49 pending office actions • 40 clients • 45 examiners • 32 art units • 0 of 49 (0%) have an AI response strategy ready • 338 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 20 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 20 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (2%) |
| §103 only | 15 (31%) |
| §112 only | 4 (8%) |
| Double-patenting + other | 1 (2%) |
| Multi-statute (no §101) | 28 (57%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BROOME, SHARRIEF I | 3 | 81.6% | +4.1% |
| MCNURLEN, SCOTT THOMAS | 2 | 53.1% | +27.7% |
| GERIDO, DWAN A | 2 | 58.0% | +30.7% |
| SONG, ZHENG B | 1 | 70.1% | +15.3% |
| HUEBNER, ERICA MICHELLE | 1 | 32.9% | +34.3% |
| STEITZ, RACHEL RUNNING | 1 | 54.6% | +25.8% |
| FULTON, KRISTINA ROSE | 1 | 52.7% | +35.4% |
| MEKHLIN, ELI S | 1 | 60.2% | +48.4% |
| KEBEDE, GELILA SOLOMON | 1 | 100.0% | +0.0% |
| HAMMOND, ELLEN CHRISTINA | 1 | 78.1% | +11.7% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18381598 | Heat-Electricity Discrete Power Module Including Two-Way Heat-Dissipation Ceramic Substrates and Manufacturing method of the Same | HALL, VICTORIA KATHLEEN | 67d overdue |
| 18031610 | Method for Semisynthesis of NMN Involving Adenosine | KANE, TREVOR LOGAN | 59d overdue |
| 18031613 | Adenosine-Involved Fully Enzymatic Synthesis Method for NMN | PAPCIAK, SHARON M | 46d overdue |
| 18753947 | SECURITY ALGORITHM SELECTION SYSTEM AND SELECTION METHOD THEREOF | ABRISHAMKAR, KAVEH | 37d overdue |
| 18416822 | Anti-Torque Safety Hook | MORRIS, TAYLOR L | 36d overdue |
| 17039583 | SKIS AND SNOWBOARDS RACK | MCNURLEN, SCOTT THOMAS | 28d overdue |
| 18601044 | CHROMA ENHANCEMENT OPTICAL LENS DEVICE FOR COMPENSATING RED AND GREEN COLOR DEFICIENT VISION AND METHOD THEREOF | BROOME, SHARRIEF I | 10d overdue |
| 18600575 | CHROMA ENHANCEMENT OPTICAL LENS DEVICE FOR COMPENSATING GREEN COLOR DEFICIENT VISION AND METHOD THEREOF | BROOME, SHARRIEF I | 10d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17039583 | SKIS AND SNOWBOARDS RACK | MCNURLEN, SCOTT THOMAS | 28d overdue |
| 19295416 | Longitudinally Gripping Light Device, Focus Adjustable Pistol Type Spotlight and Swivel Hook Pistol Light | SONG, ZHENG B | — |
| 19269004 | PNEUMATIC FOOD EJECTOR | HUEBNER, ERICA MICHELLE | — |
| 19062051 | HAIR WEFT AND PREPARATION PROCESS THEREOF | STEITZ, RACHEL RUNNING | — |
| 19055421 | FIRING-TYPE CONFETTI CANNON DEVICE | FULTON, KRISTINA ROSE | — |
| 19036083 | PEROVSKITE SOLAR CELLS WITH LOCAL SEMI-OPENING PASSIVATION CONTACT STRUCTURE AND PREPARATION METHOD THEREOF | MEKHLIN, ELI S | — |
| 19002703 | GUIDING LARYNGOSCOPE | HAMMOND, ELLEN CHRISTINA | — |
| 18984987 | Car Luggage Rack With Awning And Method Of Luggage Loading/Unloading | MCNURLEN, SCOTT THOMAS | — |
| Art Unit | Apps |
|---|---|
| 2872 | 5 |
| 1797 | 2 |
| 3734 | 2 |
| 3791 | 2 |
| 1657 | 2 |
| 2875 | 1 |
| 3647 | 1 |
| 3772 | 1 |
| 1759 | 1 |
| 3632 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19295416 | Longitudinally Gripping Light Device, Focus Adjustable Pistol Type Spotlight and Swivel Hook Pistol Light | Ningbo Futai Electric Limited | SONG, ZHENG B | 2875 | §103 | Non-Final OA | — | Pending | Aug 08, 2025 |
