51 pending office actions • 28 art units • 45 examiners • 0 of 51 (0%) have an AI response strategy ready • 166 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 19 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 19 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 4 (8%) |
| §103 only | 27 (53%) |
| §112 only | 2 (4%) |
| Double-patenting + other | 2 (4%) |
| Multi-statute (no §101) | 15 (29%) |
| No statute on record | 1 (2%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KANG, EDWIN G | 3 | 64.0% | +67.8% |
| RUPPERT, ERIC S | 2 | 59.9% | +24.3% |
| EMPIE, NATHAN H | 2 | 43.8% | +43.0% |
| LIU, CHRIS Q | 2 | 69.1% | +39.3% |
| BEHRENS JR., ANDRES E | 2 | 53.7% | +18.0% |
| LEE, BENNY T | 1 | 87.4% | +25.3% |
| TSAI, JAMES T | 1 | 62.5% | +56.9% |
| HUYNH, KHOA B | 1 | 80.0% | +10.0% |
| CONSTANTINE, CHARLES Z | 1 | 59.0% | +48.8% |
| DACE DENITO, ALEXANDRA GERALDINE | 1 | 60.3% | +35.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18112301 | SEARCHLIGHT DISTRIBUTED QOS MANAGEMENT | HUYNH, KHOA B | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18196662 | MODULAR HEAT EXCHANGER FOR AN AIRCRAFT POWERPLANT | RUPPERT, ERIC S | 45d overdue |
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | MEILLER, SEAN V | 32d overdue |
| 18121424 | COUPLING OPTICAL FIBERS AND FLUID PASSAGES | HAYES, MARY A | 19d overdue |
| 18408159 | DIAMOND WHISPERING-GALLERY MODE RESONATOR | LEE, BENNY T | 9d overdue |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | LIU, CHRIS Q | 1d overdue |
| 18345835 | RESILIENT BUILD PLATES FOR POWDER BED FUSION - LASER ADDITIVE MANUFACTURING | SCHLEIS, DANIEL J | 53d |
| 18209260 | THIN FILM TEMPERATURE SENSOR AND METHOD | ADJAGBE, MAXIME M | 57d |
| 18207527 | COMPOSITE HEAT EXCHANGE APPARATUS FOR A TURBINE ENGINE | DUONG, THO V | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18196662 | MODULAR HEAT EXCHANGER FOR AN AIRCRAFT POWERPLANT | RUPPERT, ERIC S | 45d overdue |
| 18114691 | FUEL INJECTOR AIR SWIRLER STRUCTURE WITH CANTED FLOW GUIDE SURFACE | KANG, EDWIN G | 42d overdue |
| 18408159 | DIAMOND WHISPERING-GALLERY MODE RESONATOR | LEE, BENNY T | 9d overdue |
| 17576971 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ANALYSIS FOR PATHOGENIC TARGETS | DACE DENITO, ALEXANDRA GERALDINE | 8d overdue |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | LIU, CHRIS Q | 1d overdue |
| 18123040 | THREE-DIMENSIONAL WEAVE WITH SACRIFICIAL Z-FIBERS FOR IMPROVED CERAMIC MATRIX COMPOSITE MICROSTRUCTURE | EMPIE, NATHAN H | 9d |
| 18119130 | HEAT EXCHANGER WITH CROSSING HEAT EXCHANGE TUBES | RUPPERT, ERIC S | 22d |
| 18299679 | Event Based Analysis and Saliency Detection and Classification of Signals | TSAI, JAMES T | — |
| Art Unit | Apps |
|---|---|
| 3741 | 6 |
| 3745 | 5 |
| 3761 | 4 |
| 3763 | 3 |
| 1781 | 2 |
| 3723 | 2 |
| 1712 | 2 |
| 1735 | 2 |
| 2189 | 2 |
| 1789 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18408159 | DIAMOND WHISPERING-GALLERY MODE RESONATOR | LEE, BENNY T | 2843 | §103§112 | Non-Final OA | 9d overdue | Pending | Jan 09, 2024 |
| 18299679 | Event Based Analysis and Saliency Detection and Classification of Signals | TSAI, JAMES T | 2147 | §103 | Final Rejection | — | Pending | Apr 12, 2023 |
| 18112301 | SEARCHLIGHT DISTRIBUTED QOS MANAGEMENT | HUYNH, KHOA B | 2462 | §103 | Final Rejection | — | Pending | Feb 21, 2023 |
| 17576970 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ANALYSIS FOR PATHOGENIC TARGETS | CONSTANTINE, CHARLES Z | 1657 | §103 | Non-Final OA | — | Pending | Jan 16, 2022 |
| 17576971 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ANALYSIS FOR PATHOGENIC TARGETS | DACE DENITO, ALEXANDRA GERALDINE | 1636 | §103 | Non-Final OA | 8d overdue | Pending | Jan 16, 2022 |
| 17576972 | LOOP-MEDIATED ISOTHERMAL AMPLIFICATION (LAMP) ANALYSIS FOR PATHOGENIC TARGETS | JONES, CHRISTINE MICHELLE | 1682 | §103§112DP | Non-Final OA | — | Pending | Jan 16, 2022 |
| 18345835 | RESILIENT BUILD PLATES FOR POWDER BED FUSION - LASER ADDITIVE MANUFACTURING | SCHLEIS, DANIEL J | 1784 | §102§103 | Final Rejection | 53d | Pending | Jun 30, 2023 |
| 18209260 | THIN FILM TEMPERATURE SENSOR AND METHOD | ADJAGBE, MAXIME M | 3745 | §102§103 | Non-Final OA | 57d | Pending | Jun 13, 2023 |
| 18207527 | COMPOSITE HEAT EXCHANGE APPARATUS FOR A TURBINE ENGINE | DUONG, THO V | 3700 | §102§103§112 | Non-Final OA | — | Pending | Jun 08, 2023 |
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | MEILLER, SEAN V | 3741 | §103§112 | Final Rejection | 32d overdue | Pending | May 26, 2023 |
| 18202709 | THRUST VECTORING EXHAUST NOZZLE FOR AIRCRAFT PROPULSION SYSTEM | AMAR, MARC J | 3741 | §103§112 | Non-Final OA | — | Pending | May 26, 2023 |
| 18202640 | PREFORM TAPERED HOLE PRESS FOR IMPROVED CVI-CMC MICROSTRUCTURE | YANG, ZHEREN J | 1781 | §103§112 | Final Rejection | — | Pending | May 26, 2023 |
| 18201786 | PREDICTIVE MODEL FOR MULTI-LASER POWDER BED FUSION ADDITIVE MANUFACTURING | BORISSOV, IGOR N | — | — | Non-Final OA | — | Pending | May 25, 2023 |
| 18196662 | MODULAR HEAT EXCHANGER FOR AN AIRCRAFT POWERPLANT | RUPPERT, ERIC S | 3763 | §102§103 | Non-Final OA | 45d overdue | Pending | May 12, 2023 |
| 18143772 | METHOD AND SYSTEM FOR SHARING COLLABORATIVE DIGITAL MODELS | SENSENIG, SHAUN D | 3629 | §101§103 | Non-Final OA | — | Pending | May 05, 2023 |
| 18143150 | MACHINE CONTROL FOR GRINDING MACHINE | DION, MARCEL T | 3723 | §103§112 | Non-Final OA | — | Pending | May 04, 2023 |
| 18143143 | MACHINE CONTROL FOR DYNABRAID MACHINE | MARKMAN, MAKENA | 3723 | §103 | Final Rejection | 44d overdue | Pending | May 04, 2023 |
| 18304771 | HEAT EXCHANGER SYSTEMS AND DEVICES FOR INCREASED DURABILITY | HEINLE, COURTNEY D | 3762 | §103§112 | Final Rejection | — | Pending | Apr 21, 2023 |
| 18137756 | PROPULSOR BLADE IMAGING ASSEMBLY FOR AN AIRCRAFT PROPULSION SYSTEM | LEE, HWA S | 2877 | §103DP | Non-Final OA | — | Pending | Apr 21, 2023 |
| 18194937 | PROBABILISTIC MODEL, SYSTEM AND APPLICATION FOR COMPONENT DESIGN OPTIMIZATION | CIRNU, ALEXANDRU | — | §101§102§103§112 | Non-Final OA | — | Pending | Apr 03, 2023 |
| 18187796 | GEARED GAS TURBINE ENGINE WITH FRONT SECTION MOMENT STIFFNESS RELATIONSHIPS | WONG, ELTON K | 3745 | §103 | Non-Final OA | 46d overdue | Pending | Mar 22, 2023 |
| 18123040 | THREE-DIMENSIONAL WEAVE WITH SACRIFICIAL Z-FIBERS FOR IMPROVED CERAMIC MATRIX COMPOSITE MICROSTRUCTURE | EMPIE, NATHAN H | 1712 | §103 | Non-Final OA | 9d | Pending | Mar 17, 2023 |
| 18121781 | MITIGATING DOWN SKIN EFFECTS IN ADDITIVE MANUFACTURING | HEVEY, JOHN A | 1735 | §103§112 | Non-Final OA | — | Pending | Mar 15, 2023 |
| 18121424 | COUPLING OPTICAL FIBERS AND FLUID PASSAGES | HAYES, MARY A | 2874 | §102§103§112 | Non-Final OA | 19d overdue | Pending | Mar 14, 2023 |
| 18119130 | HEAT EXCHANGER WITH CROSSING HEAT EXCHANGE TUBES | RUPPERT, ERIC S | 3763 | §103 | Final Rejection | 22d | Pending | Mar 08, 2023 |
| 18118466 | METHOD OF REDUCING SURFACE DEFORMATION FROM Z-CHANNEL CREATION | GROUX, JENNIFER LILA | 1754 | §102§103§112 | Final Rejection | — | Pending | Mar 07, 2023 |
| 18117450 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | OLIVA, STEPHANIE RENEE | 3761 | §103 | Non-Final OA | — | Pending | Mar 05, 2023 |
| 18114691 | FUEL INJECTOR AIR SWIRLER STRUCTURE WITH CANTED FLOW GUIDE SURFACE | KANG, EDWIN G | 3741 | §103 | Non-Final OA | 42d overdue | Pending | Feb 27, 2023 |
| 18173348 | METHOD FOR DESIGNING ARCHITECTURE FOR MICROWAVE COMMUNICATION AND POWER NETWORKS | HOCKER, JOHN PAUL | 2189 | §101§102§112 | Non-Final OA | — | Pending | Feb 23, 2023 |
| 18168836 | POWER BEAMING OF MICROWAVE RADIATION FOR ANTI-ICING | BACHNER, ROBERT G | 2898 | §103 | Non-Final OA | — | Pending | Feb 14, 2023 |
| 18106064 | CONFORMAL HEAT EXCHANGER WITH TRIANGULAR OFFSET STRIP FINS | ALVARE, PAUL | 3763 | §103 | Final Rejection | 46d overdue | Pending | Feb 06, 2023 |
| 18101149 | TWO PIECE HOLLOW-VANE ASSEMBLY JOINED VIA BRAZING | SAAD, ERIN BARRY | 1735 | §103 | Non-Final OA | — | Pending | Jan 25, 2023 |
| 18152482 | EDM ELECTRODE WITH ENRICHED SURFACE REGION | TRAN, THIEN S | 3761 | §103 | Non-Final OA | — | Pending | Jan 10, 2023 |
| 18092840 | GEOMETRICAL CALCULATIONS FOR TARGETED LOCAL FEM MESH REFINEMENT IN FINISH TURNING SYSTEMS AND METHODS | HAGLER, JOHN DAVID | 2189 | §101§103§112 | Non-Final OA | — | Pending | Jan 03, 2023 |
| 18086755 | ELECTRICALLY BOOSTED TURBINE COOLING AIR | NG, HENRY | 3741 | §103 | Final Rejection | 17d overdue | Pending | Dec 22, 2022 |
| 17985863 | FUEL INJECTOR ASSEMBLY FOR GAS TURBINE ENGINE | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Nov 13, 2022 |
| 17951370 | INTEGRATED ENVIRONMENTAL CONTROL AND BUFFER AIR SYSTEM | KANG, EDWIN G | 3741 | §103 | Non-Final OA | — | Pending | Sep 23, 2022 |
| 17891763 | CENTRALIZED SECURITY APPROVAL FOR DISTRIBUTED DECENTRALIZED CONTROL SYSTEMS FOR AIRCRAFT ENGINES | KHADKA, AMIT | 2432 | §103 | Final Rejection | — | Pending | Aug 19, 2022 |
| 17885868 | SYSTEMS AND METHODS FOR HMDA/MISTUNING ANALYSIS FOR INSPECTED BLADED ROTORS | BUI, ANDREW THANH | 3745 | §102§103§112 | Non-Final OA | — | Pending | Aug 11, 2022 |
| 17866016 | HIGH ENTROPY CERAMIC FOR PROTECTION OR MULTI-LAYER IFC | MCKINNON, LASHAWNDA T | 1789 | §103 | Final Rejection | 8d | Pending | Jul 15, 2022 |
| 17862207 | SYSTEMS AND METHODS FOR INSPECTED BLADED ROTOR ANALYSIS | SEABE, JUSTIN D | 3745 | §103 | Non-Final OA | — | Pending | Jul 11, 2022 |
| 17738513 | WELD REPAIR SYSTEM | LIU, CHRIS Q | 3761 | §112 | Final Rejection | — | Pending | May 06, 2022 |
| 17711600 | ENVIRONMENTAL BARRIER COATING | LE, HOA T | 1788 | §112 | Non-Final OA | 139d overdue | Pending | Apr 01, 2022 |
| 17554657 | INTRODUCTION OF METALLIC PARTICLES TO ENABLE FORMATION OF METALLIC CARBIDES IN A MATRIX | EMPIE, NATHAN H | 1712 | §103 | Non-Final OA | — | Pending | Dec 17, 2021 |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | LIU, CHRIS Q | 3761 | §102§103§112 | Final Rejection | 1d overdue | Pending | Aug 13, 2021 |
| 17240347 | NANOFIBER INTERLAMINAR LAYER FOR CERAMIC MATRIX COMPOSITES | PIZIALI, ANDREW T | 1789 | §103 | Non-Final OA | — | Pending | Apr 26, 2021 |
| 16859180 | ENVIRONMENTAL BARRIER COATING AND METHOD OF APPLYING AN ENVIRONMENTAL BARRIER COATING | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Apr 27, 2020 |
| 16796227 | ROTOR BLADE AND METHOD FOR FORMING A ROTOR BLADE | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | 49d overdue | Pending | Feb 20, 2020 |
| 16723360 | REINFORCED CERAMIC MATRIX COMPOSITE AND METHOD OF MANUFACTURE | BEHRENS JR., ANDRES E | 1741 | §103 | Non-Final OA | — | Pending | Dec 20, 2019 |
| 14865038 | Multi-Phase Pre-Reacted Thermal Barrier Coatings and Process Therefor | MCCLURE, CHRISTINA D | 1718 | §103 | Final Rejection | 20d | Pending | Sep 25, 2015 |
| 14726947 | Uniform Thickness Thermal Barrier Coating For Non Line of Sight and Line of Sight Areas | KHAN, TAHSEEN | 1781 | §103 | Final Rejection | — | Pending | Jun 01, 2015 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial