22 pending office actions • 10 art units • 20 examiners • 0 of 22 (0%) have an AI response strategy ready • 26 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 7 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 7 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (5%) |
| §103 only | 7 (32%) |
| §102 only | 1 (5%) |
| Multi-statute (no §101) | 13 (59%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MAYO III, WILLIAM H | 2 | 77.1% | -3.8% |
| NGUYEN, CHAU N | 2 | 68.1% | +14.0% |
| AFFUL, CHRISTOPHER M | 1 | 75.1% | +10.2% |
| SAAD, ERIN BARRY | 1 | 72.2% | +11.5% |
| DU, HAIXIA | 1 | 86.4% | +17.9% |
| BURRELL, KATELYNNE RUTH | 1 | 56.7% | -0.6% |
| SHAH, NEEL D | 1 | 86.9% | +7.5% |
| ZEC, FILIP | 1 | 65.5% | +14.0% |
| ALIE, GHASSEM | 1 | 69.2% | +32.8% |
| HOLLWEG, THOMAS A | 1 | 53.1% | +31.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18960502 | Quality control method for a cable specimen | SHAH, NEEL D | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18821256 | REMOVAL OF INSULATION SHEATH FROM POWER CABLE | ALIE, GHASSEM | 35d overdue |
| 18232348 | Method for designing and manufacturing high voltage electric components | PAN, YUHUI R | 24d overdue |
| 18278406 | THERMOPLASTIC INSULATION SYSTEM | NGUYEN, CHAU N | 9d overdue |
| 18723797 | Termination for a cable for transporting high-voltage or very-high-voltage electricity, and method for preparing a cable end termination | MAYO III, WILLIAM H | 8d overdue |
| 18232344 | Method for determining a quality of a cable surface | TON, TRI T | 40d |
| 19327887 | TRANSFER LINE ARRANGEMENT | AFFUL, CHRISTOPHER M | — |
| 19033673 | METHOD OF JOINTING CABLES | SAAD, ERIN BARRY | — |
| 18977952 | Method for manufacturing and inspecting a factory joint during installation | DU, HAIXIA | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18821256 | REMOVAL OF INSULATION SHEATH FROM POWER CABLE | ALIE, GHASSEM | 35d overdue |
| 18278406 | THERMOPLASTIC INSULATION SYSTEM | NGUYEN, CHAU N | 9d overdue |
| 19327887 | TRANSFER LINE ARRANGEMENT | AFFUL, CHRISTOPHER M | — |
| 19033673 | METHOD OF JOINTING CABLES | SAAD, ERIN BARRY | — |
| 18977952 | Method for manufacturing and inspecting a factory joint during installation | DU, HAIXIA | — |
| 18912476 | System and Method for Transferring Temperature Sensitive Fluids | ZEC, FILIP | — |
| 18764916 | Method for manufacturing a composite electric power cable | HOLLWEG, THOMAS A | — |
| 18393330 | Novel T-connector design for robust and versatile high voltage connections | NGUYEN, CHAU N | — |
| Art Unit | Apps |
|---|---|
| 2841 | 5 |
| 3654 | 2 |
| 2877 | 2 |
| 3753 | 1 |
| 1735 | 1 |
| 3724 | 1 |
| 2858 | 1 |
| 1789 | 1 |
| 2116 | 1 |
| 2896 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19327887 | TRANSFER LINE ARRANGEMENT | AFFUL, CHRISTOPHER M | 3753 | §102§103 | Non-Final OA | — | Pending | Sep 12, 2025 |
| 19033673 | METHOD OF JOINTING CABLES | SAAD, ERIN BARRY | 1735 | §103§112 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 18977952 | Method for manufacturing and inspecting a factory joint during installation | DU, HAIXIA | — | §102§112Other | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18972497 | Method for winding a cable onto a cable reel | BURRELL, KATELYNNE RUTH | 3654 | §102§103§112 | Non-Final OA | — | Pending | Dec 06, 2024 |
| 18960502 | Quality control method for a cable specimen | SHAH, NEEL D | 2877 | §103 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18912476 | System and Method for Transferring Temperature Sensitive Fluids | ZEC, FILIP | — | §103 | Non-Final OA | — | Pending | Oct 10, 2024 |
| 18821256 | REMOVAL OF INSULATION SHEATH FROM POWER CABLE | ALIE, GHASSEM | 3724 | §102§103§112 | Final Rejection | 35d overdue | Pending | Aug 30, 2024 |
| 18764916 | Method for manufacturing a composite electric power cable | HOLLWEG, THOMAS A | — | §103§112 | Non-Final OA | — | Pending | Jul 05, 2024 |
| 18763657 | System for online monitoring of one or more electric cables in an electrical distribution grid | LE, THANG XUAN | 2858 | §102 | Non-Final OA | 9d | Pending | Jul 03, 2024 |
| 18723797 | Termination for a cable for transporting high-voltage or very-high-voltage electricity, and method for preparing a cable end termination | MAYO III, WILLIAM H | 2841 | §102§103 | Non-Final OA | 8d overdue | Pending | Jun 24, 2024 |
| 18742849 | SUBSEA POWER CABLE | NGUYEN, DONGHAI D | 2841 | §102§103 | Non-Final OA | — | Pending | Jun 13, 2024 |
| 18393330 | Novel T-connector design for robust and versatile high voltage connections | NGUYEN, CHAU N | 2841 | §103§112 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18540385 | JOINT WATER BARRIER | MAYO III, WILLIAM H | 2841 | §103 | Non-Final OA | — | Pending | Dec 14, 2023 |
| 18539501 | Clamp for holding a flexible slender structure | RIVERA, WILLIAM ARAUZ | — | §102§103 | Non-Final OA | — | Pending | Dec 14, 2023 |
| 18564134 | DEVICE FOR STORING, TRANSPORTING AND INSTALLING ELECTRICAL WIRES AND CABLES | MELIKA, ERMIA EMAD | 3654 | §103 | Non-Final OA | — | Pending | Nov 27, 2023 |
| 18384941 | DEVICE AND METHOD FOR HEATING AND SIMULTANEOUSLY APPLYING A HIGH VOLTAGE TO AN ELECTRIC CABLE | TRAN, TIFFANY T | — | §103 | Non-Final OA | — | Pending | Oct 30, 2023 |
| 18288865 | Two-layer buckling resistant lead-free water barrier | STEELE, JENNIFER A | 1789 | §103 | Non-Final OA | — | Pending | Oct 30, 2023 |
| 18278406 | THERMOPLASTIC INSULATION SYSTEM | NGUYEN, CHAU N | 2841 | §102§112Other | Final Rejection | 9d overdue | Pending | Aug 23, 2023 |
| 18232348 | Method for designing and manufacturing high voltage electric components | PAN, YUHUI R | 2116 | §102§103 | Final Rejection | 24d overdue | Pending | Aug 09, 2023 |
| 18232344 | Method for determining a quality of a cable surface | TON, TRI T | 2877 | §101 | Non-Final OA | 40d | Pending | Aug 09, 2023 |
| 18139086 | ASIT laser scanning on cable and assembly defects | TUGBANG, ANTHONY D | 2896 | §103 | Non-Final OA | 75d | Pending | Apr 25, 2023 |
| 18138023 | 3-PHASE SUPERCONDUCTING CABLE SYSTEM WITH REDUNDANCY | WARTALOWICZ, PAUL A | — | §102§103§112 | Non-Final OA | — | Pending | Apr 21, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial