Prosecution Insights
Last updated: May 29, 2026

Siemens Gamesa Renewable Energy A/S

26 pending office actions • 18 art units • 25 examiners • 0 of 26 (0%) have an AI response strategy ready • 86 patents granted in the last 365 days

Portfolio Summary

26
Total Pending OAs
20
Non-Final OAs
4
Final Rejections
2
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 26 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

15
Overdue
0
Due this week
4
Due this month
4
Due in next 60 days
3
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 26 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (15)Due ≤ 30 days (4)Due ≤ 60 days (4)Due later (3)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

1
Hard (4%)
21
Medium (81%)
3
Easy (12%)
1
Unknown (4%)

Rejection Statute Mix

BucketCases
§101 only1 (4%)
§103 only20 (77%)
§102 only1 (4%)
§112 only3 (12%)
No statute on record1 (4%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

8
Life Sciences
31% of docket
1
Information Tech
4% of docket
0
Communications
0% of docket
6
Semiconductors
23% of docket
11
Mechanical / Eng
42% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

260 h
Manual time on pending OAs
52 h
Time saved (low, 20%)
91 h
Time saved (mid, 35%)
2.3 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
DANIELS, MATTHEW J 2 69.1% +25.4%
KIM, SANG K 1 81.2% +10.3%
ORTEGA, JOSEPH 1 72.5% +16.0%
REID JR, CHARLES H 1 68.6% +24.0%
DARNELL, BAILEIGH K 1 69.7% +26.1%
ADAMS, GREGORY W 1 75.0% +23.9%
KESSIE, DANIEL 1 61.3% +24.7%
MACHNESS, ARIELLA 1 59.7% +28.4%
LAMBERT, WAYNE A 1 62.3% +23.0%
WONG, ELTON K 1 77.9% +18.6%

Quick Wins (1)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19110658 Auxiliary Power System and Control for Rural and/or off grid Wind Turbines KIM, SANG K 8d overdue

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
18556464 MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS NIMOX, RAYMOND LONDALE 49d overdue

Interview Candidates (11)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18908913 WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE KESSIE, DANIEL 175d overdue
18832517 WIND TURBINE ROTOR BLADE AND WIND TURBINE LAMBERT, WAYNE A 117d overdue
18729962 LIGHTNING RECEPTOR ASSEMBLY WONG, ELTON K 80d overdue
18917501 METHOD FOR STORING AT LEAST ONE PIPE OF A STATIONARY OFFSHORE DEVICE AND STATIONARY OFFSHORE DEVICE ADAMS, GREGORY W 26d overdue
19110461 DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION ORTEGA, JOSEPH 9d overdue
19110658 Auxiliary Power System and Control for Rural and/or off grid Wind Turbines KIM, SANG K 8d overdue
18864673 METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT DARNELL, BAILEIGH K 14d
18879864 MEASURING STRESS OF A WIND TURBINE BLADE AND CONTROLLING THE WIND TURBINE REID JR, CHARLES H 27d

Top Art Units

Art UnitApps
3745 4
2834 3
1743 2
1745 2
1742 2
3652 1
2836 1
1714 1
3633 1
3752 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19110658 Auxiliary Power System and Control for Rural and/or off grid Wind Turbines KIM, SANG K 3745 §112 Non-Final OA 8d overdue Pending Mar 11, 2025
19110461 DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION ORTEGA, JOSEPH 2834 §103 Non-Final OA 9d overdue Pending Mar 11, 2025
18879864 MEASURING STRESS OF A WIND TURBINE BLADE AND CONTROLLING THE WIND TURBINE REID JR, CHARLES H 2834 §102 Non-Final OA 27d Pending Dec 30, 2024
18864673 METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT DARNELL, BAILEIGH K 1743 §103 Non-Final OA 14d Pending Nov 11, 2024
18917501 METHOD FOR STORING AT LEAST ONE PIPE OF A STATIONARY OFFSHORE DEVICE AND STATIONARY OFFSHORE DEVICE ADAMS, GREGORY W 3652 §103 Non-Final OA 26d overdue Pending Oct 16, 2024
18908913 WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE KESSIE, DANIEL 2836 Non-Final OA 175d overdue Pending Oct 08, 2024
18840087 METHOD OF MANUFACTURING A WIND TURBINE ROTOR BLADE MACHNESS, ARIELLA 1743 §103 Non-Final OA 50d Pending Aug 21, 2024
18832517 WIND TURBINE ROTOR BLADE AND WIND TURBINE LAMBERT, WAYNE A 3745 §103 Non-Final OA 117d overdue Pending Jul 24, 2024
18729962 LIGHTNING RECEPTOR ASSEMBLY WONG, ELTON K 3745 §103 Final Rejection 80d overdue Pending Jul 18, 2024
18763271 METHOD FOR CLEANING A GENERATOR OF A WIND TURBINE COLEMAN, RYAN L 1714 §112 Non-Final OA 58d overdue Pending Jul 03, 2024
18721275 METHOD FOR MANUFACTURING A PREFORM ELEMENT, METHOD FOR MANUFACTURING A WIND TURBINE ROTOR BLADE, AND MOLD ARRANGEMENT SWANSON, ANDREW L 1745 §103 Non-Final OA 15d overdue Pending Jun 18, 2024
18716688 DAMPING DEVICE HERRING, BRENT W 3633 §112 Non-Final OA 60d Pending Jun 05, 2024
18708738 METHOD FOR MANUFACTURING A PREFORM ELEMENT MADE OF PREFORM BUILDING MATERIAL FOR A WIND TURBINE BLADE DANIELS, MATTHEW J 1742 §103 Final Rejection 76d Pending May 09, 2024
18706460 WIND TURBINE WITH A FIRE EXTINGUISHING SYSTEM ZHOU, QINGZHANG 3752 §103 Non-Final OA 53d overdue Pending May 01, 2024
18705730 TRANSITIONING OF WIND TURBINE OPERATION QUIGLEY, THOMAS K 2834 §103 Final Rejection 80d overdue Pending Apr 29, 2024
18694832 WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE FISHER, WESLEY LE 3745 §103 Non-Final OA 34d Pending Mar 22, 2024
18686561 FACILITY ARRANGEMENT AND METHOD FOR CONNECTING TWO OR MORE FACILITIES ANDRISH, SEAN D 3678 §103 Non-Final OA 91d overdue Pending Feb 26, 2024
18411283 PERFORMING DEFORMATION ANALYSIS OF A WIND TURBINE BLADE SHABMAN, MARK A 2855 §103 Non-Final OA 13d Pending Jan 12, 2024
18576134 GANTRY SYSTEM FOR MANUFACTURING A WIND TURBINE BLADE AND METHOD FOR MANUFACTURING A WIND TURBINE BLADE COOK, KYLE A 3726 §103 Non-Final OA 121d overdue Pending Jan 03, 2024
18575086 METHOD FOR MANUFACTURING A ROOT SEGMENT OF A ROTOR BLADE OF A WIND TURBINE DANIELS, MATTHEW J 1742 §103 Non-Final OA 82d Pending Dec 28, 2023
18573032 METHOD FOR MANUFACTURING A PREFORM PART FOR A WIND TURBINE BLADE, PREFORM PART, WIND TURBINE BLADE AND WIND TURBINE PAGE, HANA C 1745 §103 Non-Final OA 24d overdue Pending Dec 21, 2023
18563830 ESTIMATING A SEA STATE OF AN OFFSHORE WIND TURBINE HAYES, JOVON E 3615 §103 Non-Final OA 82d Pending Nov 22, 2023
18556464 MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS NIMOX, RAYMOND LONDALE 2857 §101 Non-Final OA 49d overdue Pending Oct 20, 2023
18284665 METHOD FOR MANUFACTURING PREFORMS FOR A WIND TURBINE BLADE, MANUFACTURING ARRANGEMENT FOR MANUFACTURING PREFORMS FOR A WIND TURBINE BLADE, AND MOULD FOR A MANUFACTURING ARRANGEMENT NGUON, VIRAK 1741 §103 Non-Final OA 14d Pending Sep 28, 2023
18278808 CONTROLLING THE OPERATION OF A POWER PLANT KARIM, ZIAUL 2119 §103 Final Rejection 55d Pending Aug 24, 2023
18011871 LIFTING APPARATUS FOR A LIFTING CRANE QURESHI, REHMAN AHMED 3654 §103 Non-Final OA 5d overdue Pending Dec 21, 2022

Managing Siemens Gamesa Renewable Energy A/S's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month