| 19269004 | PNEUMATIC FOOD EJECTOR | Ningbo Sincere Holding Group Co., Ltd. | HUEBNER, ERICA MICHELLE | 3647 | §103§112 | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19062051 | HAIR WEFT AND PREPARATION PROCESS THEREOF | Wellna Co., Ltd. | STEITZ, RACHEL RUNNING | 3772 | §103 | Final Rejection | — | Pending | Feb 25, 2025 |
| 19055421 | FIRING-TYPE CONFETTI CANNON DEVICE | Novacorp Inc. | FULTON, KRISTINA ROSE | §103 | Non-Final OA | — | Pending | Feb 17, 2025 | |
| 19036083 | PEROVSKITE SOLAR CELLS WITH LOCAL SEMI-OPENING PASSIVATION CONTACT STRUCTURE AND PREPARATION METHOD THEREOF | UNIVERSITY OF SCIENCE AND TECHNOLOGY OF CHINA | MEKHLIN, ELI S | 1759 | §102§103§112 | Non-Final OA | — | Pending | Jan 24, 2025 |
| 19015692 | ADJUSTABLE SEAT POST OF BICYCLE | Cranking Solutions Co., Ltd. | KEBEDE, GELILA SOLOMON | 3632 | §102§103 | Non-Final OA | — | Pending | Jan 10, 2025 |
| 19002703 | GUIDING LARYNGOSCOPE | Zhejiang Ue Medical Corp. | HAMMOND, ELLEN CHRISTINA | 3773 | §102§103§112 | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18984987 | Car Luggage Rack With Awning And Method Of Luggage Loading/Unloading | Shenzhen Gereiur Technology Co. Ltd. | MCNURLEN, SCOTT THOMAS | §103 | Non-Final OA | — | Pending | Dec 17, 2024 | |
| 18966156 | Band Holster for Quick Draw | Shenzhen Egotop Technology Co., Ltd. | VANTERPOOL, LESTER L | §103§112Other | Non-Final OA | — | Pending | Dec 03, 2024 | |
| 18925089 | Water Hardness Test Paper and Preparing Method Thereof | Lili Yu | GERIDO, DWAN A | 1797 | §103 | Final Rejection | — | Pending | Oct 24, 2024 |
| 18925094 | Chlorine Detection Test Paper and Preparing Method Thereof | Lili Yu | GERIDO, DWAN A | 1797 | §103 | Non-Final OA | — | Pending | Oct 24, 2024 |
| 18914249 | WHEEL RIM HAVING REINFORCEMENT STRUCTURE | Hsin Chuan Ind. Co., Ltd. | BELLINGER, JASON R | §102§103§112 | Non-Final OA | — | Pending | Oct 13, 2024 | |
| 18807756 | WALL COLLISION U-TURNING METHOD FOR SWIMMING POOL CLEANING ROBOT, SWIMMING POOL EDGE CLEANING METHOD, AND ELECTRONIC DEVICE | Suzhou Smorobot Technology Co., Ltd. | GONZALEZ, MARIO CARLOS | 1714 | §102§103 | Non-Final OA | — | Pending | Aug 16, 2024 |
| 18793481 | ORAL DRUG TABLET MANUFACTURING DEVICE AND MANUFACTURING METHOD THEREOF | Taiwan Mercury Medical Corporation | NGUYEN, THUKHANH T | §103DP | Non-Final OA | — | Pending | Aug 02, 2024 | |
| 18791433 | BRASSIERE FASTENING BUCKLE, ITS MANUFACTURING METHOD, AND BRASSIERE | Shenzhen Litongda Garment Accessories Co., Ltd. | HUANG, GRACE | 3732 | §103 | Non-Final OA | 3d overdue | Pending | Aug 01, 2024 |
| 18766465 | SECURING DEVICE FOR HONEYCOMB BLINDS | Ching Feng Home Fashions Co., Ltd. | HANES JR., JOHN | 3634 | §102§103 | Final Rejection | — | Pending | Jul 08, 2024 |
| 18753947 | SECURITY ALGORITHM SELECTION SYSTEM AND SELECTION METHOD THEREOF | Chelpis Quantum Corporation | ABRISHAMKAR, KAVEH | 2494 | §103§112 | Non-Final OA | 37d overdue | Pending | Jun 25, 2024 |
| 18741666 | BIKE CARRIER ASSEMBLY | King Rack Industrial Co., Ltd. | HELVEY, PETER N. | 3734 | §102§103 | Final Rejection | 21d | Pending | Jun 12, 2024 |
| 18736095 | ORAL PEPTIDE DRUG STRUCTURE AND MANUFACTURING METHOD THEREOF | Merdury Biopharmaceutical Corporation | STEINKE, SEAN JAMES | 1619 | §103§112 | Non-Final OA | — | Pending | Jun 06, 2024 |
| 18733711 | ATTACHABLE LEG MASSAGER FOR CHAIR | Zhejiang Qikai Electromechanical Technology Co., Ltd. | WRIGHT, AMIRAH DANNYE | §103 | Non-Final OA | — | Pending | Jun 04, 2024 | |
| 18680338 | MULTI-CALIBER SELF-TIGHTENING LOWER RECEIVER VISE BLOCK | Strike Ip LLC | KREILING, AMANDA J | §103§112 | Non-Final OA | — | Pending | May 31, 2024 | |
| 18660013 | Method and System of Non-invasive Optical Rotation Angle Sensing Polarimeter for Aqueous Glucose Concentration Measurement | Allied Biotech Development Inc. | HENSON, DEVIN B | 3791 | §112 | Non-Final OA | — | Pending | May 09, 2024 |
| 18657705 | VIBRATING MASSAGER | Dongguan Xiqin Electrical Appliances Co.,Ltd | MILLER, CHRISTOPHER E | §102§103§112 | Non-Final OA | — | Pending | May 07, 2024 | |
| 18601938 | CHROMA ENHANCEMENT OPTICAL LENS DEVICE FOR COMPENSATING RED COLOR DEFICIENT VISION AND METHOD THEREOF | Foresight Optical Ltd. | BROOME, SHARRIEF I | 2872 | §102§112Other | Non-Final OA | 9d overdue | Pending | Mar 11, 2024 |
| 18601044 | CHROMA ENHANCEMENT OPTICAL LENS DEVICE FOR COMPENSATING RED AND GREEN COLOR DEFICIENT VISION AND METHOD THEREOF | Foresight Optical Ltd. | BROOME, SHARRIEF I | 2872 | §102§112Other | Non-Final OA | 10d overdue | Pending | Mar 11, 2024 |
| 18600528 | INFRARED-FILTERING THERMAL-ISOLATIVE OPTICAL LENS DEVICE AND METHOD THEREOF FOR WHOLE-VISIBLE-SPECTRUM ENHANCEMENT | Foresight Optical Ltd. | DUNNING, RYAN S | 2872 | §112 | Non-Final OA | 44d overdue | Pending | Mar 08, 2024 |
| 18600575 | CHROMA ENHANCEMENT OPTICAL LENS DEVICE FOR COMPENSATING GREEN COLOR DEFICIENT VISION AND METHOD THEREOF | Foresight Optical Ltd. | BROOME, SHARRIEF I | 2872 | §102§112Other | Non-Final OA | 10d overdue | Pending | Mar 08, 2024 |
| 18582073 | Water switching structure of gardening water sprayer | Shin Tai Spurt Water Of The Garden Tools Co., Ltd. | FORD, RENE D | 3741 | §112 | Final Rejection | — | Pending | Feb 20, 2024 |
| 18416822 | Anti-Torque Safety Hook | BEXUS INDUSTRIES CO., LTD. | MORRIS, TAYLOR L | 3631 | §103§112Other | Non-Final OA | 36d overdue | Pending | Jan 18, 2024 |
| 18406012 | Electronic device lock | Ingamar Co., Ltd. | LUGO, CARLOS | 3675 | §103 | Non-Final OA | 42d overdue | Pending | Jan 05, 2024 |
| 18402743 | SUPPORT PLATE ADJUSTMENT STRUCTURE OF VERTICAL BAND SAW MACHINE | King Saw Machinery Ltd. | DAVIES, SAMUEL ALLEN | 3724 | §112 | Final Rejection | — | Pending | Jan 03, 2024 |
| 18395737 | Screen Protector Installation Tool | Shenzhen Icaree Technology Co., Ltd. | SENGUPTA, SONYA MAZUMDAR | 1745 | §102§103Other | Final Rejection | 28d | Pending | Dec 25, 2023 |
| 18392825 | Semiconductor Wafer Cleaning Solution and Cleaning Method Thereof | Star Tracking Material Co. Ltd. | HARRIS, BRITTANY SHARON | 1761 | §103 | Final Rejection | 23d overdue | Pending | Dec 21, 2023 |
| 18539136 | Adjustable Respiratory System of Concentration - Modulable Hydrogen and Oxygen Ventilator | North-Vision Tech. Inc. | MOON, MATTHEW RYAN | §103§112 | Non-Final OA | — | Pending | Dec 13, 2023 | |
| 18508215 | Garden Hose Nozzle | Shin Tai Spurt Water Of The Garden Tools Co., Ltd. | HO, ANNA THI | 3752 | §102§103§112 | Final Rejection | — | Pending | Nov 13, 2023 |
| 18381598 | Heat-Electricity Discrete Power Module Including Two-Way Heat-Dissipation Ceramic Substrates and Manufacturing method of the Same | Sentec E&E Co., Ltd. | HALL, VICTORIA KATHLEEN | 2897 | §103§112 | Non-Final OA | 67d overdue | Pending | Oct 18, 2023 |
| 18241242 | Portable Electric Soldering Iron Tool | Genzhang Ye | KIM, TAE JUN | 3799 | §103 | Non-Final OA | — | Pending | Sep 01, 2023 |
| 18227964 | BUCKLE-TYPE QUICK RELEASE WITH BIDIRECTIONAL LENGTH ADJUSTABILITY | Ful Chee Ent Co., Ltd. | COMINO, EVA L | 3615 | §103 | Final Rejection | 42d overdue | Pending | Jul 30, 2023 |
| 18227309 | PRESSURIZATION CONTROL METHOD FOR BLOOD PRESSURE MEASUREMENT AND BLOOD PRESSURE MEASUREMENT DEVICE USING THE SAME | Avita Corporation | NATNITHITHADHA, NAVIN | 3791 | §102§103 | Final Rejection | — | Pending | Jul 28, 2023 |
| 18212628 | OPTICAL LENS DEVICE HAVING AN ANTI-FOG THIN FILM AND MANUFACTURING METHOD THEREOF | Foresight Optical Ltd. | LIU, SHAN | 2871 | §102§103 | Final Rejection | 14d | Pending | Jun 21, 2023 |
| 18212107 | COMPOSITE HIGH SCRATCH-RESISTANT OPTICAL LENS DEVICE AND MANUFACTURING METHOD THEREOF | Foresight Optical Ltd. | FLORES JR, DONALD M | 1781 | §103§112 | Final Rejection | — | Pending | Jun 20, 2023 |
| 18031613 | Adenosine-Involved Fully Enzymatic Synthesis Method for NMN | Rubyberries Biotechnologies Co., Ltd. | PAPCIAK, SHARON M | 1657 | §102§103 | Final Rejection | 46d overdue | Pending | Apr 12, 2023 |
| 18031610 | Method for Semisynthesis of NMN Involving Adenosine | Rubyberries Biotechnologies Co., Ltd. | KANE, TREVOR LOGAN | 1657 | §102§103§112 | Final Rejection | 59d overdue | Pending | Apr 12, 2023 |
| 17977829 | METHOD FOR MAKING CANDIES | Boncha Boncha International Company Limited | MORENO, LARK JULIA | 1793 | §103 | Non-Final OA | — | Pending | Oct 31, 2022 |
| 17903912 | PIPE PROCESSING MACHINE WITH AUXILIARY SUPPORT AND SORTING STRUCTURE | Chiao Sheng Machinery Co., Ltd. | TRAN, TIFFANY T | 3761 | §103§112 | Non-Final OA | 60d | Pending | Sep 06, 2022 |
| 17848170 | BIOMOLECULAR CHARACTERISTIC IDENTIFICATION METHOD AND SYSTEM THEREOF FOR TAIWAN TILAPIA STRAINS | National Taiwan Ocean University | GOLDBERG, JEANINE ANNE | 1682 | §101§102§112 | Non-Final OA | 9d overdue | Pending | Jun 23, 2022 |
| 17561036 | ACCESSORY CONTROL SYSTEM FOR VEHICLE | Acumen Robot Intelligence, Inc. | ALLEN, STEPHONE B | 2872 | §103 | Final Rejection | 59d overdue | Pending | Dec 23, 2021 |
| 17335124 | Pharmaceutical Composition for Improving Respiratory Damage and Use for Manufacturing Pharmaceutical Composition for Improving Respiratory Damage | Ming-Chien Hung | ARNOLD, ERNST V | 1613 | §103Other | Non-Final OA | — | Pending | Jun 01, 2021 |
| 17039583 | SKIS AND SNOWBOARDS RACK | King Rack Industrial Co., Ltd. | MCNURLEN, SCOTT THOMAS | 3734 | §103§112 | Final Rejection | 28d overdue | Pending | Sep 30, 2020 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial