49 pending office actions • 32 clients • 47 examiners • 27 art units • 0 of 49 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 23 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 23 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (2%) |
| §101 + other | 2 (4%) |
| §103 only | 13 (27%) |
| §102 only | 1 (2%) |
| §112 only | 3 (6%) |
| Double-patenting only | 1 (2%) |
| Multi-statute (no §101) | 28 (57%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| TOLAN, EDWARD THOMAS | 2 | 77.9% | +16.3% |
| STILES, JACOB BENJAMIN | 2 | 0.0% | +0.0% |
| WENDMAGEGN, GIRUMSEW | 1 | 76.9% | +21.2% |
| DANGOL, ASHESH | 1 | 69.4% | +49.9% |
| RUSHING-TUCKER, CHINYERE J | 1 | 74.4% | +11.2% |
| TAUFIQ, FARAH N | 1 | 61.8% | +25.6% |
| AWAD, AMR A | 1 | 35.4% | +20.7% |
| ORTIZ-ORTIZ, ALONDRA MICHELLE | 1 | — | — |
| MINOR, AYANNA YVETTE | 1 | 18.8% | +24.9% |
| NELSON, KERI JESSICA | 1 | 58.4% | +41.8% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18302025 | FIRE, EXPLOSION AND LIQUIFACTION PROTECTION SYSTEM | KIM, CHRISTOPHER S | 125d overdue |
| 18285907 | DEVICE AND METHOD FOR CHECKING A MARKING OF A PRODUCT | GARCIA, PAULO ANDRES | 77d overdue |
| 18909042 | LOGISTICS SYSTEM FOR OPTIMISING DELIVERY TIMES | MINOR, AYANNA YVETTE | 52d overdue |
| 18838630 | Sealing arrangement, in particular mechanical seal, preferably for use in coolant units | LEE, GILBERT Y | 44d overdue |
| 18579396 | Roll-changing device for changing the working and/or intermediate rolls of a rolling mill stand | TOLAN, EDWARD THOMAS | 42d overdue |
| 18561245 | Burner | SHIRSAT, VIVEK K | 36d overdue |
| 18500242 | Vacuum device | SOTO, CHRISTOPHER ASHLEY | 23d overdue |
| 18489984 | Hollow sleeper | MCCARRY JR, ROBERT J | 10d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18909042 | LOGISTICS SYSTEM FOR OPTIMISING DELIVERY TIMES | MINOR, AYANNA YVETTE | 52d overdue |
| 18579396 | Roll-changing device for changing the working and/or intermediate rolls of a rolling mill stand | TOLAN, EDWARD THOMAS | 42d overdue |
| 19245545 | CRYOGENIC TANK | DANGOL, ASHESH | 12d |
| 19183994 | Work apparatus | RUSHING-TUCKER, CHINYERE J | 65d |
| 19287877 | SURVEILLANCE SYSTEM | WENDMAGEGN, GIRUMSEW | — |
| 18842547 | CNC MACHINE, DRIVE AND METHOD FOR MACHINING A WORKPIECE | TAUFIQ, FARAH N | — |
| 18982695 | Amusement ride and method for operating an amusement ride | AWAD, AMR A | — |
| 18903726 | COMPRESSION GARMENT | NELSON, KERI JESSICA | — |
| Art Unit | Apps |
|---|---|
| 3725 | 5 |
| 3724 | 2 |
| 3752 | 2 |
| 3762 | 2 |
| 3729 | 2 |
| 1792 | 2 |
| 3642 | 1 |
| 3731 | 1 |
| 3624 | 1 |
| 3786 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19287877 | SURVEILLANCE SYSTEM | Ethersec Industries Ltd. | WENDMAGEGN, GIRUMSEW | DP | Non-Final OA | — | Pending | Aug 01, 2025 | |
| 19245545 | CRYOGENIC TANK | Zero Emissions Aerospace Limited | DANGOL, ASHESH | 3642 | §112 | Final Rejection | 12d | Pending | Jun 23, 2025 |
| 19183994 | Work apparatus | Andreas Stihl AG & Co. KG | RUSHING-TUCKER, CHINYERE J | 3731 | §102§103 | Non-Final OA | 65d | Pending | Apr 21, 2025 |
| 18842547 | CNC MACHINE, DRIVE AND METHOD FOR MACHINING A WORKPIECE | Odecon Engineering GmbH | TAUFIQ, FARAH N | §103 | Non-Final OA | — | Pending | Apr 10, 2025 | |
| 18982695 | Amusement ride and method for operating an amusement ride | Bec GmbH | AWAD, AMR A | §103§112 | Non-Final OA | — | Pending | Dec 16, 2024 | |
| 18871834 | Riveting device, collection container for rivet mandrel remnants and a method for mounting and removing such a collection container | Sfs Group Germany GmbH | ORTIZ-ORTIZ, ALONDRA MICHELLE | 3725 | §102§103 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18909042 | LOGISTICS SYSTEM FOR OPTIMISING DELIVERY TIMES | Weparsa GmbH | MINOR, AYANNA YVETTE | 3624 | §101§102§103§112 | Non-Final OA | 52d overdue | Pending | Oct 08, 2024 |
| 18903726 | COMPRESSION GARMENT | Haddenham Healthcare Ltd. | NELSON, KERI JESSICA | 3786 | §101§102§103§112 | Final Rejection | — | Pending | Oct 01, 2024 |
| 18846906 | AGRICULTURAL IMPLEMENT | Lemken GmbH & Co. Kg | COY, NICOLE A | §102§103 | Non-Final OA | — | Pending | Sep 13, 2024 | |
| 18842104 | SOIL-CULTIVATION DEVICE | Lemken GmbH & Co. Kg | BEHRENS, ADAM J | §103 | Non-Final OA | — | Pending | Aug 28, 2024 | |
| 18838630 | Sealing arrangement, in particular mechanical seal, preferably for use in coolant units | Kaco GmbH + Co. Kg | LEE, GILBERT Y | 3675 | §103§112 | Final Rejection | 44d overdue | Pending | Aug 15, 2024 |
| 18779150 | Device and method for preparing the weld region of the filling tube of a bag | Harro Höfliger Verpackungsmaschinen GmbH | PATEL, VISHAL I | 1746 | §103 | Non-Final OA | — | Pending | Jul 22, 2024 |
| 18762857 | Punching die | Ws Wieländer + Schill Professionelle Karosserie-Spezialwerkzeuge GmbH & Co. Kg | DO, NHAT CHIEU Q | 3724 | §102§103 | Non-Final OA | 36d | Pending | Jul 03, 2024 |
| 18726372 | ABSORBER DEVICE AND DAMPER DEVICE | Industrial Science GmbH Powered By Iav | SAHNI, VISHAL R | §102§103 | Non-Final OA | — | Pending | Jul 02, 2024 | |
| 18754027 | Indoor air quality control system | Sanas, Incorporated | SPAMER, DONALD R | §103 | Non-Final OA | — | Pending | Jun 25, 2024 | |
| 18677963 | Handheld work apparatus | Andreas Stihl AG & Co. KG | PAYER, HWEI-SIU C | 3665 | §103§112 | Non-Final OA | — | Pending | May 30, 2024 |
| 18713651 | Method for operating a rolling line, and computer program product for carrying out the method | SMS Group GmbH | TOLAN, EDWARD THOMAS | 3725 | §112 | Non-Final OA | — | Pending | May 26, 2024 |
| 18656692 | Push-in insert and connector comprising same | Harting Electric Stiftung & Co. Kg | RAHMAN, THASLIMUR | §102§103 | Non-Final OA | — | Pending | May 07, 2024 | |
| 18646233 | End mill | Gühring Kg | FORD, DARRELL CHRISTOPHER | 3726 | §102§103§112 | Final Rejection | — | Pending | Apr 25, 2024 |
| 18701278 | Contact carrier apparatus, connection device, actuator, plug-in connector insert and installation method, and cable connection system | Harting Electric Stiftung & Co. Kg | CHAMBERS, TRAVIS SLOAN | §102§103 | Non-Final OA | — | Pending | Apr 15, 2024 | |
| 18697787 | System for holding back a mandrel rod in a pipe rolling mill, and method for operating said system | SMS Group GmbH | EKIERT, TERESA M | 3725 | §102§112 | Non-Final OA | — | Pending | Apr 02, 2024 |
| 18693376 | Straightening machine and method for straightening | SMS Group GmbH | ALAWADI, MOHAMMED S | 3725 | §112 | Non-Final OA | 30d overdue | Pending | Mar 19, 2024 |
| 18687325 | Assembly for carrying out a discrete Fourier transform | Semron GmbH | ALROBAIE, KHAMDAN N | 2824 | §103§112 | Non-Final OA | — | Pending | Feb 28, 2024 |
| 18579396 | Roll-changing device for changing the working and/or intermediate rolls of a rolling mill stand | SMS Group GmbH | TOLAN, EDWARD THOMAS | 3725 | §102§103 | Final Rejection | 42d overdue | Pending | Jan 15, 2024 |
| 18579340 | Method for recycling Li-ion batteries | SMS Group GmbH | STILES, JACOB BENJAMIN | §103 | Non-Final OA | — | Pending | Jan 13, 2024 | |
| 18578817 | STORAGE AND RETRIEVAL UNIT FOR A HIGH-BAY WAREHOUSE | Amova GmbH | HOLMES, JUSTIN | 3655 | §102 | Non-Final OA | 5d overdue | Pending | Jan 12, 2024 |
| 18570118 | NOVEL PHOSPHONATED FLUOROELASTOMERS (PFKMS), PHOSPHONATED PERFLUOROELASTOMERS (PFFKMS), THEIR PROCESS OF PREPARATION AND USE IN ELECTROMEMBRANE APPLICATIONS | Riva Power Systems GmbH & Co. Kg | TESKIN, FRED M | §102§112 | Non-Final OA | — | Pending | Dec 14, 2023 | |
| 18569782 | CONTAINER LID FOR A CONTAINER, AND METHOD AND APPARATUS FOR FILLING A CONTAINER | System Biologie Deutschland Ug (Haftungsbeschränkt) | LEE, CHEE-CHONG | 3752 | §102§112 | Non-Final OA | 62d | Pending | Dec 13, 2023 |
| 18566734 | NEW PHOSPHONATED NON-FLUORINATED AND PARTIALLY FLUORINATED ARYL POLYMERS FROM SULFONATED ARYL POLYMERS AND NEW POLYMERIC PERFLUOROPHOSPHONIC ACIDS FROM PERFLUOROSULFONIC ACIDS, THEIR PROCESS OF PREPARATION AND USE IN ELECTROMEMBRANE APPLICATIONS | Riva Power Systems GmbH & Co. Kg | KAUCHER, MARK S | §103 | Non-Final OA | — | Pending | Dec 04, 2023 | |
| 18563287 | System and method for producing rod-shaped steels | SMS Group GmbH | JANSSEN, REBECCA | 1733 | §103 | Non-Final OA | — | Pending | Nov 21, 2023 |
| 18561245 | Burner | SMS Group GmbH | SHIRSAT, VIVEK K | 3762 | §102§103 | Final Rejection | 36d overdue | Pending | Nov 15, 2023 |
| 18555685 | Camera module for a burner | SMS Group GmbH | JOHNSON, BENJAMIN W | 3762 | §103 | Final Rejection | 44d overdue | Pending | Nov 15, 2023 |
| 18290360 | Forced air cooling for cooling long steel products | SMS Group GmbH | STILES, JACOB BENJAMIN | 1738 | §103§112 | Non-Final OA | — | Pending | Nov 13, 2023 |
| 18500242 | Vacuum device | Producteers International GmbH | SOTO, CHRISTOPHER ASHLEY | 3723 | §103§112 | Final Rejection | 23d overdue | Pending | Nov 02, 2023 |
| 18557929 | Modeling method | Compredict GmbH | LAU, TUNG S | 2857 | §101 | Non-Final OA | 14d | Pending | Oct 28, 2023 |
| 18489984 | Hollow sleeper | Schwihag AG | MCCARRY JR, ROBERT J | 3615 | §102§103§112 | Non-Final OA | 10d overdue | Pending | Oct 19, 2023 |
| 18554506 | STORAGE FACILITY WITH AISLES THAT CAN BE DRIVEN ALONG | Nedcon B.V. | BARNETT, DEVIN K | 3631 | §103 | Final Rejection | 33d | Pending | Oct 09, 2023 |
| 18285907 | DEVICE AND METHOD FOR CHECKING A MARKING OF A PRODUCT | Rea Elektronik GmbH | GARCIA, PAULO ANDRES | 2669 | §102§103 | Final Rejection | 77d overdue | Pending | Oct 06, 2023 |
| 18376813 | Device for charging battery packs | Andreas Stihl AG & Co. KG | TAYLOR, APRIL ALICIA | §102§112 | Non-Final OA | — | Pending | Oct 04, 2023 | |
| 18037104 | METHOD FOR SELECTIVELY SEPARATING AT LEAST ONE ORGANIC SUBSTANCE COMPRISING AT LEAST ONE APOLAR GROUP, AND USE OF SAID SUBSTANCE IN A FOOD, LUXURY FOOD, COSMETIC, OR PHARMACEUTICAL PRODUCT | Döhler GmbH | HAWKINS, AMANDA SALATA | 1793 | §103 | Final Rejection | — | Pending | May 16, 2023 |
| 18035459 | Multifunctional hand held tool | Harting Electric Stiftung & Co. Kg | TRINH, MINH N | 3729 | §103§112 | Non-Final OA | 7d | Pending | May 04, 2023 |
| 18302025 | FIRE, EXPLOSION AND LIQUIFACTION PROTECTION SYSTEM | Zero Emissions Aerospace Limited | KIM, CHRISTOPHER S | 3752 | §102§112 | Final Rejection | 125d overdue | Pending | Apr 18, 2023 |
| 18030524 | Water dispenser and method for operating same | Bwt Holding GmbH | WEN, KEVIN GUANHUA | 3761 | §103 | Final Rejection | 43d overdue | Pending | Apr 06, 2023 |
| 18027075 | Method for manufacturing an assembly consisting of a plastic tube portion having at least one tube-wire insert and a terminal connector | Raumedic AG | ABRAHAM, JOSE K | 3729 | §103 | Non-Final OA | 17d overdue | Pending | Mar 17, 2023 |
| 18159791 | Handheld work apparatus | Andreas Stihl AG & Co. KG | CORNETT, ROBERT D | 3724 | §103 | Non-Final OA | 19d overdue | Pending | Jan 26, 2023 |
| 18007995 | Dye for Foods, Nutritional Supplements, Cosmetic or Pharmaceutical Products | Döhler GmbH | SILVERMAN, JANICE Y | 1792 | §103§112 | Non-Final OA | — | Pending | Dec 02, 2022 |
| 17993152 | Surgical Instrument | G. Hipp & Sohn GmbH | JAFFRI, ZEHRA | 3771 | §103§112 | Final Rejection | 9d | Pending | Nov 23, 2022 |
| 17802426 | METHOD AND DEVICE FOR PRODUCING A FOOD PRODUCT | Hebenstreit GmbH | LEFF, STEVEN N | 1792 | §102§103 | Final Rejection | 19d | Pending | Oct 31, 2022 |
| 17761832 | Electronic Structure Component for Logically Connecting Qubits | Forschungszentrum Jülich GmbH | WIEGAND, TYLER J | 2812 | §102§103§112 | Non-Final OA | — | Pending | Mar 18, 2022 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial