17 pending office actions • 10 art units • 16 examiners • 0 of 17 (0%) have an AI response strategy ready • 17 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 8 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 8 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 13 (76%) |
| §102 only | 3 (18%) |
| §112 only | 1 (6%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| ASMAT UCEDA, MARTIN ANTONIO | 2 | 84.0% | +10.8% |
| DINH, BACH T | 1 | 55.2% | +31.6% |
| INGE, JOSEPH N | 1 | 75.5% | +23.8% |
| MCNICHOLS, ERET C | 1 | 74.9% | -15.9% |
| MILLNER, MONICA E | 1 | 77.3% | +22.4% |
| CRUM, JACOB R | 1 | 74.1% | +28.5% |
| ALIZADA, OMEED | 1 | 77.6% | +32.6% |
| LAM, ALEX W | 1 | 92.1% | +1.4% |
| BABAA, NAEL N | 1 | 77.1% | +3.2% |
| WUJCIAK, ALFRED J | 1 | 74.8% | +11.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18842331 | CAPACITY RECOVERY AND MULTI-SOURCE POWER DISTRIBUTION | LAM, ALEX W | 8d overdue |
| 19042235 | AN ADAPTER FOR A CIRCUIT BREAKER OF A POWER SYSTEM | ASMAT UCEDA, MARTIN ANTONIO | — |
| 18818028 | HYBRID SELF-FIXTURING FRAME | ASMAT UCEDA, MARTIN ANTONIO | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18917243 | CABLE CARRIER FOR A POWER SYSTEM | MILLNER, MONICA E | 45d overdue |
| 19098664 | DATA CENTER CHILLING SYSTEM WITH WASTE HEAT RECYCLING | DINH, BACH T | 12d |
| 19095367 | MEDIUM AND LOW VOLTAGE POWER CENTER | INGE, JOSEPH N | 55d |
| 19042235 | AN ADAPTER FOR A CIRCUIT BREAKER OF A POWER SYSTEM | ASMAT UCEDA, MARTIN ANTONIO | — |
| 18889540 | High-Density Data Center Computer Cabinet | CRUM, JACOB R | — |
| 18842316 | SOLID-STATE POWER CONTROLLER WITH TRANSFORMER SOFT-START | ALIZADA, OMEED | — |
| 18818028 | HYBRID SELF-FIXTURING FRAME | ASMAT UCEDA, MARTIN ANTONIO | — |
| 18593269 | MODULAR FLOOR STAND SYSTEM | WUJCIAK, ALFRED J | — |
| Art Unit | Apps |
|---|---|
| 3763 | 3 |
| 3632 | 2 |
| 2835 | 2 |
| 1726 | 1 |
| 2836 | 1 |
| 2841 | 1 |
| 2842 | 1 |
| 3636 | 1 |
| 1721 | 1 |
| 2178 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19098664 | DATA CENTER CHILLING SYSTEM WITH WASTE HEAT RECYCLING | DINH, BACH T | 1726 | §103 | Final Rejection | 12d | Pending | Apr 02, 2025 |
| 19095367 | MEDIUM AND LOW VOLTAGE POWER CENTER | INGE, JOSEPH N | 2836 | §103 | Non-Final OA | 55d | Pending | Mar 31, 2025 |
| 19042235 | AN ADAPTER FOR A CIRCUIT BREAKER OF A POWER SYSTEM | ASMAT UCEDA, MARTIN ANTONIO | — | §103 | Non-Final OA | — | Pending | Jan 31, 2025 |
| 18947456 | HANGER ASSEMBLY | MCNICHOLS, ERET C | 3632 | §102 | Non-Final OA | 56d | Pending | Nov 14, 2024 |
| 18917243 | CABLE CARRIER FOR A POWER SYSTEM | MILLNER, MONICA E | 3632 | §103 | Final Rejection | 45d overdue | Pending | Oct 16, 2024 |
| 18889540 | High-Density Data Center Computer Cabinet | CRUM, JACOB R | — | §103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18842316 | SOLID-STATE POWER CONTROLLER WITH TRANSFORMER SOFT-START | ALIZADA, OMEED | — | §103 | Non-Final OA | — | Pending | Aug 28, 2024 |
| 18818028 | HYBRID SELF-FIXTURING FRAME | ASMAT UCEDA, MARTIN ANTONIO | 2841 | §103 | Final Rejection | — | Pending | Aug 28, 2024 |
| 18842331 | CAPACITY RECOVERY AND MULTI-SOURCE POWER DISTRIBUTION | LAM, ALEX W | 2842 | §102 | Non-Final OA | 8d overdue | Pending | Aug 28, 2024 |
| 18670716 | SYSTEMS AND METHODS FOR CONTROLLING PUMPED TWO-PHASE REFRIGERANT TEMPERATURE | BABAA, NAEL N | 3763 | §103 | Non-Final OA | — | Pending | May 21, 2024 |
| 18593269 | MODULAR FLOOR STAND SYSTEM | WUJCIAK, ALFRED J | 3636 | §103 | Final Rejection | — | Pending | Mar 01, 2024 |
| 18583963 | Zero-U Coolant Distribution Unit | MUIR, MATTHEW SINCLAIR | 2835 | §103 | Final Rejection | — | Pending | Feb 22, 2024 |
| 18409754 | SYSTEMS AND METHODS FOR TWO-PHASE COLD PLATE COOLING | TAVAKOLDAVANI, KAMRAN | 3763 | §103 | Final Rejection | 55d | Pending | Jan 10, 2024 |
| 18531757 | Semi-automatic portable solar controller | DAM, DUSTIN Q | 1721 | §112 | Non-Final OA | 49d overdue | Pending | Dec 07, 2023 |
| 18481981 | HEAT EXCHANGER FREEZE PROTECTION | CIRIC, LJILJANA V | 3763 | §102 | Non-Final OA | 112d overdue | Pending | Oct 05, 2023 |
| 18351341 | TWO-PHASE IMMERSION COOLING SYSTEM | OXENKNECHT, KYLE | 2835 | §103 | Non-Final OA | — | Pending | Jul 12, 2023 |
| 18215521 | SYSTEM AND METHOD FOR SIMULATION AND DEPLOYMENT OF CUSTOMIZED USER INTERFACE (UI) FOR POWER SYSTEM CONTROLLER DEVICE | ANDERSON, BRODERICK C | 2178 | §103 | Final Rejection | — | Pending | Jun 28, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial