Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
41 pending office actions • 27 art units • 39 examiners • 0 of 41 (0%) have an AI response strategy ready • 55 patents granted in the last 365 days
Toyoda Gosei Co., Ltd. has 44 pending office actions in Semiconductors, Circuits & Optics. The docket involves 42 examiners across 28 art units, showing that examiner assignments are nearly fully distributed.
AKARAGWE, YANICK A is the busiest examiner, with 2 pending matters. Counsel should emphasize consistent technical positions and art-unit tracking because few matters share the same examiner.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 8 (20%) |
| §102 only | 4 (10%) |
| §112 only | 1 (2%) |
| Double-patenting + other | 2 (5%) |
| Multi-statute (no §101) | 26 (63%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| AKARAGWE, YANICK A | 2 | 83.5% | +11.9% |
| LEE, AHAM NMN | 2 | 47.6% | +55.6% |
| CHIANG, MICHAEL | 1 | 70.7% | +21.8% |
| FRISBY, KEITH J | 1 | 77.6% | +0.9% |
| TRAN, THAI H | 1 | 72.2% | +24.4% |
| MORROW, JASON S | 1 | 84.4% | +10.8% |
| LIBBY, TROY ALAN | 1 | 92.3% | +9.1% |
| WALTERS JR, ROBERT S | 1 | 51.6% | +50.4% |
| LEE, GEOFFREY S | 1 | 60.6% | +20.4% |
| DANIELS, JASON S | 1 | 85.8% | +15.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19077604 | CENTER CONSOLE ASSEMBLIES INCLUDING ELECTRICAL CONNECTION ASSEMBLIES | DANIELS, JASON S | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18900319 | CURTAIN AIRBAG DEVICE | SLITERIS, JOSELYNN Y | 2d overdue |
| 18591157 | LAMINATE | GRUSBY, REBECCA LYNN | 14d |
| 19236580 | AIRBAG STRUCTURE | FRISBY, KEITH J | — |
| 19228169 | RECTIFIER CABLE AND RECTIFIER CONNECTOR | TRAN, THAI H | — |
| 19184194 | ROOF MODULE | MORROW, JASON S | — |
| 19174143 | FRONT STRUCTURE OF VEHICLE AND METHOD FOR ASSEMBLING FRONT STRUCTURE OF VEHICLE | AKARAGWE, YANICK A | — |
| 19085642 | SEAT CUSHION AIR BAG DEVICE AND SEAT CUSHION AIR BAG STRUCTURE | LIBBY, TROY ALAN | — |
| 19066963 | VEHICLE INTERIOR COMPONENT | ESQUIVEL, DENISE LYNNE | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19077118 | ELECTRIC LIQUID PUMP | LEE, GEOFFREY S | 33d |
| 19543950 | STEERING WHEEL | CHIANG, MICHAEL | — |
| 19228169 | RECTIFIER CABLE AND RECTIFIER CONNECTOR | TRAN, THAI H | — |
| 19184194 | ROOF MODULE | MORROW, JASON S | — |
| 19174143 | FRONT STRUCTURE OF VEHICLE AND METHOD FOR ASSEMBLING FRONT STRUCTURE OF VEHICLE | AKARAGWE, YANICK A | — |
| 19085453 | ACRYLIC ACID PLASMA POLYMERIZATION FILM AND PRODUCTION METHOD THEREFOR | WALTERS JR, ROBERT S | — |
| 19077604 | CENTER CONSOLE ASSEMBLIES INCLUDING ELECTRICAL CONNECTION ASSEMBLIES | DANIELS, JASON S | — |
| 19065277 | ON-VEHICLE DOUBLE OPENING STORAGE DEVICE | AKARAGWE, YANICK A | — |
| Art Unit | Apps |
|---|---|
| 3612 | 6 |
| 2875 | 2 |
| 3614 | 2 |
| 3672 | 2 |
| 1758 | 2 |
| 2893 | 2 |
| 2818 | 2 |
| 2897 | 2 |
| 2836 | 1 |
| 3636 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19543950 | STEERING WHEEL | CHIANG, MICHAEL | 2875 | §102 | Non-Final OA | — | Pending | Feb 19, 2026 |
| 19236580 | AIRBAG STRUCTURE | FRISBY, KEITH J | 3614 | §102§112 | Non-Final OA | — | Pending | Jun 12, 2025 |
| 19228169 | RECTIFIER CABLE AND RECTIFIER CONNECTOR | TRAN, THAI H | 2836 | §102§103 | Final Rejection | — | Pending | Jun 04, 2025 |
| 19184194 | ROOF MODULE | MORROW, JASON S | 3612 | §103§112 | Non-Final OA | — | Pending | Apr 21, 2025 |
| 19174143 | FRONT STRUCTURE OF VEHICLE AND METHOD FOR ASSEMBLING FRONT STRUCTURE OF VEHICLE | AKARAGWE, YANICK A | 3672 | §102§112 | Non-Final OA | — | Pending | Apr 09, 2025 |
| 19085642 | SEAT CUSHION AIR BAG DEVICE AND SEAT CUSHION AIR BAG STRUCTURE | LIBBY, TROY ALAN | 3636 | §103§112 | Non-Final OA | — | Pending | Mar 20, 2025 |
| 19085453 | ACRYLIC ACID PLASMA POLYMERIZATION FILM AND PRODUCTION METHOD THEREFOR | WALTERS JR, ROBERT S | 1717 | §102 | Final Rejection | — | Pending | Mar 20, 2025 |
| 19077118 | ELECTRIC LIQUID PUMP | LEE, GEOFFREY S | 3746 | §103 | Non-Final OA | 33d | Pending | Mar 12, 2025 |
| 19077604 | CENTER CONSOLE ASSEMBLIES INCLUDING ELECTRICAL CONNECTION ASSEMBLIES | DANIELS, JASON S | 3612 | §102 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19075894 | OPENING TRIM WEATHER STRIP | MENEZES, MARCUS | 3634 | §103 | Non-Final OA | — | Pending | Mar 11, 2025 |
| 19066963 | VEHICLE INTERIOR COMPONENT | ESQUIVEL, DENISE LYNNE | 3612 | §102§103 | Non-Final OA | — | Pending | Feb 28, 2025 |
| 19065277 | ON-VEHICLE DOUBLE OPENING STORAGE DEVICE | AKARAGWE, YANICK A | 3672 | §103§112 | Non-Final OA | — | Pending | Feb 27, 2025 |
| 19049135 | LIQUID STORAGE STRUCTURE FOR VEHICLE | LYNCH, CARLY W | — | §103 | Non-Final OA | — | Pending | Feb 10, 2025 |
| 19048533 | GLASS RUN | GUTMAN, HILARY L | 3612 | §103§112 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 18999320 | VEHICLE EMBLEM | OMORI, MARY I | 1784 | §103 | Final Rejection | — | Pending | Dec 23, 2024 |
| 18989076 | GRILLE SHUTTER DEVICE | FULLER, ROBERT EDWARD | 3676 | §102§103 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18962431 | VEHICLE EXTERIOR COMPONENT | BLANKENSHIP, GREGORY A | 3612 | §102§103 | Non-Final OA | — | Pending | Nov 27, 2024 |
| 18947343 | SOUND OUTPUT DEVICE FOR VEHICLE | MANCINI, EVAN THOMAS | 2855 | §102§103 | Non-Final OA | — | Pending | Nov 14, 2024 |
| 18945056 | FLUID STERILIZATION DEVICE | LEE, AHAM NMN | 1758 | §102§103DP | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18945104 | FLUID STERILIZATION DEVICE | LEE, AHAM NMN | 1758 | §102DP | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18929123 | FLUID STERILIZATION DEVICE | KIM, SUN U | 1772 | §103§112 | Non-Final OA | — | Pending | Oct 28, 2024 |
| 18912917 | SEMICONDUCTOR ELEMENT AND METHOD FOR MANUFACTURING SEMICONDUCTOR ELEMENT | SPALLA, DAVID C | 2893 | §102§103 | Non-Final OA | — | Pending | Oct 11, 2024 |
| 18912709 | RESIN COMPOSITION | ZHANG, MICHAEL N | 1781 | §102§103 | Non-Final OA | — | Pending | Oct 11, 2024 |
| 18906794 | LIGHT EMITTING ELEMENT AND LIGHT EMITTING DEVICE | KEAGY, ROSE ALYSSA | 2818 | §112 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18905590 | LIGHT EMITTING DEVICE | MUNOZ, ANDRES F | — | §102§103§112 | Non-Final OA | — | Pending | Oct 03, 2024 |
| 18900319 | CURTAIN AIRBAG DEVICE | SLITERIS, JOSELYNN Y | 3614 | §103§112 | Final Rejection | 2d overdue | Pending | Sep 27, 2024 |
| 18887335 | LIGHT EMITTING ELEMENT | VU, VU A | 2897 | §102§103 | Non-Final OA | — | Pending | Sep 17, 2024 |
| 18796795 | LIGHT EMITTING DEVICE AND INSULATING ANTI-REFLECTIVE LAYER USED FOR LIGHT EMITTING DEVICE | KARIMY, TIMOR | 2818 | §103§112 | Non-Final OA | — | Pending | Aug 07, 2024 |
| 18788907 | LIGHT EMITTING ELEMENT | ANYA, IGWE U | 2891 | §102§103 | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18642035 | AIR REGISTERS INCLUDING A FIXED BLADE AND ROTATING BARRELS | FAULKNER, RYAN L | 3762 | §103 | Non-Final OA | — | Pending | Apr 22, 2024 |
| 18628143 | CELL CULTURE MEMBRANE AND CELL CULTURE METHOD | NICOL, ALEXANDER W | 1634 | §102§103 | Non-Final OA | — | Pending | Apr 05, 2024 |
| 18615501 | WIRELESSLY RECHARGEABLE POWER SUPPLY DEVICE | CAVALLARI, DANIEL | 2859 | §102§103§112 | Non-Final OA | — | Pending | Mar 25, 2024 |
| 18609047 | VEHICLE UPPER STRUCTURE | FRITCHMAN, JOSEPH C | 3645 | §102§103 | Non-Final OA | — | Pending | Mar 19, 2024 |
| 18602855 | SEMICONDUCTOR DECIVE AND PRODUCTION METHOD THEREFOR | CHI, SUBERR L | 2893 | §102§103 | Non-Final OA | — | Pending | Mar 12, 2024 |
| 18591157 | LAMINATE | GRUSBY, REBECCA LYNN | 1785 | §103§112 | Non-Final OA | 14d | Pending | Feb 29, 2024 |
| 18421329 | LIGHT-EMITTING DEVICE | SANTIAGO, MARICELI | 2875 | §102§103 | Final Rejection | — | Pending | Jan 24, 2024 |
| 18540106 | LIGHT EMITTING ELEMENT | LINDSEY, COLE LEON | 2812 | §103§112 | Final Rejection | — | Pending | Dec 14, 2023 |
| 18529851 | LIGHT EMITTING ELEMENT | ZHU, SHENG-BAI | 2897 | §103 | Non-Final OA | 28d | Pending | Dec 05, 2023 |
| 18556589 | INFRARED LIGHT-TRANSMITTING PRODUCT | WASHINGTON, TAMARA Y | 2872 | §103 | Final Rejection | — | Pending | Oct 20, 2023 |
| 18453469 | CONSOLE BOX AND INTERIOR STRUCTURE FOR VEHICLE | FLEMING, FAYE M | 3612 | §102 | Non-Final OA | — | Pending | Aug 22, 2023 |
| 18145617 | VEHICLE EXTERIOR COMPONENT | MITCHUM, DREW JOSEPH | 3761 | §103 | Final Rejection | 41d | Pending | Dec 22, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialToyoda Gosei Co., Ltd. has 41 pending office actions as of October 2026, spread across 27 art units and 39 examiners.
Yanick A Akaragwe has the most, with 2 of Toyoda Gosei Co., Ltd.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.