Tech Center 3600 • Art Units: 2415 2419 2437 2483 3600
This examiner grants 66% of resolved cases
Deborah J. Reynolds, an examiner in Tech Center 3600 and Art Unit 2415, has handled 164 resolved cases. Her allowance rate of 66.5% indicates a generally favorable environment, with a majority of her cases resulting in a grant. This rate provides a solid baseline for applicants to gauge their prospects for success when their applications are assigned to her docket.
The median days to allowance is 979, which is a standard timeframe for reaching a final grant. The data also reveals an interview lift of 13.8%. This figure shows that conducting an interview can provide a meaningful boost to the chances of allowance, increasing the probability beyond the 66.5% baseline and helping to resolve any outstanding issues more efficiently through direct communication.
With 164 resolved cases, the 13.8% interview lift is a statistically grounded reason to consider an interview. The 979-day median duration offers a predictable timeline for prosecution. Practitioners should view the combination of a 66.5% allowance rate and a positive interview lift as an opportunity to secure patent rights effectively within Art Unit 2415 by engaging proactively with the examiner.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18007954 | METHOD AND DEVICE FOR TRANSMITTING OR RECEIVING DATA BY USING DUAL CONNECTIVITY OF IAB NODE IN WIRELESS COMMUNICATION SYSTEM | Final Rejection | Samsung Electronics Co., Ltd. |
| 17883528 | FEEDBACK GENERATION FOR LINK ADAPTATION | Non-Final OA | Samsung Electronics Co., Ltd. |
| 17944776 | DEVICE, SYSTEM, AND METHOD FOR BLOCK ACKNOWLEDGEMENT (ACK) (BA) OPERATIONS | Non-Final OA | NXP USA, Inc. |
| 18519916 | PHYSICAL DOWNLINK CONTROL CHANNEL (PDCCH) MONITORING ADAPTATION FOR TWO STAGE DOWNLINK CONTROL INFORMATION (DCI) | Final Rejection | QUALCOMM Incorporated |
| 18301467 | TRANSMISSION CONFIGURATIONS FOR FULL DUPLEX TRANSMISSIONS | Non-Final OA | QUALCOMM Incorporated |
| 17991666 | IN-BAND SEMI-PERSISTENT SCHEDULING (SPS) SKIPPING INDICATION | Final Rejection | QUALCOMM Incorporated |
| 17934687 | RESELECTION PROCEDURES FOR POWER SAVING IN INDUSTRIAL INTERNET OF THINGS OPERATIONS | Non-Final OA | QUALCOMM Incorporated |
| 17824834 | WAVEFORM SWITCHING FOR WIRELESS COMMUNICATIONS | Non-Final OA | QUALCOMM Incorporated |
| 18221280 | Sidelink Discontinuous Reception Operation | Final Rejection | Ofinno, LLC |
| 17555560 | METHODS AND DEVICES FOR MANAGEMENT OF THE RADIO RESOURCES | Final Rejection | Intel Corporation |
| 18510817 | Dynamically Configuring Wi-Fi Coverage in a Neighborhood | Final Rejection | Adeia Guides Inc. |
| 18164192 | COMMUNICATION CONTROL METHOD | Non-Final OA | KYOCERA Corporation |
| 18261361 | TERMINAL, RADIO COMMUNICATION METHOD, AND BASE STATION | Non-Final OA | NTT DOCOMO, INC. |
| 18038573 | TRIGGER FRAME AND UORA TRIGGER ENHANCEMENTS FOR WLAN SYSTEM | Non-Final OA | INTERDIGITAL PATENT HOLDINGS, INC. |
| 17984851 | SYSTEMS AND METHODS FOR MANAGING FEEDBACK FOR MULTICAST TRANSMISSIONS | Non-Final OA | ZTE CORPORATION |
| 18193472 | PEER GROUPING FOR MULTI-LINK OPERATIONS | Non-Final OA | Cisco Technology, Inc. |
| 17865087 | VIRTUAL 5G UE SOFTWARE STACK DISTRIBUTION AND MANAGEMENT SYSTEM | Non-Final OA | T-Mobile Innovations LLC |
| 18086411 | Handling Of Multiple Tracking Area Identifiers In Satellite Access | Final Rejection | MediaTek Singapore Pte. Ltd. |
| 17910365 | CELL MEASUREMENT METHOD AND USER EQUIPMENT | Non-Final OA | Purplevine Innovation Company Limited |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy