26 pending office actions • 18 art units • 25 examiners • 0 of 26 (0%) have an AI response strategy ready • 86 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 26 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 26 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (4%) |
| §103 only | 20 (77%) |
| §102 only | 1 (4%) |
| §112 only | 3 (12%) |
| No statute on record | 1 (4%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| DANIELS, MATTHEW J | 2 | 69.1% | +25.4% |
| KIM, SANG K | 1 | 81.2% | +10.3% |
| ORTEGA, JOSEPH | 1 | 72.5% | +16.0% |
| REID JR, CHARLES H | 1 | 68.6% | +24.0% |
| DARNELL, BAILEIGH K | 1 | 69.7% | +26.1% |
| ADAMS, GREGORY W | 1 | 75.0% | +23.9% |
| KESSIE, DANIEL | 1 | 61.3% | +24.7% |
| MACHNESS, ARIELLA | 1 | 59.7% | +28.4% |
| LAMBERT, WAYNE A | 1 | 62.3% | +23.0% |
| WONG, ELTON K | 1 | 77.9% | +18.6% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19110658 | Auxiliary Power System and Control for Rural and/or off grid Wind Turbines | KIM, SANG K | 8d overdue |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18556464 | MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS | NIMOX, RAYMOND LONDALE | 49d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18908913 | WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE | KESSIE, DANIEL | 175d overdue |
| 18832517 | WIND TURBINE ROTOR BLADE AND WIND TURBINE | LAMBERT, WAYNE A | 117d overdue |
| 18729962 | LIGHTNING RECEPTOR ASSEMBLY | WONG, ELTON K | 80d overdue |
| 18917501 | METHOD FOR STORING AT LEAST ONE PIPE OF A STATIONARY OFFSHORE DEVICE AND STATIONARY OFFSHORE DEVICE | ADAMS, GREGORY W | 26d overdue |
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | ORTEGA, JOSEPH | 9d overdue |
| 19110658 | Auxiliary Power System and Control for Rural and/or off grid Wind Turbines | KIM, SANG K | 8d overdue |
| 18864673 | METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT | DARNELL, BAILEIGH K | 14d |
| 18879864 | MEASURING STRESS OF A WIND TURBINE BLADE AND CONTROLLING THE WIND TURBINE | REID JR, CHARLES H | 27d |
| Art Unit | Apps |
|---|---|
| 3745 | 4 |
| 2834 | 3 |
| 1743 | 2 |
| 1745 | 2 |
| 1742 | 2 |
| 3652 | 1 |
| 2836 | 1 |
| 1714 | 1 |
| 3633 | 1 |
| 3752 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19110658 | Auxiliary Power System and Control for Rural and/or off grid Wind Turbines | KIM, SANG K | 3745 | §112 | Non-Final OA | 8d overdue | Pending | Mar 11, 2025 |
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | ORTEGA, JOSEPH | 2834 | §103 | Non-Final OA | 9d overdue | Pending | Mar 11, 2025 |
| 18879864 | MEASURING STRESS OF A WIND TURBINE BLADE AND CONTROLLING THE WIND TURBINE | REID JR, CHARLES H | 2834 | §102 | Non-Final OA | 27d | Pending | Dec 30, 2024 |
| 18864673 | METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT | DARNELL, BAILEIGH K | 1743 | §103 | Non-Final OA | 14d | Pending | Nov 11, 2024 |
| 18917501 | METHOD FOR STORING AT LEAST ONE PIPE OF A STATIONARY OFFSHORE DEVICE AND STATIONARY OFFSHORE DEVICE | ADAMS, GREGORY W | 3652 | §103 | Non-Final OA | 26d overdue | Pending | Oct 16, 2024 |
| 18908913 | WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE | KESSIE, DANIEL | 2836 | — | Non-Final OA | 175d overdue | Pending | Oct 08, 2024 |
| 18840087 | METHOD OF MANUFACTURING A WIND TURBINE ROTOR BLADE | MACHNESS, ARIELLA | 1743 | §103 | Non-Final OA | 50d | Pending | Aug 21, 2024 |
| 18832517 | WIND TURBINE ROTOR BLADE AND WIND TURBINE | LAMBERT, WAYNE A | 3745 | §103 | Non-Final OA | 117d overdue | Pending | Jul 24, 2024 |
| 18729962 | LIGHTNING RECEPTOR ASSEMBLY | WONG, ELTON K | 3745 | §103 | Final Rejection | 80d overdue | Pending | Jul 18, 2024 |
| 18763271 | METHOD FOR CLEANING A GENERATOR OF A WIND TURBINE | COLEMAN, RYAN L | 1714 | §112 | Non-Final OA | 58d overdue | Pending | Jul 03, 2024 |
| 18721275 | METHOD FOR MANUFACTURING A PREFORM ELEMENT, METHOD FOR MANUFACTURING A WIND TURBINE ROTOR BLADE, AND MOLD ARRANGEMENT | SWANSON, ANDREW L | 1745 | §103 | Non-Final OA | 15d overdue | Pending | Jun 18, 2024 |
| 18716688 | DAMPING DEVICE | HERRING, BRENT W | 3633 | §112 | Non-Final OA | 60d | Pending | Jun 05, 2024 |
| 18708738 | METHOD FOR MANUFACTURING A PREFORM ELEMENT MADE OF PREFORM BUILDING MATERIAL FOR A WIND TURBINE BLADE | DANIELS, MATTHEW J | 1742 | §103 | Final Rejection | 76d | Pending | May 09, 2024 |
| 18706460 | WIND TURBINE WITH A FIRE EXTINGUISHING SYSTEM | ZHOU, QINGZHANG | 3752 | §103 | Non-Final OA | 53d overdue | Pending | May 01, 2024 |
| 18705730 | TRANSITIONING OF WIND TURBINE OPERATION | QUIGLEY, THOMAS K | 2834 | §103 | Final Rejection | 80d overdue | Pending | Apr 29, 2024 |
| 18694832 | WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE | FISHER, WESLEY LE | 3745 | §103 | Non-Final OA | 34d | Pending | Mar 22, 2024 |
| 18686561 | FACILITY ARRANGEMENT AND METHOD FOR CONNECTING TWO OR MORE FACILITIES | ANDRISH, SEAN D | 3678 | §103 | Non-Final OA | 91d overdue | Pending | Feb 26, 2024 |
| 18411283 | PERFORMING DEFORMATION ANALYSIS OF A WIND TURBINE BLADE | SHABMAN, MARK A | 2855 | §103 | Non-Final OA | 13d | Pending | Jan 12, 2024 |
| 18576134 | GANTRY SYSTEM FOR MANUFACTURING A WIND TURBINE BLADE AND METHOD FOR MANUFACTURING A WIND TURBINE BLADE | COOK, KYLE A | 3726 | §103 | Non-Final OA | 121d overdue | Pending | Jan 03, 2024 |
| 18575086 | METHOD FOR MANUFACTURING A ROOT SEGMENT OF A ROTOR BLADE OF A WIND TURBINE | DANIELS, MATTHEW J | 1742 | §103 | Non-Final OA | 82d | Pending | Dec 28, 2023 |
| 18573032 | METHOD FOR MANUFACTURING A PREFORM PART FOR A WIND TURBINE BLADE, PREFORM PART, WIND TURBINE BLADE AND WIND TURBINE | PAGE, HANA C | 1745 | §103 | Non-Final OA | 24d overdue | Pending | Dec 21, 2023 |
| 18563830 | ESTIMATING A SEA STATE OF AN OFFSHORE WIND TURBINE | HAYES, JOVON E | 3615 | §103 | Non-Final OA | 82d | Pending | Nov 22, 2023 |
| 18556464 | MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS | NIMOX, RAYMOND LONDALE | 2857 | §101 | Non-Final OA | 49d overdue | Pending | Oct 20, 2023 |
| 18284665 | METHOD FOR MANUFACTURING PREFORMS FOR A WIND TURBINE BLADE, MANUFACTURING ARRANGEMENT FOR MANUFACTURING PREFORMS FOR A WIND TURBINE BLADE, AND MOULD FOR A MANUFACTURING ARRANGEMENT | NGUON, VIRAK | 1741 | §103 | Non-Final OA | 14d | Pending | Sep 28, 2023 |
| 18278808 | CONTROLLING THE OPERATION OF A POWER PLANT | KARIM, ZIAUL | 2119 | §103 | Final Rejection | 55d | Pending | Aug 24, 2023 |
| 18011871 | LIFTING APPARATUS FOR A LIFTING CRANE | QURESHI, REHMAN AHMED | 3654 | §103 | Non-Final OA | 5d overdue | Pending | Dec 21, 2022 |