39 pending office actions • 1 client • 35 examiners • 19 art units • 0 of 39 (0%) have an AI response strategy ready • 58 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 12 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 12 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 3 (8%) |
| §101 + other | 9 (23%) |
| §103 only | 10 (26%) |
| §112 only | 2 (5%) |
| Multi-statute (no §101) | 15 (38%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| GRAY, GEORGE STERLING | 2 | 75.4% | +9.6% |
| RUNYAN, SILVANA C | 2 | 82.4% | +17.1% |
| WLODARSKI, NICHOLAS NMN | 2 | 83.9% | +11.9% |
| BREIER, KRYSTINE E | 2 | 82.1% | +8.5% |
| MICHENER, BLAKE E | 1 | 77.1% | +25.7% |
| LAMBE, PATRICK F | 1 | 62.5% | +28.7% |
| GUTIERREZ, GISSELLE M | 1 | 80.5% | +12.8% |
| BEMKO, TARAS P | 1 | 84.7% | +19.2% |
| CULLER, JILL E | 1 | 57.3% | +13.5% |
| HANEY, NOAH JAMES | 1 | 79.6% | +30.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | BEMKO, TARAS P | 23d overdue |
| 18494208 | Leaky Flexural Wave Semblance Based Annular Stacking Velocity Determination In Cased Wells | BREIER, KRYSTINE E | 5d overdue |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | WLODARSKI, NICHOLAS NMN | 18d overdue |
| 17392058 | Borehole Image Gap Filing Using Deep Learning | MANG, LAL C | 22d |
| 18524491 | Well Integrity Evaluation Using Pseudo Attributes | BENLAGSIR, AMINE | 27d |
| 17968628 | Fast Proxy Model For Well Casing Integrity Evaluation | GEISS, BRIAN BUTLER | 27d |
| 17701921 | Method For Selection Of Cement Composition For Wells Experiencing Cyclic Loads | MONTES, NARCISO EDUARDO | 70d |
| 19402783 | MULTIPHYSICS FOR WHITE HYDROGEN PROSPECTING | GRAY, GEORGE STERLING | — |
| 19276290 | WELL ABANDONMENT AND SEVERANCE OF CONTROL LINES | RUNYAN, SILVANA C | — |
| 19149001 | COMPLETIONS-BASED WELL CLEANOUT USING MAGNETIC CLEANOUT TOOL | MICHENER, BLAKE E | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | BEMKO, TARAS P | 23d overdue |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | WLODARSKI, NICHOLAS NMN | 18d overdue |
| 19276290 | WELL ABANDONMENT AND SEVERANCE OF CONTROL LINES | RUNYAN, SILVANA C | — |
| 19149001 | COMPLETIONS-BASED WELL CLEANOUT USING MAGNETIC CLEANOUT TOOL | MICHENER, BLAKE E | — |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | WLODARSKI, NICHOLAS NMN | — |
| 19189872 | Untethered And Autonomous Well Intervention Vehicle | LAMBE, PATRICK F | — |
| 19038472 | DOWNHOLE NANO PARTICLE HEAT BLANKET FOR NEUTRON GENERATOR TUBES AND OTHER APPLICATIONS | GUTIERREZ, GISSELLE M | — |
| 18949730 | METHOD TO CONTROL THE FLOW RATES OF FOCUS SAMPLING PROBE TO ENABLE FASTER CAPTURE OF CLEAN FORMATION FLUID | CULLER, JILL E | — |
| Client (Assignee) | Pending OAs |
|---|---|
| HALLIBURTON ENERGY SERVICES, INC. | 39 |
| Art Unit | Apps |
|---|---|
| 3676 | 5 |
| 2857 | 4 |
| 3674 | 3 |
| 3672 | 3 |
| 2188 | 3 |
| 3645 | 2 |
| 2189 | 2 |
| 2853 | 1 |
| 2877 | 1 |
| 2837 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19402783 | MULTIPHYSICS FOR WHITE HYDROGEN PROSPECTING | Halliburton Energy Services, Inc. | GRAY, GEORGE STERLING | 3676 | §102§103§112 | Non-Final OA | — | Pending | Nov 26, 2025 |
| 19276290 | WELL ABANDONMENT AND SEVERANCE OF CONTROL LINES | Halliburton Energy Services, Inc. | RUNYAN, SILVANA C | 3674 | §103§112 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19149001 | COMPLETIONS-BASED WELL CLEANOUT USING MAGNETIC CLEANOUT TOOL | Halliburton Energy Services, Inc. | MICHENER, BLAKE E | 3676 | §102§103§112 | Non-Final OA | — | Pending | Jul 17, 2025 |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | Halliburton Energy Services, Inc. | WLODARSKI, NICHOLAS NMN | 3672 | §103§112Other | Non-Final OA | — | Pending | Apr 28, 2025 |
| 19189872 | Untethered And Autonomous Well Intervention Vehicle | Halliburton Energy Services, Inc. | LAMBE, PATRICK F | 3676 | §102§103 | Final Rejection | — | Pending | Apr 25, 2025 |
| 19039680 | EVALUATING SUBSURFACE CONDITIONS | Halliburton Energy Services, Inc. | BREIER, KRYSTINE E | §102§103 | Non-Final OA | — | Pending | Jan 28, 2025 | |
| 19038472 | DOWNHOLE NANO PARTICLE HEAT BLANKET FOR NEUTRON GENERATOR TUBES AND OTHER APPLICATIONS | Halliburton Energy Services, Inc. | GUTIERREZ, GISSELLE M | §102§103 | Non-Final OA | — | Pending | Jan 27, 2025 | |
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | Halliburton Energy Services, Inc. | BEMKO, TARAS P | 3672 | §103 | Non-Final OA | 23d overdue | Pending | Nov 20, 2024 |
| 18949730 | METHOD TO CONTROL THE FLOW RATES OF FOCUS SAMPLING PROBE TO ENABLE FASTER CAPTURE OF CLEAN FORMATION FLUID | Halliburton Energy Services, Inc. | CULLER, JILL E | 2853 | §103 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18949710 | SYSTEM AND METHOD TO RETARD H2S REACTION WITH A TARGET SENSING ELEMENET | Halliburton Energy Services, Inc. | HANEY, NOAH JAMES | 2877 | §102§103 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18923878 | POLYMER SYSTEMS FOR SUBTERRANEAN ENERGY STORAGE | Halliburton Energy Services, Inc. | SUE-AKO, ANDREW B. | 3674 | §112 | Non-Final OA | — | Pending | Oct 23, 2024 |
| 18886709 | CONSTANT INPUT POWER CONTROL METHOD FOR ELECTRIC MOTORS IN DOWNHOLE TOOLS | Halliburton Energy Services, Inc. | ISLAM, MUHAMMAD S | 2837 | §112 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18812727 | FIRE ON DEMAND ATMOSPHERIC BARRIER VALVE USING TEC LINE AND HYDRAULIC BOOST ASSEMBLY | Halliburton Energy Services, Inc. | GRAY, GEORGE STERLING | 3676 | §102§103§112 | Non-Final OA | — | Pending | Aug 22, 2024 |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | Halliburton Energy Services, Inc. | WLODARSKI, NICHOLAS NMN | 3672 | §103§112Other | Final Rejection | 18d overdue | Pending | Aug 16, 2024 |
| 18781837 | RECONFIGURABLE DOWNHOLE PIPE INSPECTION TOOL | Halliburton Energy Services, Inc. | MAINI, RAHUL | 2858 | §103 | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18759316 | METHOD OF USING DEGRADABLE GLASS FIBERS FOR DOWNHOLE TOOLS | Halliburton Energy Services, Inc. | RUNYAN, SILVANA C | 3674 | §102§103§112 | Non-Final OA | — | Pending | Jun 28, 2024 |
| 18755559 | DETERMINATION OF MINERALOGY AND LITHOLOGY FROM ELEMENTAL DATA | Halliburton Energy Services, Inc. | TOOHEY, RICHARD ORLANDO | 2884 | §103 | Final Rejection | 42d | Pending | Jun 26, 2024 |
| 18598890 | Deep Sonic Image Velocity Scan | Halliburton Energy Services, Inc. | HOLMES, JANELLE AMBER | §101§103 | Non-Final OA | — | Pending | Mar 07, 2024 | |
| 18587306 | Self-Powered Optical Amplifiers | Halliburton Energy Services, Inc. | NGUYEN, RACHEL NICOLE | §102§103 | Non-Final OA | — | Pending | Feb 26, 2024 | |
| 18423622 | Ultra-Sonic Acoustic Method For Through Casing Cement Evaluation | Halliburton Energy Services, Inc. | N'DURE, AMIE MERCEDES | 3645 | §103 | Final Rejection | 24d overdue | Pending | Jan 26, 2024 |
| 18405960 | Geosteering Copilot Assistant | Halliburton Energy Services, Inc. | LEE, MICHAEL CHRISTOPHER | §101§103§112 | Non-Final OA | — | Pending | Jan 05, 2024 | |
| 18404420 | Use Of Bending Moment On Bit Measurements And Simulations To Determine Health Condition Of Push-The-Bit Rotary Steerable Systems And Assess Directional Drilling Capability | Halliburton Energy Services, Inc. | QUAIM, LAMIA | 3676 | §101§112 | Final Rejection | — | Pending | Jan 04, 2024 |
| 18524491 | Well Integrity Evaluation Using Pseudo Attributes | Halliburton Energy Services, Inc. | BENLAGSIR, AMINE | 2688 | §101§103DP | Final Rejection | 27d | Pending | Nov 30, 2023 |
| 18507353 | Downhole Tools Having Elastomer Blend For Geothermal Wellbores | Halliburton Energy Services, Inc. | TUCKER, PHILIP C | 1745 | §102§103 | Non-Final OA | — | Pending | Nov 13, 2023 |
| 18494208 | Leaky Flexural Wave Semblance Based Annular Stacking Velocity Determination In Cased Wells | Halliburton Energy Services, Inc. | BREIER, KRYSTINE E | 3645 | §103 | Final Rejection | 5d overdue | Pending | Oct 25, 2023 |
| 18485077 | DRILLING FLUID CONTAMINATION DETERMINATION FOR DOWNHOLE FLUID SAMPLING TOOL | Halliburton Energy Services, Inc. | ISHIZUKA, YOSHIHISA | 2857 | §101§112 | Non-Final OA | — | Pending | Oct 11, 2023 |
| 18228561 | Automatic Dip Picking From Azimuthal Borehole Images | Halliburton Energy Services, Inc. | GO, RICKY | 2857 | §101§102§103 | Final Rejection | — | Pending | Jul 31, 2023 |
| 18211723 | High Temperature Suspension Additive For Wellbore Treatments | Halliburton Energy Services, Inc. | DAVIDSON IV, CULLEN LEE GARRETT | 1767 | §102§103 | Non-Final OA | — | Pending | Jun 20, 2023 |
| 18310974 | Construction Of A Target Assembly For A Compact D-D Or D-T Neutron Generator | Halliburton Energy Services, Inc. | OSENBAUGH-STEWART, ELIZA W | 2881 | §103 | Non-Final OA | — | Pending | May 02, 2023 |
| 18104085 | Hybrid Approach to Tailor Design Choices for Improved Risk Mitigation During Cement Job Design | Halliburton Energy Services, Inc. | MOLL, NITHYA JANAKIRAMAN | 2189 | §101 | Final Rejection | — | Pending | Jan 31, 2023 |
| 17969545 | Bottomhole Assembly Modeling | Halliburton Energy Services, Inc. | COCCHI, MICHAEL EDWARD | 2188 | §101§103§112 | Non-Final OA | — | Pending | Oct 19, 2022 |
| 17968628 | Fast Proxy Model For Well Casing Integrity Evaluation | Halliburton Energy Services, Inc. | GEISS, BRIAN BUTLER | 2857 | §101§103 | Final Rejection | 27d | Pending | Oct 18, 2022 |
| 17797778 | Substituted Carboxamide Corrosion Inhibitor Compounds | Halliburton Energy Services, Inc. | DIGGS, TANISHA | 1761 | §103§112 | Final Rejection | — | Pending | Aug 05, 2022 |
| 17863041 | Asphaltene Onset Pressure Map | Halliburton Energy Services, Inc. | KIM, EUNHEE | 2188 | §103Other | Final Rejection | 30d | Pending | Jul 12, 2022 |
| 17735727 | FORMATION AND RESERVOIR ROCK MODELING USING SYMBOLIC REGRESSION | Halliburton Energy Services, Inc. | DRAPEAU, SIMEON PAUL | 2188 | §103Other | Non-Final OA | 44d overdue | Pending | May 03, 2022 |
| 17701921 | Method For Selection Of Cement Composition For Wells Experiencing Cyclic Loads | Halliburton Energy Services, Inc. | MONTES, NARCISO EDUARDO | 2189 | §101 | Final Rejection | 70d | Pending | Mar 23, 2022 |
| 17570227 | Formation Evaluation Based On Piecewise Polynomial Model | Halliburton Energy Services, Inc. | DEBNATH, NUPUR | 2186 | §101§103 | Non-Final OA | — | Pending | Jan 06, 2022 |
| 17471345 | Core Data Augmentation Methods For Developing Data Driven Based Petrophysical Interpretation Models | Halliburton Energy Services, Inc. | JONES, CHARLES JEFFREY | 2122 | §103 | Final Rejection | 150d overdue | Pending | Sep 10, 2021 |
| 17392058 | Borehole Image Gap Filing Using Deep Learning | Halliburton Energy Services, Inc. | MANG, LAL C | 2857 | §101 | Final Rejection | 22d | Pending | Aug 02, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial