29 pending office actions • 1 client • 26 examiners • 16 art units • 1 of 29 (3%) have an AI response strategy ready • 82 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 28 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 28 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 3 (10%) |
| §103 only | 18 (62%) |
| §102 only | 5 (17%) |
| §112 only | 1 (3%) |
| No statute on record | 2 (7%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| THOMPSON, KENNETH L | 2 | 87.5% | +7.0% |
| WLODARSKI, NICHOLAS NMN | 2 | 83.8% | +11.3% |
| ANDREWS, DAVID L | 2 | 71.7% | +16.3% |
| BEMKO, TARAS P | 1 | 84.7% | +19.4% |
| TOOHEY, RICHARD ORLANDO | 1 | 82.8% | +10.1% |
| ROBERTS, HERBERT K | 1 | 68.8% | +12.8% |
| WAHEED, NAZRA NUR | 1 | 84.1% | +11.3% |
| N'DURE, AMIE MERCEDES | 1 | 77.9% | +15.2% |
| BENLAGSIR, AMINE | 1 | 68.2% | +59.4% |
| BREIER, KRYSTINE E | 1 | 81.9% | +8.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | BEMKO, TARAS P | 23d overdue |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | WLODARSKI, NICHOLAS NMN | 18d overdue |
| 18494208 | Leaky Flexural Wave Semblance Based Annular Stacking Velocity Determination In Cased Wells | BREIER, KRYSTINE E | 5d overdue |
| 19221203 | METHOD AND APPARATUS FOR DOWNHOLE FLUID MICROSAMPLE COLLECTION WITH STAGED HYDRAULIC ACTUATION | THOMPSON, KENNETH L | 30d |
| 19222598 | Method And Apparatus For Downhole Fluid Microsample Collection With Staged Hydraulic Actuation | THOMPSON, KENNETH L | 35d |
| 18442919 | LOW POWER QUANTUM SENSOR NETWORKS FOR MONITORING AND TELEMETRY | WAHEED, NAZRA NUR | 41d |
| 18755559 | DETERMINATION OF MINERALOGY AND LITHOLOGY FROM ELEMENTAL DATA | TOOHEY, RICHARD ORLANDO | 42d |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | WLODARSKI, NICHOLAS NMN | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18241176 | METHODS TO PERFORM NUCLEAR MAGNETIC RESONANCE MEASUREMENTS, AND NUCLEAR MAGNETIC RESONANCE TOOLS | CLARKE, ADAM S | 3d overdue |
| 17392058 | Borehole Image Gap Filing Using Deep Learning | MANG, LAL C | 22d |
| 17701921 | Method For Selection Of Cement Composition For Wells Experiencing Cyclic Loads | LUU, CUONG V | 70d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18812687 | DENSITY BASED DOWNHOLE FLUID SEPARATOR THAT CREATES ARTIFICIAL GRAVITY | ANDREWS, DAVID L | 104d overdue |
| 18423622 | Ultra-Sonic Acoustic Method For Through Casing Cement Evaluation | N'DURE, AMIE MERCEDES | 24d overdue |
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | BEMKO, TARAS P | 23d overdue |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | WLODARSKI, NICHOLAS NMN | 18d overdue |
| 18946709 | NOISE CHARACTERIZATION IN FORMATION TESTING | ANDREWS, DAVID L | 16d |
| 18524491 | Well Integrity Evaluation Using Pseudo Attributes | BENLAGSIR, AMINE | 27d |
| 18442919 | LOW POWER QUANTUM SENSOR NETWORKS FOR MONITORING AND TELEMETRY | WAHEED, NAZRA NUR | 41d |
| 18755559 | DETERMINATION OF MINERALOGY AND LITHOLOGY FROM ELEMENTAL DATA | TOOHEY, RICHARD ORLANDO | 42d |
| Client (Assignee) | Pending OAs |
|---|---|
| HALLIBURTON ENERGY SERVICES, INC. | 29 |
| Art Unit | Apps |
|---|---|
| 3672 | 5 |
| 3645 | 4 |
| 3676 | 3 |
| 2857 | 3 |
| 2858 | 2 |
| 2188 | 2 |
| 2884 | 1 |
| 2855 | 1 |
| 3648 | 1 |
| 2688 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19222598 | Method And Apparatus For Downhole Fluid Microsample Collection With Staged Hydraulic Actuation | Halliburton Energy Services, Inc. | THOMPSON, KENNETH L | 3676 | §102 | Non-Final OA | 35d | Pending | May 29, 2025 |
| 19221203 | METHOD AND APPARATUS FOR DOWNHOLE FLUID MICROSAMPLE COLLECTION WITH STAGED HYDRAULIC ACTUATION | Halliburton Energy Services, Inc. | THOMPSON, KENNETH L | 3676 | §102 | Non-Final OA | 30d | Pending | May 28, 2025 |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | Halliburton Energy Services, Inc. | WLODARSKI, NICHOLAS NMN | 3672 | §112 | Non-Final OA | — | Pending | Apr 28, 2025 |
| 18953365 | PROTECTIVE BARRIER COATING TO IMPROVE BOND INTEGRITY IN DOWNHOLE EXPOSURES | Halliburton Energy Services, Inc. | BEMKO, TARAS P | 3672 | §103 | Non-Final OA | 23d overdue | Pending | Nov 20, 2024 |
| 18946709 | NOISE CHARACTERIZATION IN FORMATION TESTING | Halliburton Energy Services, Inc. | ANDREWS, DAVID L | 3672 | Other | Non-Final OA | 16d | Pending | Nov 13, 2024 |
| 18812687 | DENSITY BASED DOWNHOLE FLUID SEPARATOR THAT CREATES ARTIFICIAL GRAVITY | Halliburton Energy Services, Inc. | ANDREWS, DAVID L | 3672 | §103 | Non-Final OA | 104d overdue | Pending | Aug 22, 2024 |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | Halliburton Energy Services, Inc. | WLODARSKI, NICHOLAS NMN | 3672 | §102 | Non-Final OA | 18d overdue | Pending | Aug 16, 2024 |
| 18755559 | DETERMINATION OF MINERALOGY AND LITHOLOGY FROM ELEMENTAL DATA | Halliburton Energy Services, Inc. | TOOHEY, RICHARD ORLANDO | 2884 | §102 | Non-Final OA | 42d | Pending | Jun 26, 2024 |
| 18616834 | Cement Evaluation With Coated Pipe | Halliburton Energy Services, Inc. | ROBERTS, HERBERT K | 2855 | §103 | Non-Final OA | 56d | Pending | Mar 26, 2024 |
| 18442919 | LOW POWER QUANTUM SENSOR NETWORKS FOR MONITORING AND TELEMETRY | Halliburton Energy Services, Inc. | WAHEED, NAZRA NUR | 3648 | §103 | Final Rejection | 41d | Pending | Feb 15, 2024 |
| 18423622 | Ultra-Sonic Acoustic Method For Through Casing Cement Evaluation | Halliburton Energy Services, Inc. | N'DURE, AMIE MERCEDES | 3645 | §102 | Non-Final OA | 24d overdue | Pending | Jan 26, 2024 |
| 18524491 | Well Integrity Evaluation Using Pseudo Attributes | Halliburton Energy Services, Inc. | BENLAGSIR, AMINE | 2688 | Other | Non-Final OA | 27d | Pending | Nov 30, 2023 |
| 18494208 | Leaky Flexural Wave Semblance Based Annular Stacking Velocity Determination In Cased Wells | Halliburton Energy Services, Inc. | BREIER, KRYSTINE E | 3645 | §103 | Non-Final OA | 5d overdue | Pending | Oct 25, 2023 |
| 18484140 | Iterative Cement Bond Logging Without Calibration | Halliburton Energy Services, Inc. | ARMSTRONG, JONATHAN D | 3645 | §103 | Final Rejection | 71d | Pending | Oct 10, 2023 |
| 18370121 | Beamforming Through Tubing For Cement Bond Evaluation And Borehole Mapping | Halliburton Energy Services, Inc. | ABULABAN, ABDALLAH | 3645 | §103 | Final Rejection | 63d | Pending | Sep 19, 2023 |
| 18241176 | METHODS TO PERFORM NUCLEAR MAGNETIC RESONANCE MEASUREMENTS, AND NUCLEAR MAGNETIC RESONANCE TOOLS | Halliburton Energy Services, Inc. | CLARKE, ADAM S | 2858 | §101 | Non-Final OA | 3d overdue | Pending | Aug 31, 2023 |
| 18233767 | Duty Cycle Estimation From Bending Moment Magnitude | Halliburton Energy Services, Inc. | NORRIS, URSULA LEE | 3676 | §103 | Final Rejection | 27d | Pending | Aug 14, 2023 |
| 18114093 | Non-Invasive Method For Behind-Casing Cable Localization | Halliburton Energy Services, Inc. | SCHINDLER, DAVID M | 2858 | §103 | Non-Final OA | 8d | Pending | Feb 24, 2023 |
| 17968628 | Fast Proxy Model For Well Casing Integrity Evaluation | Halliburton Energy Services, Inc. | GEISS, BRIAN BUTLER | 2857 | §103 | Non-Final OA | 27d | Pending | Oct 18, 2022 |
| 17958178 | Autonomous Uncertainty-Aware Engine For Pressure Gradient Identification Using A Discrete Optimization Framework | Halliburton Energy Services, Inc. | CHAVEZ, ANTHONY RAY | 2186 | §103 | Non-Final OA | 77d overdue | Pending | Sep 30, 2022 |
| 17863041 | Asphaltene Onset Pressure Map | Halliburton Energy Services, Inc. | KIM, EUNHEE | 2188 | §103 | Non-Final OA | 30d | Pending | Jul 12, 2022 |
| 17735727 | FORMATION AND RESERVOIR ROCK MODELING USING SYMBOLIC REGRESSION | Halliburton Energy Services, Inc. | DRAPEAU, SIMEON PAUL | 2188 | §103 | Final Rejection | 44d overdue | Pending | May 03, 2022 |
| 17727001 | Designing For Permeability Of Filter Cake To Control Lost Circulation | Halliburton Energy Services, Inc. | SHALABY, AHMAD HUSSAM | 2187 | §103 | Final Rejection | 53d | Pending | Apr 22, 2022 |
| 17701921 | Method For Selection Of Cement Composition For Wells Experiencing Cyclic Loads | Halliburton Energy Services, Inc. | LUU, CUONG V | 2189 | §101 | Non-Final OA | 70d | Pending | Mar 23, 2022 |
| 17693578 | Extending Fiber Optic Sensing | Halliburton Energy Services, Inc. | REVERMAN, CHAD ANDREW | 2877 | §103 | Final Rejection | 16d overdue | AI Ready | Mar 14, 2022 |
| 17531665 | Use Of Nuclear Magnetic Resonance For Gas Wettability And Supercritical Fluid Wettability Determination | Halliburton Energy Services, Inc. | XU, XIAOYUN | 1797 | §103 | Final Rejection | 55d | Pending | Nov 19, 2021 |
| 17471345 | Core Data Augmentation Methods For Developing Data Driven Based Petrophysical Interpretation Models | Halliburton Energy Services, Inc. | JONES, CHARLES JEFFREY | 2122 | §103 | Non-Final OA | 150d overdue | Pending | Sep 10, 2021 |
| 17392058 | Borehole Image Gap Filing Using Deep Learning | Halliburton Energy Services, Inc. | MANG, LAL C | 2857 | §101 | Non-Final OA | 22d | Pending | Aug 02, 2021 |
| 17360423 | Annulus Velocity Independent Time Domain Structure Imaging In Cased Holes Using Multi-Offset Secondary Flexural Wave Data | Halliburton Energy Services, Inc. | KAY, DOUGLAS | 2857 | §103 | Non-Final OA | 4d overdue | Pending | Jun 28, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial