHOD FOR CARRYING OUT METHOD FOR IMPLEMENTING ENERGY CONVERSION INSTALLATION SERVICE MEASURES, AND ENERGY CONVERSION INSTALLATION | AFZALI, SARANG | 3726 | §103 | Non-Final OA | 11d overdue | Pending | Aug 03, 2024 |
| 18833424 | ELECTRODE FIBRE, ELECTRODE, ELECTROLYSIS CELL AND PROCESS FOR PRODUCING THE ELECTRODE FIBRE AND THE ELECTRODE | WILKINS III, HARRY D | 1794 | §103 | Non-Final OA | 40d | Pending | Jul 26, 2024 |
| 18699345 | RADIAL COMPRESSOR | WOLCOTT, BRIAN P | 3711 | §103 | Non-Final OA | 180d overdue | Pending | Apr 08, 2024 |
| 18291321 | VACUUM INTERRUPTER AND ARRANGEMENT COMPRISING VACUUM INTERRUPTERS, AND METHOD FOR TURNING OFF VACUUM INTERRUPTERS | BOLTON, WILLIAM A | 2831 | §103 | Non-Final OA | 42d overdue | Pending | Jan 23, 2024 |
| 18568811 | POWER DEMAND PREDICTION METHOD AND SYSTEM | OGG, DAVID EARL | 2119 | §103 | Non-Final OA | 33d | Pending | Dec 09, 2023 |
| 18383069 | EROSION-RESISTANT CERAMIC MATERIAL, POWDER, SLIP AND COMPONENT | ABU ALI, SHUANGYI | 1731 | §103 | Non-Final OA | 26d | Pending | Oct 24, 2023 |
| 18281810 | ON-DEMAND HYDROGEN FOR POWER GENERATION | IGUE, ROBERTO TOSHIHARU | 3741 | §103 | Non-Final OA | 146d overdue | Pending | Sep 13, 2023 |
| 18274998 | CONTINUOUS FLOW ENGINE SKID COMPONENT SYSTEM | FIGG, TRAVIS M | 1783 | §103 | Final Rejection | 26d overdue | Pending | Jul 29, 2023 |
| 18266595 | ADDITIVELY MANUFACTURED POROUS COMPONENT STRUCTURE AND MEANS FOR MANUFACTURING SAME | JANSSEN, REBECCA | 1733 | §103 | Non-Final OA | 26d overdue | Pending | Jun 12, 2023 |
| 18254427 | PROCESS FOR OPERATING AN ELECTROLYSIS APPARATUS AND ELECTROLYSIS APPARATUS | KEELING, ALEXANDER W | 1795 | §103 | Final Rejection | 34d | Pending | May 25, 2023 |
| 18030864 | COMPUTER-IMPLEMENTED METHOD FOR DETERMINING AN OPERATING PROPERTY OF A PUMPJACK, ANALYSIS DEVICE AND PUMP SYSTEM THEREFOR | KNOX, KALERIA | 2857 | §103 | Non-Final OA | 15d overdue | Pending | Apr 07, 2023 |
| 18029446 | COATED CONDUCTOR IN A HIGH-VOLTAGE DEVICE AND METHOD FOR INCREASING THE DIELECTRIC STRENGTH | HOFFBERG, ROBERT JOSEPH | 2835 | §103 | Non-Final OA | 86d | Pending | Mar 30, 2023 |
| 18025899 | METHOD FOR OPERATING AN ELECTROLYSIS SYSTEM, AND ELECTROLYSIS SYSTEM | KEELING, ALEXANDER W | 1795 | §103 | Non-Final OA | 16d overdue | Pending | Mar 12, 2023 |
| 18044412 | TRANSFORMER | BARNES, MALCOLM | 2837 | §103 | Non-Final OA | 28d overdue | Pending | Mar 08, 2023 |
| 18014785 | IRRADIATION STRATEGY FOR A COOLABLE, ADDITIVELY MANUFACTURED STRUCTURE | NORTON, JOHN J | 3761 | §101 | Non-Final OA | 19d | Pending | Jan 06, 2023 |
| 17923589 | METHOD FOR ADDITIVE MANUFACTURING BY MEANS OF DUAL SELECTIVE IRRADIATION OF A POWDER BED AND PREHEATING | CARPENTER, JOSHUA S | 1733 | §103 | Non-Final OA | 24d overdue | Pending | Nov 06, 2022 |
| 17922181 | FILTER UNIT AND FILTERING METHOD | HE, QIANPING | 1776 | §103 | Non-Final OA | 25d overdue | Pending | Oct 28, 2022 |
| 17919256 | CORROSION PROTECTION IN A CO2 ELECTROLYSIS STACK | WITTENBERG, STEFANIE S | 1795 | §103 | Non-Final OA | 42d overdue | Pending | Oct 15, 2022 |
| 17918264 | DETERMINING THE FLUID DENSITY IN AN ELECTRICAL DEVICE | GIROUX, GEORGE | 2128 | §101 | Final Rejection | 23d | Pending | Oct 11, 2022 |
| 17640683 | NICKEL-BASED ALLOY FOR ADDITIVE MANUFACTURING, METHOD AND PRODUCT | SMITH, CATHERINE P | 1735 | §103 | Non-Final OA | 42d overdue | Pending | Jul 17, 2022 |
| 17787127 | SCANNING STRATEGY FOR VOLUME SUPPORT IN ADDITIVE MANUFACTURING | MILLS JR., JOE E | 3761 | §103 | Non-Final OA | 54d | Pending | Jun 17, 2022 |
| 17437542 | METHOD OF DETECTING MALFUNCTION IN ADDITIVE MANUFACTURING | POLLOCK, AUSTIN M | 1738 | §103 | Non-Final OA | 34d | Pending | Sep 09, 2021 |
| 17275303 | DATA STRUCTURE PRODUCT AND PRODUCT KIT | LIN, JASON | 2117 | §103 | Non-Final OA | 27d | Pending | Mar 11, 2021 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial