24 pending office actions • 17 clients • 24 examiners • 17 art units • 0 of 24 (0%) have an AI response strategy ready • 62 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 12 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 12 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 14 (58%) |
| §102 only | 2 (8%) |
| §112 only | 6 (25%) |
| Double-patenting only | 1 (4%) |
| No statute on record | 1 (4%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LEE, MATTHEW D | 1 | 89.3% | +5.4% |
| ZIMMERMAN, JOSHUA D | 1 | 40.5% | +15.3% |
| RISIC, ABIGAIL ANNE | 1 | 77.7% | +7.3% |
| HOBSON, STEPHEN | 1 | 65.5% | +20.7% |
| DIZON, EDWARD ANDREW IZON | 1 | 0.0% | +0.0% |
| CAJILIG, CHRISTINE T | 1 | 70.6% | +15.3% |
| KEENA, ELLA LORRAINE | 1 | 20.0% | +88.9% |
| WILSON, GREGORY A | 1 | 81.9% | +6.7% |
| TRIGGS, ANDREW J | 1 | 66.7% | +27.6% |
| BAYNES, KEVIN J | 1 | 75.0% | +33.2% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18854866 | AIR SUPPORTED VESSEL WITH STARBOARD AND PORT KEEL LINES WITH THEIR RESPECTIVE KEEL STEPS TO PREVENT AIR LEAKAGE | LEE, MATTHEW D | — |
| 18711157 | Heat Exchanger Element and Use Thereof | WILSON, GREGORY A | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18726553 | Navigation Aiding Method and Apparatus | DIZON, EDWARD ANDREW IZON | 91d overdue |
| 18716395 | ROTARY DIE CUTTER WITH CLEANING DEVICE | KEENA, ELLA LORRAINE | 50d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18743414 | Weather Resistant Roofing Plate | CAJILIG, CHRISTINE T | 59d overdue |
| 18716395 | ROTARY DIE CUTTER WITH CLEANING DEVICE | KEENA, ELLA LORRAINE | 50d overdue |
| 18697115 | Hybrid Joint Assembly | TRIGGS, ANDREW J | 17d overdue |
| 18839611 | PRINTING UNIT AND METHOD FOR ADJUSTING A PRINTING UNIT | ZIMMERMAN, JOSHUA D | 9d |
| 18728158 | Device for Reintroducing Vapour Into a Volatile Liquid | HOBSON, STEPHEN | — |
| 18688162 | Construction System for Assembly of a Structural Construction | BAYNES, KEVIN J | — |
| Art Unit | Apps |
|---|---|
| 3635 | 2 |
| 2853 | 1 |
| 3663 | 1 |
| 3633 | 1 |
| 3724 | 1 |
| 3678 | 1 |
| 3675 | 1 |
| 3613 | 1 |
| 3752 | 1 |
| 1734 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18854866 | AIR SUPPORTED VESSEL WITH STARBOARD AND PORT KEEL LINES WITH THEIR RESPECTIVE KEEL STEPS TO PREVENT AIR LEAKAGE | Pascal Technologies AS | LEE, MATTHEW D | §112 | Non-Final OA | — | Pending | Oct 07, 2024 | |
| 18839611 | PRINTING UNIT AND METHOD FOR ADJUSTING A PRINTING UNIT | Kolbus GmbH & Co. Kg | ZIMMERMAN, JOSHUA D | 2853 | §103 | Final Rejection | 9d | Pending | Aug 19, 2024 |
| 18729526 | Marine Gangway and a Marine Structure Comprising Such a Marine Gangway | Ulmatec Handling Systems AS | RISIC, ABIGAIL ANNE | §103 | Non-Final OA | — | Pending | Jul 17, 2024 | |
| 18728158 | Device for Reintroducing Vapour Into a Volatile Liquid | Gba Marine AS | HOBSON, STEPHEN | §112 | Non-Final OA | — | Pending | Jul 11, 2024 | |
| 18726553 | Navigation Aiding Method and Apparatus | Norwegian Defence Research Establishment | DIZON, EDWARD ANDREW IZON | 3663 | §103 | Non-Final OA | 91d overdue | Pending | Jul 03, 2024 |
| 18743414 | Weather Resistant Roofing Plate | Omg, Inc. | CAJILIG, CHRISTINE T | 3633 | §103 | Non-Final OA | 59d overdue | Pending | Jun 14, 2024 |
| 18716395 | ROTARY DIE CUTTER WITH CLEANING DEVICE | Kolbus GmbH & Co. Kg | KEENA, ELLA LORRAINE | 3724 | §103 | Non-Final OA | 50d overdue | Pending | Jun 04, 2024 |
| 18711157 | Heat Exchanger Element and Use Thereof | Andritz Technology And Asset Management GmbH | WILSON, GREGORY A | §103 | Non-Final OA | — | Pending | May 17, 2024 | |
| 18697115 | Hybrid Joint Assembly | Produktif Norway AS | TRIGGS, ANDREW J | 3635 | §102 | Non-Final OA | 17d overdue | Pending | Mar 29, 2024 |
| 18688162 | Construction System for Assembly of a Structural Construction | Produktif Norway AS | BAYNES, KEVIN J | 3678 | §112 | Non-Final OA | — | Pending | Feb 29, 2024 |
| 18685267 | Dynamic Splint | Kenai Design, LLC | MOON, MATTHEW RYAN | §102 | Non-Final OA | — | Pending | Feb 21, 2024 | |
| 18428113 | Fastener With Polygonal Counterbore Cutters | Omg Building Products LLC | MAGAR, DIL KUMAR | 3675 | §103 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18567816 | Walking Frame for Adults | Es Healthcare AS | CLEMMONS, STEVE M | 3613 | §103 | Non-Final OA | 69d | Pending | Dec 07, 2023 |
| 18522315 | SECONDARY BATTERY AND POWER CONSUMPTION DEVICE | Sunwoda Mobility Energy Technology Co., Ltd. | TRAN, DAN NGUYEN | §103 | Non-Final OA | — | Pending | Nov 29, 2023 | |
| 18520719 | Wire Hanger For Building Structures | Omg Building Products LLC | MAESTRI, PATRICK J | 3635 | §112 | Final Rejection | 29d | Pending | Nov 28, 2023 |
| 18517586 | GASEOUS FUEL INJECTOR | Stanadyne Operating Company LLC | BOECKMANN, JASON J | 3752 | §103 | Non-Final OA | — | Pending | Nov 22, 2023 |
| 18562550 | Device and Method for Thermal Treatment of a Metal Strip | Andritz Technology And Asset Management GmbH | THOMAS, BINU | 1734 | §103 | Non-Final OA | — | Pending | Nov 20, 2023 |
| 18551768 | OPERATION MONITORING FOR A THICK MATTER CONVEYING SYSTEM | Putzmeister Engineering GmbH | PARK, HYUN D | 2857 | §103 | Non-Final OA | — | Pending | Sep 21, 2023 |
| 18258079 | FRAME FOR CARRYING A CONCRETE-DISTRIBUTION BOOM | Putzmeister Engineering GmbH | REID, MICHAEL ROBERT | 3753 | §103 | Final Rejection | 59d overdue | Pending | Jun 16, 2023 |
| 18247573 | Process for the Production of Cannabinol, Cannabinolic Acid, Cannabivarin, Cannabivarinic Acid and Related Cannabinoids | Bessor Pharma, LLC | GONZALEZ, LUISALBERTO | 1624 | §112 | Final Rejection | — | Pending | Mar 31, 2023 |
| 18102370 | Syringe Type Manual Pressure Brewing Device | Newking Limited | MALATEK, KATHERYN A | 3741 | §112 | Non-Final OA | 42d overdue | Pending | Jan 27, 2023 |
| 18007199 | Novel Compounds for Treating Fibrosis and Inflammatory Conditions | Makscientific, LLC | COUGHLIN, MATTHEW P | 1626 | DP | Final Rejection | 147d overdue | Pending | Jan 27, 2023 |
| 17767760 | Process for the Production of Cannabinoids and Cannabinoid Acids | Bessor Pharma, LLC | KELLY-O'NEILL, YOLANDA LYNNETTE | 1692 | §103 | Final Rejection | 19d | Pending | Apr 08, 2022 |
| 17487661 | BIODEGRADABLE MICRONEEDLE SYSTEM WITH SUSTAINED RELEASE | UNIVERSITY OF CONNECTICUT | KONOPELSKI SNAVEL, SARA ELIZABETH | 1658 | Other | Non-Final OA | 29d | Pending | Sep 28, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial