22 pending office actions • 1 client • 22 examiners • 19 art units • 15 of 22 (68%) have an AI response strategy ready • 126 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 22 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 22 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (5%) |
| §103 only | 19 (86%) |
| §102 only | 2 (9%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HEIBER, SHANTELL LAKETA | 1 | 77.2% | +19.9% |
| DONABED, NINOS | 1 | 75.2% | +66.3% |
| HARPER, KEVIN C | 1 | 87.9% | +6.2% |
| BROWN, VERNAL U | 1 | 69.6% | +13.9% |
| WILLIAMS, ALESSANDRA ROSE GLYNN | 1 | — | — |
| O CONNOR, BRIAN T | 1 | 85.1% | +8.4% |
| SABOURI, MAZDA | 1 | 77.2% | +16.7% |
| TAHA, SHUKRI ABDALLAH | 1 | 83.9% | +18.3% |
| NGUYEN, CHUONG M | 1 | 72.5% | +19.8% |
| HISHAM, MOSTOFA AHMED | 1 | — | — |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18294399 | INDICATION FOR PREAMBLE TRANSMISSION AFTER BEAM SWITCH | O CONNOR, BRIAN T | 37d overdue |
| 18609922 | RECEPTION SCHEME | HARPER, KEVIN C | 17d overdue |
| 18576279 | UNCONFIGURED MEASUREMENT GAPS HANDLING FOR FRAME BASED EQUIPMENT (FBE) OPERATION | TAHA, SHUKRI ABDALLAH | 62d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18728655 | METHOD AND APPARATUS FOR SPLITTING DOWNLINK DATA IN A DUAL/MULTI CONNECTIVITY SYSTEM | DONABED, NINOS | 111d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18728655 | METHOD AND APPARATUS FOR SPLITTING DOWNLINK DATA IN A DUAL/MULTI CONNECTIVITY SYSTEM | DONABED, NINOS | 111d overdue |
| 18558005 | TRANSMISSION FOR TIME SYNCHRONIZATION | NGUYEN, CHUONG M | 35d overdue |
| 18804702 | O-RAN OPEN FRONTHAUL SECTION ENHANCEMENT | HEIBER, SHANTELL LAKETA | 29d overdue |
| 18416248 | PAGING WITH CELL DISCONTINUOUS TRANSMISSION | SABOURI, MAZDA | 6d |
| 18594150 | AMBIENT INTERNET OF THINGS TAG READER PROCEDURE FOR ESTIMATION OF TAG CHARGE TIME WITH PERIODIC POSITIONING ACTIVATION REFERENCE SIGNALS | BROWN, VERNAL U | 13d |
| 18576279 | UNCONFIGURED MEASUREMENT GAPS HANDLING FOR FRAME BASED EQUIPMENT (FBE) OPERATION | TAHA, SHUKRI ABDALLAH | 62d |
| Client (Assignee) | Pending OAs |
|---|---|
| Nokia | 22 |
| Art Unit | Apps |
|---|---|
| 2413 | 2 |
| 2478 | 2 |
| 2477 | 2 |
| 2645 | 1 |
| 2444 | 1 |
| 2462 | 1 |
| 2686 | 1 |
| 2465 | 1 |
| 2641 | 1 |
| 2411 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18804702 | O-RAN OPEN FRONTHAUL SECTION ENHANCEMENT | Nokia Solutions and Networks Oy | HEIBER, SHANTELL LAKETA | 2645 | §103 | Non-Final OA | 29d overdue | Pending | Aug 14, 2024 |
| 18728655 | METHOD AND APPARATUS FOR SPLITTING DOWNLINK DATA IN A DUAL/MULTI CONNECTIVITY SYSTEM | Nokia Solutions and Networks Oy | DONABED, NINOS | 2444 | §101 | Final Rejection | 111d overdue | AI Ready | Jul 12, 2024 |
| 18609922 | RECEPTION SCHEME | Nokia Technologies Oy | HARPER, KEVIN C | 2462 | §103 | Non-Final OA | 17d overdue | AI Ready | Mar 19, 2024 |
| 18594150 | AMBIENT INTERNET OF THINGS TAG READER PROCEDURE FOR ESTIMATION OF TAG CHARGE TIME WITH PERIODIC POSITIONING ACTIVATION REFERENCE SIGNALS | Nokia Technologies Oy | BROWN, VERNAL U | 2686 | §103 | Non-Final OA | 13d | AI Ready | Mar 04, 2024 |
| 18682659 | METHODS, APPARATUSES, AND COMPUTER READABLE MEDIA FOR TERAHERTZ CHANNEL COMMUNICATION | Nokia Solutions and Networks Oy | WILLIAMS, ALESSANDRA ROSE GLYNN | 2413 | §103 | Non-Final OA | 2d overdue | AI Ready | Feb 09, 2024 |
| 18294399 | INDICATION FOR PREAMBLE TRANSMISSION AFTER BEAM SWITCH | Nokia Technologies Oy | O CONNOR, BRIAN T | 2465 | §102 | Non-Final OA | 37d overdue | AI Ready | Feb 01, 2024 |
| 18416248 | PAGING WITH CELL DISCONTINUOUS TRANSMISSION | Nokia Technologies Oy | SABOURI, MAZDA | 2641 | §103 | Final Rejection | 6d | AI Ready | Jan 18, 2024 |
| 18576279 | UNCONFIGURED MEASUREMENT GAPS HANDLING FOR FRAME BASED EQUIPMENT (FBE) OPERATION | Nokia Technologies Oy | TAHA, SHUKRI ABDALLAH | 2478 | §103 | Final Rejection | 62d | Pending | Jan 03, 2024 |
| 18558005 | TRANSMISSION FOR TIME SYNCHRONIZATION | Nokia Technologies Oy | NGUYEN, CHUONG M | 2411 | §103 | Non-Final OA | 35d overdue | AI Ready | Oct 30, 2023 |
| 18557994 | TIMING SYNCHRONIZATION MECHANISM | Nokia Solutions and Networks Oy | HISHAM, MOSTOFA AHMED | 2857 | §103 | Non-Final OA | 4d overdue | AI Ready | Oct 30, 2023 |
| 18555755 | METHOD FOR SHARING BASEBAND COMPUTING RESOURCES | Nokia Solutions and Networks Oy | RAHMAN, SHAH M | 2413 | §103 | Non-Final OA | 127d overdue | AI Ready | Oct 17, 2023 |
| 18457270 | DYNAMIC UPLINK TRANSMISSION SCHEME INDICATION FOR MULTI-PANEL USER EQUIPMENT | Nokia Technologies Oy | VANGAPATY, SRIHARSHA REDDY | 2475 | §103 | Non-Final OA | 54d | Pending | Aug 28, 2023 |
| 18447873 | ENERGY HARVESTING AWARE USER EQUIPMENT POWER STATE TRANSITION | Nokia Technologies Oy | SCHEIBEL, ROBERT C | 2467 | §103 | Non-Final OA | 16d | Pending | Aug 10, 2023 |
| 18276541 | A NETWORK REPEATER | Nokia Solutions and Networks Oy | WELTE, BENJAMIN PETER | 2477 | §103 | Final Rejection | 9d overdue | AI Ready | Aug 09, 2023 |
| 18275248 | MULTICAST BROADCAST SERVICES IN 5G SYSTEMS | Nokia Solutions and Networks Oy | HAMPTON, TARELL A | 2476 | §103 | Non-Final OA | 30d overdue | Pending | Aug 01, 2023 |
| 18321867 | CHANNEL ASSESSMENT DETERMINATION IN TELECOMMUNICATION SYSTEMS | Nokia Technologies Oy | SCIACCA, SCOTT M | 2478 | §103 | Final Rejection | 19d | AI Ready | May 23, 2023 |
| 18025296 | BEAM FAILURE REPORTING | Nokia Technologies Oy | DOUGLAS, MICHELE CAMILLE | 2646 | §103 | Non-Final OA | 40d | AI Ready | Mar 08, 2023 |
| 18108833 | APPARATUS, METHODS, AND COMPUTER PROGRAMS | Nokia Technologies Oy | LALCHINTHANG, VANNEILIAN | 2414 | §103 | Non-Final OA | 56d | Pending | Feb 13, 2023 |
| 18020195 | METHODS AND DEVICES FOR COMMUNICATIONS | Nokia Technologies Oy | BARUA, PRANESH K | 2635 | §103 | Non-Final OA | 36d overdue | Pending | Feb 07, 2023 |
| 18040290 | CONTROL CHANNEL REPETITION WITH MAPPING SCHEME | Nokia Technologies Oy | SMITH, JOSHUA Y | 2477 | §102 | Non-Final OA | 9d | AI Ready | Feb 02, 2023 |
| 17963605 | BROADCAST SESSION ESTABLISHMENT | Nokia Technologies Oy | CHANG, KAI J | 2468 | §103 | Final Rejection | 81d overdue | AI Ready | Oct 11, 2022 |
| 14370123 | USER EQUIPMENT CAPABILITIES INDICATION TO ENABLE INTELLIGENT HANDOVER DECISION | Nokia Solutions and Networks Oy | TACDIRAN, ANDRE GEE | 2415 | §103 | Non-Final OA | 28d | AI Ready | Jul 01, 2014 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial